Charlote and Lee Counties
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. A GPX file download is provided at the bottom of the page if you'd like to import all the locations into your GPS. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad app (version 3.1+ on iOS version 16.4+) now also offers fishing coordinates, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Arc '00 Reef 1 1St Load Of 2 Loads 200-300 Pieces Of Concrete And Steel Power Poles
Date of Deployment: May 22 2000
Primary Material: CONCRETE PRECAST MATERIALS
Tonnage: 761.7
County: LEE
Depth: 58 ft

Relief: 15 ft [1]
Tides & Solunars
58 ft 26° 24' 56" N 82° 24' 49" W
Arc '00 Reef 2 Nd Load Of 2 Loads 75 Pieces Of Concrete And Steel Power Poles
Date of Deployment: May 24 2000
Primary Material: CONCRETE PRECAST MATERIALS
Tonnage: 476.1
County: LEE
Depth: 58 ft

Relief: 15 ft [1]
Tides & Solunars
58 ft 26° 24' 56" N 82° 24' 49" W
Arc Barge Site 24 Sets Of 6 Bundled Pipes And 6 Large 6’X4’x4’ Risers With Fence Enclos
Date of Deployment: June 9 1999
Primary Material: CONCRETE CULVERTS (24 SETS)
Tonnage: 209
County: LEE
Depth: 56 ft

Relief: 8 ft [1]
Tides & Solunars
56 ft 26° 24' 47" N 82° 24' 50" W
Arc Reef Arc Reef 100 Ft X 40 Ft Barge 1/94Dgps
Date of Deployment: January 26 1994
Primary Material: BARGE STEEL
County: LEE
Depth: 60 ft

Relief: 10 ft [1]
Tides & Solunars
60 ft 26° 24' 54" N 82° 24' 41" W
Arc Rubble 3Rd Of 5 Loads This Grant Concrete Culverts And Boxes
Date of Deployment: May 18 2001
Primary Material: CONCRETE PRECAST MATERIALS (110)
Tonnage: 425
County: LEE
Depth: 58 ft

Relief: 10 ft [1]
Tides & Solunars
58 ft 26° 24' 50" N 82° 24' 41" W
Arc Tet 1 Rst Of 5 Loads This Grant 5 To 6 Foot Solid Tetrahedrons
Date of Deployment: May 9 2001
Primary Material: MODULES CONCRETE TETRAHEDRONS (150)
Tonnage: 212
County: LEE
Depth: 58 ft

Relief: 10 ft [1]
Tides & Solunars
58 ft 26° 24' 52" N 82° 24' 38" W
Arc Towers Steel Radio Towers Cut Ot 25 Feet 3 Units
Date of Deployment: May 30 2002
Primary Material: STEEL TOWERS/RADIO (3)
Tonnage: 30
County: LEE
Depth: 58 ft

Relief: 25 ft [1]
Tides & Solunars
58 ft 26° 24' 58" N 82° 24' 38" W
Arc-Reefballs 84 Reefballs Of Variuos Sizes
Date of Deployment: June 11 2004
Primary Material: MODULES CONCRETE REEFBALLS (84)
Tonnage: 108
County: LEE
Depth: 57 ft

Relief: 5 ft [1]
Tides & Solunars
57 ft 26° 24' 54" N 82° 24' 40" W
Arc-Seaguard 60 Ft. Long Steel Hulled Sailboat Called The Seaguard
Date of Deployment: August 27 2004
Primary Material: SHIP STEEL 60’
County: LEE
Depth: 57 ft

Relief: 13 ft [1]
Tides & Solunars
57 ft 26° 24' 58" N 82° 24' 43" W
Arcoa Reef Second Deployment Due To Structural Failures
Date of Deployment: December 20 1994
Primary Material: MODULES PVC CONCRETE
County: LEE
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 26° 32' 25" N 82° 24' 58" W
Arcoa Reef 96 Individual Modules 15000 Square Meters
Date of Deployment: December 8 1993
Primary Material: MODULES PVC CONCRETE
County: LEE
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 26° 32' 29" N 82° 25' 5" W
Barge #1 Site Arcoa Bioreef-Prefabricated Units.
Date of Deployment: December 8 1993
Primary Material: MODULES PVC CONCRETE
County: LEE
Depth: 57 ft

Relief: 9 ft [1]
Tides & Solunars
57 ft 26° 32' 14" N 82° 25' 7" W
Belton Johnson Reef - Site 1 500 Tons Of Concrete Culverts
Date of Deployment: May 16 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 500
County: LEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 26° 25' 29" N 82° 11' 42" W
Belton Johnson Reef - Site 2 20 Pieces Of Concrete Slabs Four Loads This Project
Date of Deployment: May 10 1997
Primary Material: CONCRETE SLABS
Tonnage: 75
County: LEE
Depth: 32 ft

