Okaloosa County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see tide predictions and fishing times (solunar periods) by clicking the Tides & Fishing Times button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on this ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.| Coordinate Display Format: | | | ||||
|---|---|---|---|---|
| Waypoint Name | Description | Depth | Latitude | Longitude |
| "A" Leg |
East/West Chain of 28 Sites Roughly 200’ Apart-Coordinates For Center Primary Material: Module Deploy Date: 1993/07/28 Depth: 65 ft Relief: 5 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 48" N | 86° 29' 54" W |
| "B" Leg |
East/West Chain of 24 Sites Roughly 200’ Apart-Coordinates For Center Primary Material: Module Deploy Date: 1993/08/17 Depth: 65 ft Relief: 5 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 18" N | 86° 24' 35" W |
| "C" Leg |
Se/NW Chain 13 Sites Roughly 200’ Apart-Coordinates For Center Primary Material: Module Deploy Date: 1993/08/06 Depth: 65 ft Relief: 5 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 38" N | 86° 24' 26" W |
| Air Force Barge |
100’ Barge, the "Eglin Barge" Primary Material: Vessel Deploy Date: 1977/00/00 Depth: 68 ft Relief: 4 ft [1] Tides & Fishing Times |
68 ft | 30° 21' 15" N | 86° 29' 35" W |
| AJ's Bimini |
Twelve M-60 Steel Tank Turrets (only observed four 8/22/2019) Primary Material: Tank Deploy Date: 1998/05/21 Depth: 80 ft Relief: 4 ft [1] Tides & Fishing Times |
80 ft | 30° 19' 37" N | 86° 36' 10" W |
| AJ's Carey Ricks Memorial |
75’ x 20’ x 20’ Steel Vessel with Chicken Transport Devices and Superstructure. Primary Material: Vessel Deploy Date: 2011/09/23 Depth: 113 ft Relief: 25 ft [1] Tides & Fishing Times |
113 ft | 30° 9' 28" N | 86° 24' 25" W |
| Aquatic Life Ecosystem (Ale) Center |
4 Walter Tetrahedrons,9,10,11 & 12 of 40 Drops This Grant And Date, Lat/Lon For Unit #11 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 48" N | 86° 18' 40" W |
| Aquatic Life Ecosystem (Ale) Center #2 |
4 Walter Tetrahedrons,37, 38, 39 & 40 of 40 Drops This Grant And Date, Lat/Lon For Unit #38 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 47" N | 86° 18' 37" W |
| Aquatic Life Ecosystem (Ale) NE Leg #2 |
2 Walter Tetrahedrons, 33 & 34 of 40 Drops This Grant And Date, Lat/Lon For Unit #33 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 55" N | 86° 18' 24" W |
| Aquatic Life Ecosystem (Ale) NE Leg #3 |
2 Walter Tetrahedrons, 31 & 32 of 40 Drops This Grant And Date, Lat/Lon For Unit #31 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 53" N | 86° 18' 29" W |
| Aquatic Life Ecosystem (Ale) NE Leg #4 |
2 Walter Tetrahedrons, 29 & 30 of 40 Drops This Grant And Date, Lat/Lon For Unit #29 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 51" N | 86° 18' 35" W |
| Aquatic Life Ecosystem (Ale) NE Leg End |
2 Walter Tetrahedrons, 35 & 36 of 40 Drops This Grant And Date, Lat/Lon For Unit #35 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 58" N | 86° 18' 19" W |
| Aquatic Life Ecosystem (Ale) NW Leg #2 |
2 Walter Tetrahedrons, 3 & 4 of 40 Drops This Grant And Date, Lat/Lon For Unit #3 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 57" N | 86° 18' 54" W |
| Aquatic Life Ecosystem (Ale) NW Leg #3 |
2 Walter Tetrahedrons, 5 & 6 of 40 Drops This Grant And Date, Lat/Lon For Unit #5 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 53" N | 86° 18' 49" W |
| Aquatic Life Ecosystem (Ale) NW Leg #4 |
2 Walter Tetrahedrons, 7 & 8 of 40 Drops This Grant And Date, Lat/Lon For Unit #7 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 51" N | 86° 18' 44" W |
| Aquatic Life Ecosystem (Ale) Nw Leg End |
2 Walter Tetrahedrons, 1 & 2 of 40 Drops This Grant And Date, Lat/Lon For Unit #1 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 59" N | 86° 18' 58" W |
| Aquatic Life Ecosystem (Ale) SE Leg #2 |
2 Walter Tetrahedrons, 17 & 18 of 40 Drops This Grant And Date, Lat/Lon For Unit #17 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 38" N | 86° 18' 24" W |
| Aquatic Life Ecosystem (Ale) SE Leg #3 |
2 Walter Tetrahedrons, 15 & 16 of 40 Drops This Grant And Date, Lat/Lon For Unit #15 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 42" N | 86° 18' 28" W |
