Gulf County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. A GPX file download is provided at the bottom of the page if you'd like to import all the locations into your GPS. Note that they may also include locations from nearby areas. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. If you have any feedback, or want to suggest any additional sites, please feel free to Contact Us.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Arizona Chemical Steel Heat Exchanger 4’ Diameter By 60’ Feet Long
Date of Deployment: May 30 2000
Primary Material: STEEL HEAT EXCHANGER
County: BAY
Depth: 66 ft

Relief: 4 ft [1]
Tides & Solunars
66 ft 29° 53' 21" N 85° 32' 0" W
Barrier Dunes Barge 200 Foot Barge Wreck
Date of Deployment: December 31 1987
Primary Material: BARGE STEEL
County: GULF
Depth: 35 ft

Relief: 10 ft [1]
Tides & Solunars
35 ft 29° 45' 3" N 85° 25' 33" W
Beanie And Hosehead Reef 3 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 23 ft

Relief: 6 ft [1]
Tides & Solunars
23 ft 29° 53' 50" N 85° 28' 9" W
Bell Shoal 2 Nd Of Two Drops Of Reefballs This Date
Date of Deployment: June 14 2000
Primary Material: MODULES CONCRETE REEFBALLS (36)
Tonnage: 108
County: BAY
Depth: 21 ft

Relief: 6 ft [1]
Tides & Solunars
21 ft 29° 54' 29" N 85° 28' 28" W
Blackfin Reef Blackfin Reef 10 Reefballs
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 60 ft

Relief: 3 ft [1]
Tides & Solunars
60 ft 29° 53' 6" N 85° 32' 6" W
Bobby Guilford Site Concrete Rubble Deployed In Two Trips This Day
Date of Deployment: August 9 2004
Primary Material: CONCRETE PILINGS
Tonnage: 412
County: BAY
Depth: 65 ft

Relief: 8 ft [1]
Tides & Solunars
65 ft 29° 53' 14" N 85° 32' 37" W
Brian Moeller Reef 2 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 29° 53' 57" N 85° 28' 16" W
C Of C Reef Concrete Rubble And Prefabricated Concrete
Date of Deployment: December 31 1964
Primary Material: CONCRETE RUBBLE
County: GULF
Depth: 40 ft
[1]
Tides & Solunars
40 ft 29° 49' 56" N 85° 29' 54" W
Captain Mike Neal's Reef 31 Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 53' 57" N 85° 30' 39" W
Captain Mike Neal's Reef#2 Funded By The Mexico Beach Artificial Reef Association
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Relief: 3 ft [1]
Tides & Solunars
29° 53' 55" N 85° 30' 42" W
Captain Toms Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 20 ft
[1]
Tides & Solunars
20 ft 29° 54' 6" N 85° 27' 34" W
Car Body Site Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 19 1999
Primary Material: CONCRETE CULVERTS (30)
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 20" N 85° 32' 58" W
Car Body Site Ave. Center Of 21 Modules 21-Fish Havens (Fh) (Complex#2 Of 5)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(21)
Tonnage: 23
County: BAY
Depth: 65 ft

Relief: 5 ft [1]
Tides & Solunars
65 ft 29° 53' 26" N 85° 32' 41" W
Car Body Site Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(22)
Tonnage: 32
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 38" N 85° 31' 36" W
Car Body Site Ave. Center Of 16 Modules Fish Haven Towers(Complex#3 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(16)
Tonnage: 30
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 39" N 85° 32' 23" W
Car Body Site Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 19 1999
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 47" N 85° 32' 49" W
Car Body Site 98 Large Reefballs In Two Stacks On Each Site Of Barge
Date of Deployment: June 14 2001
Primary Material: MODULES CONCRETE REEFBALLS (98)
Tonnage: 183.6
County: BAY
Depth: 54 ft

Relief: 8 ft [1]
Tides & Solunars
54 ft 29° 53' 53" N 85° 31' 47" W
Car Body Site Center Of 12 Modules Fish Haven Tower Units (Complex# 4 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(12)
Tonnage: 23
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 54' 24" N 85° 32' 10" W
Carbody 105 Reefballs Two Drop Dates Also 7/8/03
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS (105)
Tonnage: 364.84
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 29° 53' 38" N 85° 32' 38" W
Carbody 95 Reefballs All In One Location
Date of Deployment: June 12 2002
Primary Material: MODULES CONCRETE REEFBALLS (95)
Tonnage: 183.6
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 29° 53' 47" N 85° 32' 1" W
Carbody 38 Reefballs Two Drop Dates Also 4/22/04
Date of Deployment: June 8 2004
Primary Material: MODULES CONCRETE REEFBALLS (38)
County: BAY
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 29° 53' 52" N 85° 32' 34" W
Carbody 37 Goliath Reefballs 1 Of 2 Drop Dates Also 6/8/04
Date of Deployment: April 22 2004
Primary Material: MODULES CONCRETE REEFBALLS (37)
County: BAY
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 29° 53' 53" N 85° 32' 36" W
Carbody-Mbara 4 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (4)
Tonnage: 4
County: BAY
Depth: 60 ft