Relief: 5 ft [1]
Tides & Solunars
32 ft 26° 25' 24" N 82° 11' 47" W
Belton Johnson Reef - Site 3 Pilings Stacked In Lincoln Log Shape-1 1St Of Two Loads Dgps
Date of Deployment: May 16 1997
Primary Material: CONCRETE PILINGS 42
Tonnage: 51
County: LEE
Depth: 32 ft

Relief: 14 ft [1]
Tides & Solunars
32 ft 26° 25' 19" N 82° 11' 41" W
Belton Johnson Reef - Site 4 About 25 Pieces Of Concrete Culverts Inpile1rst Of Three Loads Dgps
Date of Deployment: May 30 1997
Primary Material: CONCRETE RUBBLE 25
Tonnage: 100
County: LEE
Depth: 32 ft

Relief: 5 ft [1]
Tides & Solunars
32 ft 26° 25' 17" N 82° 11' 48" W
Belton Johnson Reef - Site 5 Pilings Stacked In Lincoln Log Shape-2Nd Of Two Loads Dgps
Date of Deployment: June 30 1997
Primary Material: CONCRETE PILINGS 44
Tonnage: 54
County: LEE
Depth: 32 ft

Relief: 14 ft [1]
Tides & Solunars
32 ft 26° 25' 21" N 82° 11' 40" W
Belton Johnson Reef - Site 6 About 30 Pieces Of Flat Concrete In A Pile 2Nd Of Three Loads Dgps
Date of Deployment: July 9 1997
Primary Material: CONCRETE SLABS 30
Tonnage: 100
County: LEE
Depth: 32 ft

Relief: 8 ft [1]
Tides & Solunars
32 ft 26° 25' 33" N 82° 11' 49" W
Belton Johnson Reef - Site 7 25 Pieces Of Concrete Slabs Four Loads This Project
Date of Deployment: July 16 1997
Primary Material: CONCRETE SLABS
Tonnage: 75
County: LEE
Depth: 32 ft

Relief: 8 ft [1]
Tides & Solunars
32 ft 26° 25' 27" N 82° 12' 6" W
Blanda's Reef 45’ X 12’ X 8’ Ft. Steel Hulled Sailboat Hull
Date of Deployment: July 29 2003
Primary Material: SHIP STEEL SAILBOAT 45’
County: LEE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 25' 11" N 82° 19' 6" W
Blanda's Reef Bridge Concrete Bridge Rubble Up To 25’X3’x3’ Smallest 3’X2’x2’
Date of Deployment: June 8 2005
Primary Material: BRIDGE RUBBLE
Tonnage: 373
County: LEE
Depth: 44 ft

Relief: 12 ft [1]
Tides & Solunars
44 ft 26° 25' 11" N 82° 19' 5" W
Blanda's Reef Rock 182 Tons Of 2 Ft - 5Ft Boulders In One Stack
Date of Deployment: June 24 2005
Primary Material: ROCK-LIMESTONE BOULDERS (200)
Tonnage: 182
County: LEE
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 26° 25' 19" N 82° 19' 5" W
Boca Grande Reef 667 Yards Of Concrete Pilings And Rubble
Date of Deployment: July 3 1981
Primary Material: CONCRETE PILINGS
County: CHARLOTTE [1]
Tides & Solunars
26° 38' 12" N 82° 17' 5" W
Bokeelia Reef (B) 400 Cubic Yards Concrete Rubble And Boxes
Date of Deployment: December 31 1984
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 10 ft