| Aquatic Life Ecosystem (Ale) SE Leg #4 |
2 Walter Tetrahedrons, 13 & 14 of 40 Drops This Grant And Date, Lat/Lon For Unit #13 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 45" N | 86° 18' 33" W |
| Aquatic Life Ecosystem (Ale) SE Leg End |
4 Walter Tetrahedrons,19,20,21 & 22 of 40 Drops This Grant And Date, Lat/Lon For Unit #21 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 35" N | 86° 18' 56" W |
| Aquatic Life Ecosystem (Ale) SW Leg #2 |
2 Walter Tetrahedrons, 23 & 24 of 40 Drops This Grant And Date, Lat/Lon For Unit #23 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 39" N | 86° 18' 51" W |
| Aquatic Life Ecosystem (Ale) SW Leg #3 |
2 Walter Tetrahedrons, 25 & 26 of 40 Drops This Grant And Date, Lat/Lon For Unit #25 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 42" N | 86° 18' 47" W |
| Aquatic Life Ecosystem (Ale) SW Leg #4 |
2 Walter Tetrahedrons, 27 & 28 of 40 Drops This Grant And Date, Lat/Lon For Unit #27 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [1] Tides & Fishing Times |
121 ft | 30° 6' 45" N | 86° 18' 43" W |
| Barnacle Reef - #1 |
2 Walter Tetrahedrons, 1 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 107 ft Relief: 10 ft [1] Tides & Fishing Times |
107 ft | 30° 9' 25" N | 86° 19' 12" W |
| Barnacle Reef - #10 |
2 Walter Tetrahedrons, 10 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 111 ft Relief: 10 ft [1] Tides & Fishing Times |
111 ft | 30° 8' 32" N | 86° 19' 13" W |
| Barnacle Reef - #11 |
2 Walter Tetrahedrons, 11 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 114 ft Relief: 10 ft [1] Tides & Fishing Times |
114 ft | 30° 8' 42" N | 86° 18' 55" W |
| Barnacle Reef - #12 |
2 Walter Tetrahedrons, 12 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 118 ft Relief: 10 ft [1] Tides & Fishing Times |
118 ft | 30° 8' 31" N | 86° 18' 56" W |
| Barnacle Reef - #13 |
2 Walter Tetrahedrons, 13 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 118 ft Relief: 10 ft [1] Tides & Fishing Times |
118 ft | 30° 8' 50" N | 86° 18' 39" W |
| Barnacle Reef - #14 |
2 Walter Tetrahedrons, 14 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 115 ft Relief: 10 ft [1] Tides & Fishing Times |
115 ft | 30° 9' 6" N | 86° 18' 39" W |
| Barnacle Reef - #15 |
2 Walter Tetrahedrons, 15 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 116 ft Relief: 10 ft [1] Tides & Fishing Times |
116 ft | 30° 8' 57" N | 86° 18' 19" W |
| Barnacle Reef - #2 |
2 Walter Tetrahedrons, 2 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 108 ft Relief: 10 ft [1] Tides & Fishing Times |
108 ft | 30° 9' 17" N | 86° 19' 8" W |
| Barnacle Reef - #3 |
2 Walter Tetrahedrons, 3 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 108 ft Relief: 10 ft [1] Tides & Fishing Times |
108 ft | 30° 9' 23" N | 86° 18' 55" W |
| Barnacle Reef - #4 |
2 Walter Tetrahedrons, 4 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 111 ft Relief: 10 ft [1] Tides & Fishing Times |
111 ft | 30° 9' 24" N | 86° 18' 36" W |
| Barnacle Reef - #5 |
2 Walter Tetrahedrons, 5 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 113 ft Relief: 10 ft [1] Tides & Fishing Times |
113 ft | 30° 9' 17" N | 86° 18' 41" W |
| Barnacle Reef - #6 |
2 Walter Tetrahedrons, 6 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 109 ft Relief: 10 ft [1] Tides & Fishing Times |
109 ft | 30° 9' 14" N | 86° 18' 54" W |
| Barnacle Reef - #7 |
2 Walter Tetrahedrons, 7 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 106 ft Relief: 10 ft [1] Tides & Fishing Times |
106 ft | 30° 9' 6" N | 86° 19' 12" W |
| Barnacle Reef - #8 |
2 Walter Tetrahedrons, 8 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 109 ft Relief: 10 ft [1] Tides & Fishing Times |
109 ft | 30° 8' 58" N | 86° 19' 29" W |
| Barnacle Reef - #9 |
2 Walter Tetrahedrons, 9 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 114 ft Relief: 10 ft [1] Tides & Fishing Times |
114 ft | 30° 8' 50" N | 86° 19' 11" W |
| Barrel Barge |
Steel Barge With 22 Steel Storage Tanks, FBIP-C-7519, 1 of 2 Loads Primary Material: Vessel Deploy Date: 1992/06/29 Depth: 72 ft Relief: 6 ft [1] Tides & Fishing Times |
72 ft | 30° 21' 49" N | 86° 36' 5" W |
| Baskins Barge |