Relief: 10 ft [1]
Tides & Solunars
60 ft 29° 54' 8" N 85° 32' 23" W
Charles House Reef 5 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 9" N 85° 32' 36" W
Fish America Foundation Reef 100 Reefballs Funded By ,30000 Fish America Grant
Date of Deployment: February 12 2003
Primary Material: MODULES CONCRETE REEFBALLS (100)
Tonnage: 200
County: BAY
Depth: 67 ft

Relief: 8 ft [1]
Tides & Solunars
67 ft 29° 53' 38" N 85° 32' 38" W
Gateway Barge 70 Foot Barge Steel Tanks Tires And Boxcars
Date of Deployment: December 31 1988
Primary Material: BARGE STEEL 70’
County: GULF
Depth: 80 ft

Relief: 8 ft [1]
Tides & Solunars
80 ft 29° 50' 14" N 85° 34' 52" W
Hammerhead Reef Hammerhead Reefs 10 Reefballs
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 45 ft

Relief: 3 ft [1]
Tides & Solunars
45 ft 29° 53' 19" N 85° 31' 27" W
Inshore Mexico Bch - Amberjack 9 4Th Of 11 Drops This Date Amberjack 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 25" N 85° 24' 18" W
Inshore Mexico Bch - Cobia 9 4Th Of 11 Drops This Date Cobia 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 23" N 85° 24' 19" W
Inshore Mexico Bch - Grouper 10 4Th Of 11 Drops This Date Grouper 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 24" N 85° 24' 15" W
Jaycee Reef Concrete Rubble Car Bodies And Steel Containers
Date of Deployment: December 31 1987
Primary Material: CONCRETE RUBBLE
County: GULF
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 29° 50' 18" N 85° 29' 32" W
Jaycee Reef Concrete Rubble And Steel Containers.
Date of Deployment: March 1 1990
Primary Material: CONCRETE CULVERTS
County: GULF [1]
Tides & Solunars
29° 50' 25" N 85° 29' 25" W
Lst Port St. Joe 75 Foot Long Steel Lst
Date of Deployment: December 31 1993
Primary Material: SHIP STEEL LAST 75’
County: GULF
Depth: 90 ft

Relief: 10 ft [1]
Tides & Solunars
90 ft 29° 40' 25" N 85° 30' 38" W
Mbara Barge Steel Hopper Barge 195’X30’x12’ With Steel Pipes Mbara Funded ,25000
Date of Deployment: June 19 2001
Primary Material: BARGE STEEL 195’
County: BAY
Depth: 71 ft

Relief: 12 ft [1]
Tides & Solunars
71 ft 29° 53' 9" N 85° 32' 48" W
Mbara Barge Addition 1 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 9" N 85° 32' 48" W
Mexico Beach Site - #1 Scrap Steel And Tires
Date of Deployment: December 31 1979
Primary Material: STEEL SCRAP
County: GULF
Depth: 54 ft
[1]
Tides & Solunars
54 ft 29° 54' 4" N 85° 31' 60" W
Mexico Beach Site - #2 Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: GULF
Depth: 55 ft

Relief: 10 ft [1]
Tides & Solunars
55 ft 29° 54' 4" N 85° 31' 60" W
Mexico Beach Site - #3 Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: GULF
Depth: 55 ft

