Wakulla County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad app (version 3.1+ on iOS version 16.4+) now also offers fishing coordinates, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Dog Ballard Phase 1 253 Tons Of Concrete Culverts.
Date of Deployment: August 8 1994
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 26 ft

Relief: 5 ft [1]
Tides & Solunars
26 ft 29° 57' 3" N 84° 4' 51" W
Dog Ballard Phase 2 Non-Grant Project Large Concrete Poles
Date of Deployment: August 8 1994
Primary Material: CONCRETE POLES
County: WAKULLA
Depth: 25 ft

Relief: 10 ft [1]
Tides & Solunars
25 ft 29° 57' 7" N 84° 4' 49" W
Dog Ballard Phase 3 108 - 1 Meter Square Cubes Placed In A Tight Square
Date of Deployment: June 18 1996
Primary Material: MODULES CONCRETE CUBES (108)
Tonnage: 135
County: WAKULLA
Depth: 26 ft

Relief: 3 ft [1]
Tides & Solunars
26 ft 29° 57' 3" N 84° 4' 49" W
Marker 24 Barge (W) Steel Barge Upside Down Near Marker 24 Non Permitted Site
Date of Deployment: December 31 1986
Primary Material: BARGE STEEL
County: WAKULLA
Depth: 29 ft

Relief: 8 ft [1]
Tides & Solunars
29 ft 29° 50' 23" N 84° 9' 24" W
Marker 24 Barge North First Of Three Drops This Grant 93 Pieces 8’X15 8X30 8’X36
Date of Deployment: June 16 1999
Primary Material: CONCRETE CULVERTS (93)
Tonnage: 114
County: WAKULLA
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 29° 50' 25" N 84° 9' 24" W
Marker 24 Barge North And South 3Rd Of 3 Drops This Grant 65 Pieces 8’X18 8X30 8’X36
Date of Deployment: June 30 1999
Primary Material: CONCRETE CULVERTS (65)
Tonnage: 146
County: WAKULLA
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 29° 50' 25" N 84° 9' 24" W
Marker 24 Barge South 2Nd Of 3 Drops This Grant 80 Pieces 8’X15 8X30 8’X36 8’X48
Date of Deployment: June 28 1999
Primary Material: CONCRETE CULVERTS (80)
Tonnage: 127
County: WAKULLA
Depth: 31 ft

Relief: 5 ft [1]
Tides & Solunars
31 ft 29° 50' 21" N 84° 9' 24" W
Oar-2K Reef 30 Towers And 12 Fish Havens In A 50 Meter Pentagon Shape
Date of Deployment: June 22 2000
Primary Material: MODULES CONCRETE FISH HAVENS (42)
Tonnage: 73
County: WAKULLA
Depth: 27 ft

Relief: 6 ft [1]
Tides & Solunars
27 ft 29° 53' 36" N 84° 7' 40" W
Oar/Wakulla Dz#1 (1) 297 Tons Of Concrete Culverts.
Date of Deployment: June 4 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 297
County: WAKULLA
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 43' 37" N 84° 18' 2" W
Oar/Wakulla Dz#1 (2) 1Rst Of Three Two Distinct Sets
Date of Deployment: May 6 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 123
County: WAKULLA
Depth: 52 ft

Relief: 13 ft [1]
Tides & Solunars
52 ft 29° 43' 44" N 84° 18' 6" W
Oar/Wakulla Dz#1 (3) 2Nd Load Of Three Deployments This Grant
Date of Deployment: May 14 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 112
County: WAKULLA
Depth: 53 ft
[1]
Tides & Solunars
53 ft 29° 43' 46" N 84° 17' 52" W
Oar/Wakulla Dz#1 (4) 140 Tons Of Culverts 3Rd Of Three Deployments This Site
Date of Deployment: May 20 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 140
County: WAKULLA
Depth: 52 ft
[1]
Tides & Solunars
52 ft 29° 43' 50" N 84° 17' 51" W
Oar/Wakulla Dz#2 (1) Second Set Of 3 Boat Molds 4 Bridge Slabs
Date of Deployment: December 6 1990
Primary Material: FIBERGLASS BOAT MOLDS
County: WAKULLA
Depth: 58 ft

Relief: 8 ft [1]
Tides & Solunars
58 ft 29° 43' 41" N 84° 18' 19" W
Oar/Wakulla Dz#2 (2) Fiberglass Boat Molds And Bridge Materials.
Date of Deployment: January 26 1991
Primary Material: FIBERGLASS BOAT MOLDS
County: WAKULLA
Depth: 58 ft