80x40 Tower Construction Barge Primary Material: Vessel Deploy Date: 1996/10/29 Depth: 140 ft Relief: 30 ft [1] Tides & Fishing Times |
140 ft | 30° 5' 11" N | 86° 21' 20" W |
| Bay Cones (Bay) |
12 Prefab Plastic Resin Cones Located In Choctawhatchee Bay. Primary Material: Module Deploy Date: 1987/12/01 Depth: 25 ft Relief: 11 ft [1] Tides & Fishing Times |
25 ft | 30° 24' 42" N | 86° 30' 41" W |
| Beach Access 4 Snorkel Reef (BA4-19) |
Reefmaker Ecosystem Reef on Piling (28 units) Primary Material: Module Deploy Date: 4355/7/57 Depth: 15 ft Relief: 6 ft [1] Tides & Fishing Times |
15 ft | 30° 23' 39" N | 86° 37' 1" W |
| Beasley Park Snorkel Reef (BS-38) |
Reefmaker Ecosystem Reef on Piling (69 units) Primary Material: Module Deploy Date: 4356/6/66 Depth: 20 ft Relief: 6 ft [1] Tides & Fishing Times |
20 ft | 30° 23' 25" N | 86° 35' 6" W |
| Bob Reay Reef-Belize Queen |
85’ Steel Tugboat, Formally Called the "Belize Queen" Primary Material: Vessel Deploy Date: 2001/05/30 Depth: 112 ft Relief: 35 ft [1] Tides & Fishing Times |
112 ft | 30° 8' 48" N | 86° 40' 24" W |
| Brown Barge |
200’ Barge, the "Brown Barge" AKA "Ft. Walton Barge". Broken into 3 pieces. Primary Material: Vessel Deploy Date: 1977/00/00 Depth: 78 ft Relief: 12 ft [1] Tides & Fishing Times |
78 ft | 30° 21' 32" N | 86° 35' 37" W |
| Burgess Barge |
Steel Barge, the "Burgess Barge" Or "18’s Teens Reef", Old Site #8 Primary Material: Vessel Deploy Date: 1979/06/06 Depth: 125 ft Relief: 6 ft [1] Tides & Fishing Times |
125 ft | 30° 9' 15" N | 86° 44' 40" W |
| Chepanoc - Starfish Reef |
129 X 24 X28’ Tugboat, the "Chepanoc" Funded by County TDC Primary Material: Vessel Deploy Date: 2005/12/01 Depth: 107 ft Relief: 28 ft [1] Tides & Fishing Times |
107 ft | 30° 8' 49" N | 86° 37' 38" W |
| Conch Reef NE - #1 |
2 Walter Tetrahedrons, 17 & 18 of 32 Drops This Grant And Date, Lat/Lon For Unit #18 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 24" N | 86° 22' 8" W |
| Conch Reef NE - #2 |
2 Walter Tetrahedrons, 19 & 20 of 32 Drops This Grant And Date, Lat/Lon For Unit #19 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 27" N | 86° 22' 5" W |
| Conch Reef NE - #3 |
2 Walter Tetrahedrons, 21 & 22 of 32 Drops This Grant And Date, Lat/Lon For Unit #21 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 30" N | 86° 22' 2" W |
| Conch Reef NE - #4 |
2 Walter Tetrahedrons, 23 & 24 of 32 Drops This Grant And Date, Lat/Lon For Unit #23 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 33" N | 86° 21' 58" W |
| Conch Reef NW - #1 |
2 Walter Tetrahedrons, 15 & 16 of 32 Drops This Grant And Date, Lat/Lon For Unit #16 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 24" N | 86° 22' 14" W |
| Conch Reef NW - #2 |
2 Walter Tetrahedrons, 13 & 14 of 32 Drops This Grant And Date, Lat/Lon For Unit #14 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 27" N | 86° 22' 17" W |
| Conch Reef NW - #3 |
2 Walter Tetrahedrons, 11 & 12 of 32 Drops This Grant And Date, Lat/Lon For Unit #12 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 30" N | 86° 22' 21" W |
| Conch Reef NW - #4 |
2 Walter Tetrahedrons, 9 & 10 of 32 Drops This Grant And Date, Lat/Lon For Unit #9 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 33" N | 86° 22' 24" W |
| Conch Reef SE - #1 |
2 Walter Tetrahedrons, 25 & 26 of 32 Drops This Grant And Date, Lat/Lon For Unit #25 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 19" N | 86° 22' 7" W |
| Conch Reef SE - #2 |
2 Walter Tetrahedrons, 27 & 28 of 32 Drops This Grant And Date, Lat/Lon For Unit #27 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 16" N | 86° 22' 4" W |
| Conch Reef SE - #3 |
2 Walter Tetrahedrons, 29 & 30 of 32 Drops This Grant And Date, Lat/Lon For Unit #29 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 13" N | 86° 22' 1" W |
| Conch Reef SE - #4 |
2 Walter Tetrahedrons, 31 & 32 of 32 Drops This Grant And Date, Lat/Lon For Unit #31 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 10" N | 86° 21' 58" W |
| Conch Reef SW - #1 |
2 Walter Tetrahedrons, 1 & 2 of 32 Drops This Grant And Date, Lat/Lon For Unit #2 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 19" N | 86° 22' 14" W |
| Conch Reef SW - #2 |