Relief: 10 ft [1]
Tides & Solunars
55 ft 29° 54' 0" N 85° 31' 60" W
Mexico Beach Site - #4 Split And Bundled Tires And Concrete 2 Loads Also 7/28/81
Date of Deployment: September 1 1981
Primary Material: TIRES
County: BAY
Depth: 54 ft
[1]
Tides & Solunars
54 ft 29° 54' 0" N 85° 32' 1" W
Mexico Beach Site - #5 Bundled Tires 6Th Of 11 Loads This Grant
Date of Deployment: July 28 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
29° 54' 25" N 85° 31' 47" W
Mexico Beach Site - Bluefish 4 4Th Of 11 Drops This Date Bluefish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 33" N 85° 31' 59" W
Mexico Beach Site - Bonita 7 4Th Of 11 Drops This Date Bonita Reef 10 Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 11" N 85° 31' 58" W
Mexico Beach Site - Flounder 6 4Th Of 11 Drops This Date Flounder 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 3" N 85° 31' 57" W
Mexico Beach Site - Hat #1 #17 H.Bridge3 Spans5/12/88Concrete Decks
Date of Deployment: May 12 1988
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 80
County: GULF [1]
Tides & Solunars
29° 53' 51" N 85° 31' 59" W
Mexico Beach Site - Kingfish 1 1St Of 11 Drops This Date Kingfish 3 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (3)
Tonnage: 6
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 3" N 85° 32' 37" W
Mexico Beach Site - Redfish 2 Nd Of 11 Drops This Date Redfish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 9" N 85° 31' 60" W
Mexico Beach Site - Snapper 11 4Th Of 11 Loads This Date Snapper Reef 10 Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 18" N 85° 31' 59" W
Mexico Beach Site - Spanish 3 Rd Of 11 Drops This Date Spanish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 53' 25" N 85° 31' 59" W
Phinizy Reef 4 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 25 ft

Relief: 6 ft [1]
Tides & Solunars
25 ft 29° 54' 9" N 85° 28' 26" W
Red Dove Reef Funded By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 53' 29" N 85° 32' 51" W
Sandy Reef - 1 Bridge Spans 1Rst Load Of 4
Date of Deployment: October 1 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 51" N 85° 41' 14" W
Sandy Reef - 2 Bridge Spans 2 Nd Load Of 4
Date of Deployment: October 8 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 52" N 85° 41' 19" W
Sandy Reef - 3 Bridge Spans 3 Rd Load Of 4
Date of Deployment: October 13 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 51" N 85° 41' 18" W
Sandy Reef - 4 Bridge Spans 4 4Th Load Of 4
Date of Deployment: October 30 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 106
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 50" N 85° 41' 16" W
Sandy Reef Phase II - 1 1Rst Of 4 Deployments This Date192 Reef Balls Total Patch #1
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEF BALLS(48)
County: GULF
Depth: 100 ft

Relief: 4 ft [1]
Tides & Solunars
100 ft 29° 40' 0" N 85° 41' 13" W
Sandy Reef Phase II - 2 2Nd Of 4 Deployments This Date Patch#2
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 58" N 85° 41' 9" W
Sandy Reef Phase II - 3 3Rd Of 4 Deployments This Date Patch#3
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 55" N 85° 41' 8" W
Sandy Reef Phase II - 4 4Th Of 4 Deployments This Date Patch#4
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 48" N 85° 41' 10" W
Smurfit-Stone - #2 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 18 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 14" N 85° 32' 26" W
Smurfit-Stone - #3 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 19 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 50" N 85° 32' 34" W
Smurfit-Stone - #4 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 18 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 53' 50" N 85° 32' 1" W
Smurfit-Stone - #5 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: October 25 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 54' 9" N 85° 31' 39" W
Smurfit-Stone - #6 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: October 25 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 26" N 85° 31' 44" W
Triggerfish Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 54' 1" N 85° 32' 38" W
Unnamed Concrete Pipes And Junction Boxes 112 Pieces 1Rst Of 2 Loads This Gran
Date of Deployment: June 26 2001
Primary Material: CONCRETE PRECAST STRUCTURES (112)
Tonnage: 160.1
County: BAY
Depth: 52 ft

Relief: 8 ft [1]
Tides & Solunars
52 ft 29° 53' 42" N 85° 31' 17" W
Unnamed Concrete Pipes And Junction Boxes 112 Pieces 2Nd Of 2 Loads This Grant
Date of Deployment: June 28 2001
Primary Material: CONCRETE PRECAST STRUCTURES (117)
Tonnage: 190.1
County: BAY
Depth: 52 ft

Relief: 8 ft [1]
Tides & Solunars
52 ft 29° 53' 42" N 85° 31' 17" W
Unnamed 30-40 Pieces Culverts/Boxes/Risers
Date of Deployment: December 10 1999
Primary Material: CONCRETE PRECAST STRUCTURES
County: BAY
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 54' 28" N 85° 27' 50" W
Virginia Reef - Site 1 Boat Hulls-Metal Crates-And Concrete Rubble.
Date of Deployment: August 2 1991
Primary Material: SHIP FIBERGLASS BOAT HULL
County: GULF
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 50' 50" N 85° 31' 30" W
Virginia Reef - Site 2 Bridge Rubble-Concrete Boxes-And Steel Hoppers.
Date of Deployment: July 20 1993
Primary Material: BRIDGE RUBBLE
County: GULF
Depth: 66 ft

Relief: 15 ft [1]
Tides & Solunars
66 ft 29° 50' 33" N 85° 31' 31" W