Relief: 6 ft [1]
Tides & Solunars
58 ft 29° 43' 43" N 84° 18' 30" W
Oar/Wakulla Dz#3 (1) 35 Culverts And 5 Cement Mixers Load #1 Of 6.
Date of Deployment: June 28 1990
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 43' 56" N 84° 17' 9" W
Oar/Wakulla Dz#3 (2) 35 Culverts Load #2 Of 6 Loads
Date of Deployment: June 29 1990
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 43' 56" N 84° 17' 9" W
Oar/Wakulla Dz#3 (3) 70 Culverts Load #3 Of 6 Loads
Date of Deployment: June 30 1990
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 43' 56" N 84° 17' 9" W
Oar/Wakulla Dz#3 (4) 70 Culverts Load #4 Of 6 Loads
Date of Deployment: July 1 1990
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 43' 56" N 84° 17' 9" W
Oar/Wakulla Dz#3 (5) 70 Culverts Load #5 Of 6 Loads
Date of Deployment: July 2 1990
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 43' 56" N 84° 17' 9" W
Oar/Wakulla Dz#3 (6) 67 Concrete Slabs 6 4Th Load Of 6 Loads.
Date of Deployment: July 3 1990
Primary Material: CONCRETE RUBBLE
County: WAKULLA
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 43' 56" N 84° 17' 9" W
Oar/Wakulla Dz#3 (7) 200 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment: June 21 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: WAKULLA
Depth: 55 ft

Relief: 6 ft [1]
Tides & Solunars
55 ft 29° 44' 1" N 84° 17' 17" W
Oar/Wakulla Dz#3 (8) Concrete Culverts-Concrete Tanks And Miscellaneous Concrete.
Date of Deployment: June 1 1993
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 56 ft
[1]
Tides & Solunars
56 ft 29° 44' 3" N 84° 17' 20" W
Rotary Reef - #1 Rotary Reefs 2500 Tires 200 X 300 Feet About Center Coordinates
Date of Deployment: December 31 1964
Primary Material: TIRES (2500)
County: WAKULLA
Depth: 25 ft

Relief: 3 ft [1]
Tides & Solunars
25 ft 29° 54' 49" N 84° 13' 13" W
Rotary Reef - #2 9 Separate Loads Of Pipes From 7/12/82 To 8/24/82
Date of Deployment: August 24 1982
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 54' 53" N 84° 14' 9" W
Rotary Reef - #3 Fuselage Of Dc-3 Concrete Slabs 1Rst Of 5 For Reef (8 This Grant)
Date of Deployment: May 30 1988
Primary Material: AIRPLANE DC3
County: WAKULLA
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 54' 54" N 84° 14' 8" W
Rotary Reef - #4 Concrete Culverts 2Nd Of 5 Loads This Reef (8 Loads This Grant)
Date of Deployment: June 1 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 54' 53" N 84° 14' 10" W
Rotary Reef - #5 Concrete Culverts 3Rd Of 5 Loads This Reef (8 Loads This Grant)
Date of Deployment: June 4 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 55' 6" N 84° 14' 5" W
Rotary Reef - #6 Concrete Culverts 4Th Of 5 Loads This Reef (8 Loads This Grant)
Date of Deployment: June 17 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 54' 53" N 84° 14' 9" W
Rotary Reef - #7 Concrete Culverts 5Th Of 5 Loads This Reef (8 Loads This Grant)
Date of Deployment: June 21 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 55' 11" N 84° 14' 1" W
St. Marks Reef (1) Concrete Culverts 1Rst Of 3 Loads This Reef (8 Loads For Grant)
Date of Deployment: June 8 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 59' 55" N 84° 9' 11" W
St. Marks Reef (2) Concrete Culverts 2Nd Of 3 Loads This Reef (8 Loads For The Grant)
Date of Deployment: June 15 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 59' 56" N 84° 9' 10" W
St. Marks Reef (3) Concrete Culverts 3Rd Of 3 Loads This Reefs (8 Loads For The Grant)
Date of Deployment: June 23 1988
Primary Material: CONCRETE CULVERTS
County: WAKULLA
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 59' 59" N 84° 9' 7" W
St. Marks Reef Tires St. Marks Reef Tires From A 1964 Deployment
Date of Deployment: December 31 1964
Primary Material: TIRES
County: WAKULLA
Depth: 20 ft

Relief: 3 ft [1]
Tides & Solunars
20 ft 29° 59' 57" N 84° 9' 10" W
Wakulla #1 Big Bend Reef 24 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: August 17 1995
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: WAKULLA
Depth: 27 ft

Relief: 3 ft [1]
Tides & Solunars
27 ft 29° 58' 10" N 84° 7' 55" W
Wakulla #2 Big Bend Reef 96 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: August 17 1995
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: WAKULLA
Depth: 27 ft

Relief: 3 ft [1]
Tides & Solunars
27 ft 29° 58' 8" N 84° 8' 23" W