2 Walter Tetrahedrons, 3 & 4 of 32 Drops This Grant And Date, Lat/Lon For Unit #3 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 16" N | 86° 22' 17" W |
| Conch Reef SW - #3 |
2 Walter Tetrahedrons, 7 & 8 of 32 Drops This Grant And Date, Lat/Lon For Unit #7 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 13" N | 86° 22' 19" W |
| Conch Reef SW - #4 |
2 Walter Tetrahedrons, 5 & 6 of 32 Drops This Grant And Date, Lat/Lon For Unit #5 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 10" N | 86° 22' 24" W |
| County Site #1 -Reef-Ex #1 |
Reef-Ex Tank #1 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 70 ft Relief: 12 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 47" N | 86° 35' 22" W |
| County Site #1 -Reef-Ex #2 |
Reef-Ex Tank #2 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 70 ft Relief: 12 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 47" N | 86° 35' 22" W |
| County Site #1 -Reef-Ex #3 |
Reef-Ex Tank #3 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 70 ft Relief: 12 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 46" N | 86° 35' 22" W |
| County Site #1 -Reef-Ex #4 |
Reef-Ex Tank #4 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 70 ft Relief: 12 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 47" N | 86° 35' 21" W |
| County Site #1 -Reef-Ex #6 |
Reef-Ex Tank #6 -Shallow Primary Material: Tank Deploy Date: 1994/12/19 Depth: 60 ft Relief: 12 ft [1] Tides & Fishing Times |
60 ft | 30° 22' 9" N | 86° 35' 3" W |
| County Site #1 -Reef-Ex M60 Tank #5 |
Reef-Ex Tank #5 -Shallow Primary Material: Tank Deploy Date: 1994/12/19 Depth: 60 ft Relief: 12 ft [1] Tides & Fishing Times |
60 ft | 30° 22' 8" N | 86° 35' 4" W |
| County Site #1(Pole Spot) |
Pier Rubble Called Pole Spot Primary Material: Rubble Deploy Date: 1976/00/00 Depth: 75 ft [1] Tides & Fishing Times |
75 ft | 30° 22' 1" N | 86° 35' 23" W |
| County Site #1(Pole Spot) |
Pier Rubble Called The Pole Spot Primary Material: Rubble Deploy Date: 1976/00/00 Depth: 75 ft [1] Tides & Fishing Times |
75 ft | 30° 22' 4" N | 86° 35' 23" W |
| County Site #1(Pole Spot) |
Pier Rubble Called The Pole Spot Primary Material: Rubble Deploy Date: 1976/00/00 Depth: 75 ft [1] Tides & Fishing Times |
75 ft | 30° 22' 9" N | 86° 35' 19" W |
| County Site #2 |
Several Piles of Concrete Rubble From Old Destin Bridge "Main Stack" Primary Material: Rubble Deploy Date: 1977/00/00 Depth: 65 ft Relief: 11 ft [1] Tides & Fishing Times |
65 ft | 30° 20' 49" N | 86° 29' 38" W |
| County Site #2 -Reef-Ex #7 |
Reef-Ex Tank #7 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 65 ft Relief: 12 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 31" N | 86° 29' 41" W |
| County Site #3 |
Concrete, Tires , Appliances, Pvc Pipe Trees Primary Material: Rubble Deploy Date: 1977/00/00 Depth: 65 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 34" N | 86° 25' 9" W |
| County Site #3 -Reef-Ex #8 |
Reef-Ex Tank #8 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 69 ft Relief: 12 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 20" N | 86° 25' 26" W |
| County Site #3 -Reef-Ex #9 |
Reef-Ex Tank #9 -Destin Primary Material: Tank Deploy Date: 1994/12/19 Depth: 69 ft Relief: 12 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 20" N | 86° 25' 21" W |
| Crab Trap Snorkel Reef (C-42) |
Reefmaker Ecosystem Reef on Piling (68 units) Primary Material: Module Deploy Date: 4357/2/72 Depth: 20 ft Relief: 6 ft [1] Tides & Fishing Times |
20 ft | 30° 22' 37" N | 86° 24' 29" W |
| CSX Reef #1 |
Almost completely gone. Surplus Boxcars (used to be 4) Primary Material: RR Boxcars Deploy Date: 1988/06/28 Depth: 99 ft Relief: 1 ft [1] Tides & Fishing Times |
99 ft | 30° 10' 10" N | 86° 44' 56" W |
| CSX Reef #2 |
4 Surplus Boxcars Primary Material: RR Boxcars Deploy Date: 1988/06/03 Depth: 80 ft [1] Tides & Fishing Times |
80 ft | 30° 21' 39" N | 86° 35' 43" W |
| CSX Reef #3 |
4 Surplus Boxcars Primary Material: RR Boxcars Deploy Date: 1988/06/09 Depth: 69 ft Relief: 12 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 25' 3" W |
| CSX Reef #4 |
4 Surplus Boxcars Primary Material: RR Boxcars Deploy Date: 1988/06/17 Depth: 100 ft [1] Tides & Fishing Times |