Relief: 4 ft [1]
Tides & Solunars
10 ft 26° 43' 2" N 82° 9' 39" W
Boxcar Reef Csx Boxcars.
Date of Deployment: December 31 1987
Primary Material: BOXCARS
County: LEE
Depth: 72 ft
[1]
Tides & Solunars
72 ft 26° 41' 50" N 82° 36' 4" W
Cape Haze (B) Joint Project With Charlotte-,20000 Each Not An Fwc Grant
Date of Deployment: May 10 1995
Primary Material: MODULES STEEL UNITS
County: LEE
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 26° 45' 44" N 82° 9' 28" W
Cape Haze Reef (Bay) Only 5 Culvert Bundles Located No Steel Pipe Units-Not An Fwc Grant
Date of Deployment: May 10 1995
Primary Material: STEEL UNITS
County: CHARLOTTE
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 26° 45' 46" N 82° 9' 27" W
Cape Haze Reef(B) 3’ X 4’ And 2’ X 4’ Culverts 125 Pieces
Date of Deployment: February 26 2002
Primary Material: CONCRETE CULVERTS (125)
County: LEE
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 26° 45' 46" N 82° 9' 30" W
Causeway Reef #1 135- 30X30 Up To 15’ Long Concrete Piling Cutoffs 1 Of 6 Drops
Date of Deployment: September 16 2005
Primary Material: CONCRETE PILINGS - CUTOFFS (135)
Tonnage: 652
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 57" N 82° 1' 9" W
Causeway Reef #2 75- 30X30 Up To 15’ Long Concrete Piling Cutoffs 2 Of 6 Drops
Date of Deployment: February 14 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (75)
Tonnage: 604.5
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 56" N 82° 1' 5" W
Causeway Reef #3 80- 30X30 Up To 15’ Long Concrete Piling Cutoffs 3 Of 6 Drops
Date of Deployment: February 21 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (70)
Tonnage: 423
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 59" N 82° 1' 7" W
Causeway Reef #4 80- 30X30 Up To 15’ Long Concrete Piling Cutoffs 4 Of 6 Drops
Date of Deployment: March 31 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (80)
Tonnage: 490
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 57" N 82° 1' 6" W
Causeway Reef #5 70- 30X30 Up To 25’ Long Concrete Piling Cutoffs 5 Of 6 Drops
Date of Deployment: May 9 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (70)
Tonnage: 266
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 56" N 82° 1' 9" W
Causeway Reef #6 75- 30X30 Up To 25’ Long Concrete Piling Cutoffs
Date of Deployment: May 23 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (75)
Tonnage: 348
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 58" N 82° 1' 8" W
Causeway Reef #7 85- 30X30 Up To 25’ Long Concrete Piling Cutoffs 6 Of 6 Drops
Date of Deployment: June 9 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (85)
Tonnage: 348
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 56" N 82° 1' 9" W
Causeway Reef #8 85- 30X30 Up To 25’ Long Concrete Piling Cutoffs
Date of Deployment: September 6 2206
Primary Material: CONCRETE PILINGS - CUTOFFS (80)
Tonnage: 300
County: LEE
Depth: 26 ft

Relief: 8 ft [1]
Tides & Solunars
26 ft 26° 22' 54" N 82° 1' 8" W
Causeway Reef #9 70- 30X30 Up To 25’ Long Concrete Piling Cutoffs
Date of Deployment: September 11 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (70)
Tonnage: 200
County: LEE
Depth: 26 ft

Relief: 6 ft [1]
Tides & Solunars
26 ft 26° 22' 59" N 82° 1' 5" W
Charlie's Reef Two Piles Of Hopper Cars-One With 16 Cars-The Other With 24.
Date of Deployment: January 25 1994
Primary Material: BOXCARS STEEL/HOPPER
County: LEE
Depth: 90 ft

Relief: 24 ft [1]
Tides & Solunars
90 ft 26° 33' 22" N 82° 43' 22" W
Charlotte Harbor Reef (Bay) 1100 Tons Of Bridge Rubble Beams
Date of Deployment: December 31 1983
Primary Material: BRIDGE CONCRETE
Tonnage: 1100
County: CHARLOTTE
Depth: 12 ft
[1]
Tides & Solunars
12 ft 26° 50' 30" N 82° 5' 19" W
Charlotte Harbor Site (Bay) 1 Of 18 Deployments To 6/28/97 This Location And Grant (Materials North
Date of Deployment: June 15 1987
Primary Material: CONCRETE CULVERTS
Tonnage: 1115
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 30" N 82° 5' 19" W
Charlotte Harbor Site A (Bay) 18 Pallet And 35 Bay Balls West Row Due South Of These Coordinates
Date of Deployment: May 7 1999
Primary Material: MODULES CONCRETE REEFBALLS (53)
Tonnage: 21
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 59" N 82° 5' 19" W
Charlotte Harbor Site A (Bay) 18 Pallet And 35 Bay Balls West Row Due South Of These Coordinates
Date of Deployment: December 2 1999
Primary Material: MODULES CONCRETE REEFBALLS (53)
Tonnage: 30
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 51' 30" N 82° 5' 19" W
Charlotte Harbor Site B (Bay) 17 Pallet And 35 Bay Balls East Row Due South Of These Coordinates
Date of Deployment: May 7 1999
Primary Material: MODULES CONCRETE REEFBALLS (52)
Tonnage: 21
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 59" N 82° 5' 18" W
Charlotte Harbor Site B (Bay) 17 Pallet And 35 Bay Balls East Row Due South Of These Coordinates
Date of Deployment: December 2 1999
Primary Material: MODULES CONCRETE REEFBALLS (52)
Tonnage: 30
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 51' 30" N 82° 5' 18" W
Charlotte Harbour #1 (Bay) 1 Of 7 Deployments This Location This Grant To 5/9/91 (North Of Co
Date of Deployment: March 1 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 228
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 39" N 82° 5' 19" W
County M-13 Site Concrete Culverts Second Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 26° 55' 0" N 82° 28' 0" W
County M-13 Site Concrete Culverts Fifth Of 5 Drops 2 Loads 2 Drops This Date
Date of Deployment: June 28 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 232
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 26° 55' 1" N 82° 27' 58" W
County M-13 Site Concrete Culverts Third Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: SARASOTA
Depth: 42 ft