100 ft | 30° 21' 16" N | 86° 30' 3" W |
| DEP FLAP No Name Reef - #1 |
Twelve (12) Concrete Culverts, Paired 50ft apart Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 137 ft Relief: 3 ft [1] Tides & Fishing Times |
137 ft | 30° 5' 8" N | 86° 22' 5" W |
| DEP FLAP No Name Reef - #2 |
6 4th Load of 6, Also (#4)370.0/015.0, (#5)780.1/010.1 Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft Relief: 6 ft [1] Tides & Fishing Times |
140 ft | 30° 3' 13" N | 86° 19' 26" W |
| DEP FLAP No Name Reef - #3 |
Concrete Culverts 4th of 6 Loads This Date Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft [1] Tides & Fishing Times |
140 ft | 30° 3' 54" N | 86° 19' 35" W |
| DEP FLAP No Name Reef - #4 |
Concrete Culverts 5th of 6 Loads This Date Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft [1] Tides & Fishing Times |
140 ft | 30° 3' 25" N | 86° 18' 14" W |
| DEP FLAP No Name Reef - #5 |
Concrete Culverts 3rd of 6 Loads On This Date Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft [1] Tides & Fishing Times |
140 ft | 30° 4' 31" N | 86° 20' 48" W |
| DEP LAP Valp - #1 |
1 1st of 3 Loads, 39 Pallet Balls Primary Material: Module Deploy Date: 1995/03/24 Depth: 105 ft Relief: 5 ft [1] Tides & Fishing Times |
105 ft | 30° 8' 52" N | 86° 24' 47" W |
| DEP LAP Valp - #2 |
2nd of 3 Loads, 42 Pallet Balls Primary Material: Module Deploy Date: 1995/05/22 Depth: 105 ft Relief: 5 ft [1] Tides & Fishing Times |
105 ft | 30° 8' 53" N | 86° 24' 49" W |
| DEP LAP Valp - #3 |
3rd of 3 Loads of Pallet Reef Balls Primary Material: Module Deploy Date: 1995/06/20 Depth: 105 ft Relief: 4 ft [1] Tides & Fishing Times |
105 ft | 30° 9' 52" N | 86° 24' 47" W |
| DEP LAP Valp - #4 |
Mixer Drums and Concrete Culverts Primary Material: Rubble Deploy Date: 1996/03/22 Depth: 105 ft Relief: 9 ft [1] Tides & Fishing Times |
105 ft | 30° 9' 49" N | 86° 24' 46" W |
| Destin Deepwater Concrete #2 |
116 Pieces, 6.8’X 8’ And 2.3’X 8’ Primary Material: Culverts Deploy Date: 2001/04/20 Depth: 110 ft Relief: 6 ft [1] Tides & Fishing Times |
110 ft | 30° 8' 48" N | 86° 40' 40" W |
| Destin Reef "02" |
57 Modules, Various Sizes Primary Material: Module Deploy Date: 2002/06/07 Depth: 106 ft Relief: 6 ft [1] Tides & Fishing Times |
106 ft | 30° 8' 60" N | 86° 33' 20" W |
| Eglin AFB Material FH14 2015 |
500+ Tons of Concrete Targets From Eglin AFB Primary Material: Rubble Deploy Date: 2015/11/04 Depth: 72 ft Relief: 15 ft [1] Tides & Fishing Times |
72 ft | 30° 21' 8" N | 86° 36' 53" W |
| Eglin AFB Material FH15 2017 |
22 Concrete Slabs, 2 Concrete Bridge Beams, 119 Concrete Culverts, Manholes and Slabs Primary Material: Rubble Deploy Date: 2017/09/03 Depth: 71 ft Relief: 11 ft [1] Tides & Fishing Times |
71 ft | 30° 21' 53" N | 86° 42' 22" W |
| Eglin AFB Material FH16 2017 |
93 Concrete Slabs/Manholes and 15 Concrete Jersey Barriers Primary Material: Rubble Deploy Date: 2017/09/03 Depth: 66 ft Relief: 10 ft [1] Tides & Fishing Times |
66 ft | 30° 20' 53" N | 86° 46' 52" W |
| Eglin Landing Craft #1 |
74’ X 21’ Navy Landing Craft (LCM-8) From Eglin Air Force Base Primary Material: Vessel Deploy Date: 2000/11/29 Depth: 94 ft Relief: 22 ft [1] Tides & Fishing Times |
94 ft | 30° 15' 55" N | 86° 23' 10" W |
| Eglin Landing Craft #2 |
74’ X 21’ Navy Landing Craft (LCM-1) From Eglin Air Force Base Primary Material: Vessel Deploy Date: 1991/09/00 Depth: 103 ft Relief: 20 ft [1] Tides & Fishing Times |
103 ft | 30° 9' 42" N | 86° 19' 38" W |
| FH-14-09 (14-T-111) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 51" W |
| FH-14-09 (14-T-113) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 51" W |
| FH-14-09 (14-T-115) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 50" W |
| FH-14-09 (14-T-117) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 49" W |
| FH-14-09 (14-T-119) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 48" W |
| FH-14-09 (14-T-121) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 48" W |
| FH-14-09 (14-T-123) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 52" W |
| FH-14-09 (14-T-134) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 51" W |
| FH-14-09 (14-T-136) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 50" W |
| FH-14-09 (14-T-138) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 50" W |
| FH-14-09 (14-T-140) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 49" W |
| FH-14-09 (14-T-142) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 48" W |
| FH13-01 (13-T-06) |
5 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/05/29 Depth: 68 ft Relief: 8 ft [1] Tides & Fishing Times |
68 ft | 30° 21' 29" N | 86° 32' 58" W |
| FH13-02 (13-T-08) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 29" N | 86° 32' 54" W |
| FH13-03 (13-T-09) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 29" N | 86° 32' 51" W |
| FH13-04 (13-T-11) |
5 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/05/29 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 29" N | 86° 32' 47" W |
| FH13-05 (13-T-20) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 68 ft Relief: 8 ft [1] Tides & Fishing Times |
68 ft | 30° 21' 25" N | 86° 32' 47" W |
| FH13-06 (13-T-26) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 71 ft Relief: 8 ft [1] Tides & Fishing Times |
71 ft | 30° 21' 22" N | 86° 32' 47" W |
| FH13-07 (13-T-39) |
5 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/05/29 Depth: 76 ft Relief: 8 ft [1] Tides & Fishing Times |
76 ft | 30° 21' 18" N | 86° 32' 47" W |
| FH13-08 (13-T-37) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 73 ft Relief: 8 ft [1] Tides & Fishing Times |
73 ft | 30° 21' 18" N | 86° 32' 51" W |
| FH13-09 (13-T-36) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 72 ft Relief: 8 ft [1] Tides & Fishing Times |
72 ft | 30° 21' 18" N | 86° 32' 54" W |
| FH13-10 (13-T-34) |
5 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/05/29 Depth: 70 ft Relief: 8 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 18" N | 86° 32' 58" W |
| FH13-11 (13-T-25) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 70 ft Relief: 8 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 22" N | 86° 32' 58" W |
| FH13-12 (13-T-19) |
3 Walter Tetrahedrons (FLARs) and 2 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/05/29 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 25" N | 86° 32' 58" W |
| FH14-01 (14-LD-06) |
20 Walter Tetrahedrons (FLARs) and 5 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/12 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 14" N | 86° 36' 58" W |
| FH14-02 (14-LT-01) |
16 Walter Tetrahedrons (FLARs), 4 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/05/29 Depth: 70 ft Relief: 15 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 14" N | 86° 36' 52" W |
| FH14-03 (14-LD-09) |
21 Walter Tetrahedrons (FLARs) and 5 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/12 Depth: 70 ft Relief: 8 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 14" N | 86° 36' 47" W |
| FH14-04 (14-LT-02) |
12 Walter Tetrahedrons (FLARs), 4 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/06/12 Depth: 69 ft Relief: 15 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 58" W |
| FH14-06 (14-LT-03) |
12 Walter Tetrahedrons (FLARs), 4 Ledge and Disk Modules and 2 Large Walter Tetrahedrons Primary Material: Module Deploy Date: 2019/06/12 Depth: 71 ft Relief: 15 ft [1] Tides & Fishing Times |
71 ft | 30° 21' 8" N | 86° 36' 47" W |
| FH14-07 (14-T-101) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 52" W |
| FH14-07 (14-T-82) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 13" N | 86° 36' 52" W |
| FH14-07 (14-T-83) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 12" N | 86° 36' 53" W |
| FH14-07 (14-T-86) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 12" N | 86° 36' 52" W |
| FH14-07 (14-T-87) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 12" N | 86° 36' 53" W |
| FH14-07 (14-T-90) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 11" N | 86° 36' 52" W |
| FH14-07 (14-T-91) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 11" N | 86° 36' 53" W |
| FH14-07 (14-T-94) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 11" N | 86° 36' 52" W |
| FH14-07 (14-T-95) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 10" N | 86° 36' 53" W |
| FH14-07 (14-T-98) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 10" N | 86° 36' 52" W |