Relief: 2 ft [1]
Tides & Solunars
42 ft 26° 55' 7" N 82° 27' 54" W
County M-13 Site Concrete Culverts Fourth Of 5 Drops 2 Loads 2 Drops This Date
Date of Deployment: June 28 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: SARASOTA
Depth: 42 ft

Relief: 4 ft [1]
Tides & Solunars
42 ft 26° 55' 8" N 82° 27' 54" W
County M-13 Site Concrete Culverts First Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: SARASOTA
Depth: 42 ft

Relief: 2 ft [1]
Tides & Solunars
42 ft 26° 55' 8" N 82° 27' 54" W
Danger Reef On Starboard Side 40’ Long No Superstructure 50% Deteriorated
Date of Deployment: December 31 1988
Primary Material: SHIP STEEL CREWBOAT
County: CHARLOTTE
Depth: 12 ft

Relief: 6 ft [1]
Tides & Solunars
12 ft 26° 45' 33" N 82° 11' 10" W
Doc Kline Lincolin Logs 2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’
Date of Deployment: September 5 2000
Primary Material: CONCRETE PILINGS
County: LEE
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 26° 20' 21" N 82° 5' 24" W
E-F (Jaycees) Reef 310 Tons Of Concrete Culverts.
Date of Deployment: June 30 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 310
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 5" N 82° 5' 21" W
E-F (Jaycees) Reef 225 Tons Of Concrete Culverts.
Date of Deployment: June 7 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 225
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 82° 5' 21" W
E-F (Jaycees) Reef 300 Tons Of Precast Concrete.
Date of Deployment: June 30 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 82° 5' 33" W
Eca Reef Concrete Rubble And Steel I Beams ,10000 Funded By Eca
Date of Deployment: May 24 2001
Primary Material: CONCRETE RUBBLE (200)
Tonnage: 319.1
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 22" N 81° 52' 21" W
Edison Bridge 14000 Cubic Yards Of Rubble From Edison Bridge.
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE
County: LEE
Depth: 40 ft

Relief: 15 ft [1]
Tides & Solunars
40 ft 26° 18' 7" N 82° 13' 30" W
Edison Bridge Part Of Grant # C-7710
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE
County: LEE
Depth: 40 ft
[1]
Tides & Solunars
40 ft 26° 18' 24" N 82° 13' 28" W
Edison Reef #1 Edison Bridge #1 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 42" N 82° 13' 24" W
Edison Reef #2 Edison Bridge #2 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 37" N 82° 13' 19" W
Edison Reef #3 Edison Bridge #3 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 35" N 82° 13' 8" W
Edison Reef #4 Edison Bridge #4 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 32" N 82° 13' 15" W
Edison Reef #5 Edison Bridge #5 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 31" N 82° 12' 59" W
Edison Reef #6 Edison Bridge #6 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 30" N 82° 13' 32" W
Edison Reef #7 Edison Bridge #7 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 27" N 82° 12' 22" W
Edison Reef #8 Edison Bridge #8 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 24" N 82° 13' 12" W
Englewood Fish Haven Bridge Rubble
Date of Deployment: December 31 1960
Primary Material: BRIDGE RUBBLE
County: CHARLOTTE
Depth: 22 ft
[1]
Tides & Solunars
22 ft 26° 54' 42" N 82° 21' 48" W
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 26 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 82° 5' 7" W
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 25 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 82° 5' 7" W
Evan Thompson Reef Units Five 7’ X 7’ Slabs With Two Culverts Each
Date of Deployment: May 27 2000
Primary Material: CONCRETE CULVERTS (10)
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 82° 5' 7" W
Ft. Myers Wharf 4800 Tons Of Concrete Rubble And Rip Rap-Located About 50’ Offshore.
Date of Deployment: December 31 1985
Primary Material: CONCRETE RUBBLE
Tonnage: 4800
County: LEE [1]
Tides & Solunars
26° 38' 26" N 81° 52' 29" W
G-H Reef 110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters.
Date of Deployment: August 1 1984
Primary Material: BARGE STEEL
County: LEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 26° 20' 35" N 81° 57' 14" W
G-H Reef Limestone Added To Previous Materials.
Date of Deployment: May 7 1994
Primary Material: ROCK LIMESTONE
Tonnage: 510
County: LEE
Depth: 28 ft

Relief: 6 ft [1]
Tides & Solunars
28 ft 26° 20' 39" N 81° 57' 31" W
G-H Reef 8 Concrete And Screen Juvenile Habitats Large Diameter Vertical
Date of Deployment: December 14 1995
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 27 ft

Relief: 8 ft [1]
Tides & Solunars
27 ft 26° 20' 40" N 81° 56' 42" W
G-H Reef Concrete Culverts 4.5 Miles From Big Carlos Pass
Date of Deployment: May 24 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 450
County: LEE
Depth: 28 ft
[1]
Tides & Solunars
28 ft 26° 20' 45" N 81° 57' 11" W
Helens Barges Two Steel Barges
Date of Deployment: June 21 2001
Primary Material: BARGE STEEL (60’)
County: LEE
Depth: 30 ft

Relief: 6 ft [1]
Tides & Solunars
30 ft 26° 37' 56" N 82° 17' 10" W
Helens Reef Helens Reef Concrete Poles 12/88Dgps
Date of Deployment: December 31 1988
Primary Material: CONCRETE POLES
County: LEE
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 26° 38' 1" N 82° 17' 5" W
Lee-Collier Lee-Collierbusses10/87Dgps
Date of Deployment: October 31 1987
Primary Material: STEEL BUSES
County: LEE
Depth: 35 ft
[1]
Tides & Solunars
35 ft 26° 17' 26" N 81° 55' 3" W
M-14 550 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment:
Primary Material: CONCRETE CULVERTS
County: SARASOTA
Depth: 43 ft

Relief: 5 ft [1]
Tides & Solunars
43 ft 26° 52' 14" N 82° 26' 26" W
M-14 550 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment: May 1 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 550
County: CHARLOTTE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 52' 16" N 82° 26' 26" W
M.A.Y. Reef May Reef Rubble 11/86Dgps
Date of Deployment: November 30 1986
Primary Material: CONCRETE RUBBLE
County: LEE
Depth: 20 ft
[1]
Tides & Solunars
20 ft 26° 22' 44" N 81° 55' 23" W
Mary's Reef 1 1St Of 3 Loads This Grant All On Same Location
Date of Deployment: June 19 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319.1
County: LEE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 46' 14" N 82° 18' 26" W
Mary's Reef 1 1St Of 3 Loads This Grant All On Same Location
Date of Deployment: June 13 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319.1
County: LEE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 46' 14" N 82° 18' 26" W
Mary's Reef 1 1St Of 3 Loads This Grant All On Same Location
Date of Deployment: June 16 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319.1
County: LEE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 46' 14" N 82° 18' 26" W
Mary's Reef Mary’s Reef Concrete Culverts 1988 Dgps
Date of Deployment: December 31 1988
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 30 ft

Relief: 6 ft [1]
Tides & Solunars
30 ft 26° 46' 11" N 82° 18' 21" W
Marys Reef Site #3 Concrete Culverts Of Various Sizes-Located
Date of Deployment: June 13 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319
County: CHARLOTTE
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 26° 46' 14" N 82° 18' 26" W
Marys Reef Site #3 Concrete Culverts Of Various Sizes-Located
Date of Deployment: June 16 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319
County: CHARLOTTE
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 26° 46' 14" N 82° 18' 26" W
Marys Reef Site #3 Concrete Culverts Of Various Sizes-Located
Date of Deployment: June 19 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319
County: CHARLOTTE
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 26° 46' 14" N 82° 18' 26" W
May Reef - #1 Concrete Pieces (160) In Two Loads At Same Coordinates
Date of Deployment: March 23 1999
Primary Material: CONCRETE BOXES
County: LEE
Depth: 22 ft

Relief: 10 ft [1]
Tides & Solunars
22 ft 26° 22' 23" N 81° 55' 7" W
May Reef - #2 160 Pieces Concrete In Two Loads
Date of Deployment: March 19 1999
Primary Material: CONCRETE BOXES
County: LEE
Depth: 22 ft

Relief: 10 ft [1]
Tides & Solunars
22 ft 26° 22' 23" N 81° 55' 7" W
Novak Reef - Site 1 Concrete Bridge Rubble 1 Of 4 Deployments Fdot Funded
Date of Deployment: April 14 2003
Primary Material: CONCRETE BRIDGE SECTIONS (18)
Tonnage: 360
County: CHARLOTTE
Depth: 29 ft