| FH14-07 (14-T-99) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 10" N | 86° 36' 53" W |
| FH14-08 (14-T-102) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 57" W |
| FH14-08 (14-T-104) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 56" W |
| FH14-08 (14-T-106) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 56" W |
| FH14-08 (14-T-108) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 55" W |
| FH14-08 (14-T-110) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 9" N | 86° 36' 54" W |
| FH14-08 (14-T-122) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 54" W |
| FH14-08 (14-T-125) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 57" W |
| FH14-08 (14-T-127) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 56" W |
| FH14-08 (14-T-129) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 55" W |
| FH14-08 (14-T-131) Center |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2020/04/18 Depth: 69 ft Relief: 8 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 8" N | 86° 36' 55" W |
| FH15-01 (15-LT-01) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 75 ft Relief: 15 ft [1] Tides & Fishing Times |
75 ft | 30° 21' 59" N | 86° 42' 29" W |
| FH15-01 (15-LT-02) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 75 ft Relief: 15 ft [1] Tides & Fishing Times |
75 ft | 30° 21' 59" N | 86° 42' 28" W |
| FH15-01 (15-LT-03) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 75 ft Relief: 15 ft [1] Tides & Fishing Times |
75 ft | 30° 21' 59" N | 86° 42' 28" W |
| FH15-01 (15-LT-04) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 75 ft Relief: 15 ft [1] Tides & Fishing Times |
75 ft | 30° 21' 59" N | 86° 42' 27" W |
| FH15-01 (15-LT-05) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 70 ft Relief: 15 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 59" N | 86° 42' 23" W |
| FH15-01 (15-LT-06) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 70 ft Relief: 15 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 59" N | 86° 42' 23" W |
| FH15-01 (15-LT-07) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 70 ft Relief: 15 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 59" N | 86° 42' 22" W |
| FH15-01 (15-LT-08) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 70 ft Relief: 15 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 59" N | 86° 42' 22" W |
| FH15-01 (15-LT-09) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 69 ft Relief: 15 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 59" N | 86° 42' 18" W |
| FH15-01 (15-LT-10) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 69 ft Relief: 15 ft [1] Tides & Fishing Times |
69 ft | 30° 21' 59" N | 86° 42' 17" W |
| FH15-01 (15-LT-11) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 68 ft Relief: 15 ft [1] Tides & Fishing Times |
68 ft | 30° 21' 59" N | 86° 42' 16" W |
| FH15-01 (15-LT-12) |
1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/17 Depth: 68 ft Relief: 15 ft [1] Tides & Fishing Times |
68 ft | 30° 21' 59" N | 86° 42' 16" W |
| FH15-04 (15-LD-03) |
20 Walter Tetrahedrons (FLARs) and 5 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/18 Depth: 71 ft Relief: 8 ft [1] Tides & Fishing Times |
71 ft | 30° 21' 48" N | 86° 42' 22" W |
| FH15-05 (15-LT-03) |
5 Large Walter Tetrahedrons Primary Material: Module Deploy Date: 2019/06/18 Depth: 70 ft Relief: 15 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 48" N | 86° 42' 16" W |
| FH16-02 (16-LT-01) |
4 Walter Tetrahedrons (FLARs), 2 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/03 Depth: 68 ft Relief: 15 ft [1] Tides & Fishing Times |
68 ft | 30° 20' 59" N | 86° 46' 52" W |
| FH16-04 (16-LT-02) |
14 Walter Tetrahedrons (FLARs), 2 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/03 Depth: 67 ft Relief: 15 ft [1] Tides & Fishing Times |
67 ft | 30° 20' 53" N | 86° 46' 58" W |
| FH16-06 (16-LT-03) |
4 Walter Tetrahedrons (FLARs), 12 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/03 Depth: 68 ft Relief: 15 ft [1] Tides & Fishing Times |
68 ft | 30° 20' 53" N | 86° 46' 47" W |
| FH16-08 (16-LT-04) |
6 Ledge and Disk Modules and 1 Large Walter Tetrahedrons Primary Material: Module Deploy Date: 2019/07/03 Depth: 67 ft Relief: 15 ft [1] Tides & Fishing Times |