Relief: 7 ft [1]
Tides & Solunars
29 ft 26° 48' 34" N 82° 19' 42" W
Novak Reef - Site 2 Concrete Bridge Rubble 2 Of 4 Deployments Fdot Funded
Date of Deployment: April 16 2003
Primary Material: CONCRETE BRIDGE SECTIONS (24)
Tonnage: 464
County: CHARLOTTE
Depth: 30 ft

Relief: 6 ft [1]
Tides & Solunars
30 ft 26° 48' 34" N 82° 19' 42" W
Novak Reef - Site 3 Concrete Bridge Rubble 3 Of 4 Deployments Fdot Funded
Date of Deployment: April 18 2003
Primary Material: CONCRETE BRIDGE SECTIONS (22)
Tonnage: 464
County: CHARLOTTE
Depth: 30 ft

Relief: 7 ft [1]
Tides & Solunars
30 ft 26° 48' 34" N 82° 19' 42" W
Novak Reef - Site 4 Concrete Bridge Rubble 4 Of 4 Deployments Fdot Funded
Date of Deployment: April 21 2003
Primary Material: CONCRETE BRIDGE SECTIONS (24)
Tonnage: 480
County: CHARLOTTE
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 26° 48' 34" N 82° 19' 42" W
Novak Reef - Site 4-1 Concrete Culverts Of Various Sizes 2 Of 8 Drops This Grant
Date of Deployment: July 8 2004
Primary Material: CONCRETE CULVERTS (140)
Tonnage: 116
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 30" N 82° 19' 32" W
Novak Reef - Site 4-2 Concrete Culverts Of Various Sizes 3 Of 8 Drops This Grant
Date of Deployment: July 9 2004
Primary Material: CONCRETE CULVERTS (81)
Tonnage: 110
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 40" N 82° 19' 37" W
Novak Reef - Site 4-3 Concrete Culverts Of Various Sizes 4 Of 8 Drops This Grant
Date of Deployment: July 12 2004
Primary Material: CONCRETE CULVERTS (88)
Tonnage: 100
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 41" N 82° 19' 36" W
Novak Reef - Site 4-4 Concrete Culverts Of Various Sizes 7 Of 8 Drops This Grant
Date of Deployment: July 15 2004
Primary Material: CONCRETE CULVERTS (151)
Tonnage: 111
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 39" N 82° 19' 32" W
Novak Reef - Site 4-5 Concrete Culverts Of Various Sizes 1 Of 8 Drops This Grant
Date of Deployment: July 7 2004
Primary Material: CONCRETE CULVERTS (107)
Tonnage: 101
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 39" N 82° 19' 32" W
Novak Reef - Site 4-6 Concrete Culverts Of Various Sizes 5 Of 8 Drops This Grant
Date of Deployment: July 13 2004
Primary Material: CONCRETE CULVERTS (115)
Tonnage: 110
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 36" N 82° 19' 39" W
Novak Reef - Site 4-7 Concrete Culverts Of Various Sizes 6 Of 8 Drops This Grant
Date of Deployment: July 14 2004
Primary Material: CONCRETE CULVERTS (151)
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 36" N 82° 19' 39" W
Novak Reef - Site 4-8 Concrete Culverts Of Various Sizes 8 Of 8 Drops This Grant
Date of Deployment: July 16 2004
Primary Material: CONCRETE CULVERTS (140)
Tonnage: 111
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 39" N 82° 19' 32" W
On Shoreline Not A Fishing Site-Used To Stabilize Shoreline.
Date of Deployment: October 10 1986
Primary Material: ROCK RIP RAP
County: LEE [1]
Tides & Solunars
26° 38' 30" N 81° 52' 30" W
Pace #10 78 Pieces Of Concrete Culverts About 8’X4’x5’
Date of Deployment: May 5 2006
Primary Material: CONCRETE CULVERTS (78)
Tonnage: 320
County: LEE
Depth: 35 ft

Relief: 8 ft [1]
Tides & Solunars
35 ft 26° 31' 13" N 82° 16' 59" W
Pace #8 Limestone Added To Previous Materials 2 To 5 Foot Boulders.
Date of Deployment: April 25 2006
Primary Material: ROCK LIMESTONE
Tonnage: 444.5
County: LEE
Depth: 35 ft

Relief: 9 ft [1]
Tides & Solunars
35 ft 26° 31' 6" N 82° 16' 54" W
Pace Rub 1 4Th Of 5 Loads This Grant Concrete Culverts And Boxes
Date of Deployment: May 21 2001
Primary Material: CONCRETE PRECAST MATERIALS (100)
Tonnage: 318
County: LEE
Depth: 36 ft

Relief: 17 ft [1]
Tides & Solunars
36 ft 26° 31' 14" N 82° 17' 4" W
Pace Rub 2 5Th Of 5 Loads This Grant Concrete Culverts And Boxes
Date of Deployment: May 29 2001
Primary Material: CONCRETE PRECAST MATERIALS (100)
Tonnage: 318
County: LEE
Depth: 36 ft

Relief: 17 ft [1]
Tides & Solunars
36 ft 26° 31' 15" N 82° 16' 56" W
Pace Tet 2 Nd Of 5 Loads This Grant 5 To 6 Foot Solid Tetrahedrons
Date of Deployment: May 15 2001
Primary Material: MODULES CONCRETE TETRAHEDRONS (150)
Tonnage: 212
County: LEE
Depth: 36 ft

Relief: 14 ft [1]
Tides & Solunars
36 ft 26° 31' 15" N 82° 17' 0" W
Pace's Place #1- Big Rubble 10 Septic Tanks 8 Manhole Risers And 60 Tons Limestone In An East-Wes
Date of Deployment: February 29 2000
Primary Material: CONCRETE PRECAST MATERIALS
Tonnage: 180
County: LEE
Depth: 36 ft

Relief: 10 ft [1]
Tides & Solunars
36 ft 26° 31' 4" N 82° 17' 1" W
Pace's Place Barge Reef 110’ X 35’ X 9’ Steel Deck Barge And 75’ X 10’ X 8’ Crane/Boom
Date of Deployment: June 15 2000
Primary Material: BARGE STEEL DECK
County: LEE
Depth: 34 ft

Relief: 12 ft [1]
Tides & Solunars
34 ft 26° 31' 10" N 82° 16' 57" W
Pace's Place Reef-Juvenile Habitats 28 Experimental Concrete And Steel Juvenile Fish Habitats
Date of Deployment: June 28 2005
Primary Material: CONCRETE JUVENILE FISH REFUGE HABIT
Tonnage: 8
County: LEE
Depth: 34 ft

Relief: 5 ft [1]
Tides & Solunars
34 ft 26° 31' 10" N 82° 16' 58" W
Palm Island Barge Reef Steel Barge 70’Lx23’wx8’t And 30 Pieces Of Concrete And 1’ X 40’ Steel Spu
Date of Deployment: May 21 1999
Primary Material: BARGE STEEL 70’
Tonnage: 40
County: CHARLOTTE
Depth: 56 ft

Relief: 8 ft [1]
Tides & Solunars
56 ft 26° 49' 13" N 82° 31' 53" W
Palm Island Ferry Reef Steel Car Ferry 60X20x5’ Concrete Boxes And Pilings Also
Date of Deployment: March 12 1999
Primary Material: SHIP STEEL FERRY 60’
Tonnage: 35
County: CHARLOTTE
Depth: 55 ft

Relief: 5 ft [1]
Tides & Solunars
55 ft 26° 49' 14" N 82° 31' 57" W
Pegasus Tugboat 110’Lx28’wx36’h Steel Tugboat Pegasus
Date of Deployment: July 9 1999
Primary Material: SHIP STEEL TUGBOAT (110’)
County: LEE
Depth: 85 ft

Relief: 36 ft [1]
Tides & Solunars
85 ft 26° 33' 8" N 82° 43' 25" W
Power Pole Reef Power Pole Barge And Crane8/92Gps
Date of Deployment: August 31 1992
Primary Material: BARGE STEEL
County: LEE
Depth: 45 ft
[1]
Tides & Solunars
45 ft 26° 40' 57" N 82° 22' 28" W
Redfish Pass Reef - #1 Steel Barge. About 50’X25’x9h
Date of Deployment: June 17 1989
Primary Material: BARGE STEEL
County: LEE
Depth: 24 ft
[1]
Tides & Solunars
24 ft 26° 33' 30" N 82° 14' 34" W
Redfish Pass Reef - #2 Steel Barge. About 50’X30’x9h
Date of Deployment: June 17 1989
Primary Material: BARGE STEEL
County: LEE
Depth: 26 ft

Relief: 10 ft [1]
Tides & Solunars
26 ft 26° 33' 39" N 82° 14' 12" W
Rock Reef - #1 About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant
Date of Deployment: June 4 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 25" N 81° 52' 27" W
Rock Reef - #2 About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant
Date of Deployment: June 9 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 5 ft [1]
Tides & Solunars
24 ft 26° 18' 17" N 81° 52' 23" W
Rock Reef - #3 About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 27" N 81° 52' 23" W
Rock Reef - #4 About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 20" N 81° 52' 17" W
Sanibel Reef Sanibel Concrete Rubble 6/88450Yddgps
Date of Deployment: June 30 1988
Primary Material: CONCRETE RUBBLE
County: LEE
Depth: 20 ft
[1]
Tides & Solunars
20 ft 26° 24' 57" N 82° 3' 10" W
School Bus Reef - #1 Concrete Culverts 2/93Dgps
Date of Deployment: February 28 1993
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 64 ft
[1]
Tides & Solunars
64 ft 26° 36' 22" N 82° 28' 13" W
School Bus Reef - #2 - 1 51 Concrete Pilings Stacked 16 Feet Tall
Date of Deployment: June 1 1998
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 142
County: LEE
Depth: 68 ft

Relief: 16 ft [1]
Tides & Solunars
68 ft 26° 36' 2" N 82° 28' 15" W
School Bus Reef - #2 - 2 50 Concrete Pilings Stacked In Square 16 Feet Tall 2Nd Of Two
Date of Deployment: June 8 1998
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 142
County: LEE
Depth: 68 ft

Relief: 16 ft [1]
Tides & Solunars
68 ft 26° 35' 58" N 82° 28' 21" W
Sherman's Reef Barge Sherman’s Barge Dgps
Date of Deployment: December 31 1992
Primary Material: BARGE STEEL
County: LEE
Depth: 60 ft
[1]
Tides & Solunars
60 ft 26° 32' 53" N 82° 24' 56" W
Shirley D Shrimp Boat 48 Foot Long Steel Shrimp Boat
Date of Deployment: April 9 1997
Primary Material: SHIP STEEL 48
County: LEE
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 26° 32' 56" N 82° 24' 50" W
South Reef Seven Barge Loads Of 1’ To 6’ Limestone Boulders From 8/29/02
Date of Deployment: November 6 2002
Primary Material: ROCK-LIMESTONE BOULDERS
Tonnage: 1000
County: LEE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 25' 16" N 82° 19' 2" W
Stump Pass 3 Mile Reef Concrete Culverts- 3 Dates Same Numbers
Date of Deployment: May 15 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 176
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 82° 26' 26" W
Stump Pass 3 Mile Reef Concrete Culverts- 3 Dates Same Numbers
Date of Deployment: May 19 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 196
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 82° 26' 26" W
Stump Pass 3 Mile Reef Concrete Culverts- 3 Datessame Numbers
Date of Deployment: May 21 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 175
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 82° 26' 26" W
Tremblay Reef - #1 Concrete Bridge Rubble 3 Deployments Same Numbers Also 5/7 And 5/22
Date of Deployment: May 28 2003
Primary Material: CONCRETE BRIDGE RUBBLE (60)
County: CHARLOTTE
Depth: 41 ft

Relief: 11 ft [1]
Tides & Solunars
41 ft 26° 48' 21" N 82° 22' 42" W
Tremblay Reef - Barge Steel Deck Barge 90 Ft X 23 Ft X 8 Ft
Date of Deployment: January 6 2005
Primary Material: BARGE STEEL 90’
County: CHARLOTTE
Depth: 42 ft

Relief: 8 ft [1]
Tides & Solunars
42 ft 26° 48' 25" N 82° 22' 39" W
Vixen Wreck 57 Foot Long X 14 Foot Wide Wood Vessel Called Vixen
Date of Deployment: February 1 1997
Primary Material: SHIP WOOD 57’
County: LEE
Depth: 60 ft

Relief: 20 ft [1]
Tides & Solunars
60 ft 26° 32' 50" N 82° 24' 48" W
Wiggins Pass 3 Mile C And D Rubble And Culverts County Funded-,29379.00
Date of Deployment: October 1 2003
Primary Material: CONCRETE RUBBLE (600)
Tonnage: 652.8
County: COLLIER
Depth: 27 ft

Relief: 10 ft [1]
Tides & Solunars
27 ft 26° 18' 19" N 81° 52' 26" W
Wiggins Pass 4.5 Mile Reef Steel Barge And Crane
Date of Deployment: February 4 1987
Primary Material: BARGE STEEL
County: COLLIER
Depth: 31 ft

Relief: 5 ft [1]
Tides & Solunars
31 ft 26° 17' 28" N 81° 55' 10" W
Wiggins Pass 5 Mile School Buses Coke And Other Soft Drink Trucks.
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 28" N 81° 55' 48" W
Wiggins Pass 5 Mile School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 29" N 81° 55' 49" W
Wildmans Reef 80 Foot Concrete Sailboat
Date of Deployment: October 20 2004
Primary Material: SHIP CONCRETE SAILBOAT 50’
County: LEE
Depth: 36 ft

Relief: 16 ft [1]
Tides & Solunars
36 ft 26° 31' 11" N 82° 17' 3" W