67 ft | 30° 20' 48" N | 86° 46' 52" W |
| FH17-01 (17-T-04) |
7 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/07/03 Depth: 72 ft Relief: 8 ft [1] Tides & Fishing Times |
72 ft | 30° 19' 59" N | 86° 46' 58" W |
| FH17-03 (17-LD-04) |
7 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/24 Depth: 71 ft Relief: 6 ft [1] Tides & Fishing Times |
71 ft | 30° 19' 59" N | 86° 46' 47" W |
| FH17-05 (17-LT-01) |
20 Walter Tetrahedrons (FLARs), 8 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/07/03 Depth: 73 ft Relief: 15 ft [1] Tides & Fishing Times |
73 ft | 30° 19' 54" N | 86° 46' 52" W |
| FH17-07 (17-LD-19) |
7 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/24 Depth: 71 ft Relief: 6 ft [1] Tides & Fishing Times |
71 ft | 30° 19' 48" N | 86° 46' 58" W |
| FH17-09 (17-T-31) |
7 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/07/03 Depth: 75 ft Relief: 8 ft [1] Tides & Fishing Times |
75 ft | 30° 19' 49" N | 86° 46' 46" W |
| FH18-01 (18-T-01) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 59" N | 86° 43' 59" W |
| FH18-01 (18-T-02) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 59" N | 86° 43' 58" W |
| FH18-01 (18-T-03) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 59" N | 86° 43' 57" W |
| FH18-01 (18-T-04) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 56" W |
| FH18-01 (18-T-05) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 55" W |
| FH18-01 (18-T-06) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 54" W |
| FH18-01 (18-T-07) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 52" W |
| FH18-01 (18-T-08) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 51" W |
| FH18-01 (18-T-09) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 50" W |
| FH18-01 (18-T-11) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 59" N | 86° 43' 49" W |
| FH18-01 (18-T-12) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 59" N | 86° 43' 48" W |
| FH18-01 (18-T-13) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 47" W |
| FH18-01 (18-T-15) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 59" N | 86° 43' 46" W |
| FH18-01 (18-T-17) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 59" W |
| FH18-01 (18-T-18) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 58" W |
| FH18-01 (18-T-19) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 57" W |
| FH18-01 (18-T-20) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 56" W |
| FH18-01 (18-T-21) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 58" N | 86° 43' 55" W |
| FH18-01 (18-T-22) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 58" N | 86° 43' 54" W |
| FH18-01 (18-T-23) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 58" N | 86° 43' 52" W |
| FH18-01 (18-T-24) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 58" N | 86° 43' 51" W |
| FH18-01 (18-T-25) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 58" N | 86° 43' 50" W |
| FH18-01 (18-T-27) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 49" W |
| FH18-01 (18-T-28) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 48" W |
| FH18-01 (18-T-29) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 47" W |
| FH18-01 (18-T-31) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 58" N | 86° 43' 46" W |
| FH18-01 (18-T-33) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 59" W |
| FH18-01 (18-T-34) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 57" N | 86° 43' 58" W |
| FH18-01 (18-T-35) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 57" N | 86° 43' 57" W |
| FH18-01 (18-T-36) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 57" N | 86° 43' 56" W |
| FH18-01 (18-T-37) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 57" N | 86° 43' 55" W |
| FH18-01 (18-T-38) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 57" N | 86° 43' 54" W |
| FH18-01 (18-T-39) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 52" W |
| FH18-01 (18-T-40) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 51" W |
| FH18-01 (18-T-41) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 50" W |
| FH18-01 (18-T-43) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 49" W |
| FH18-01 (18-T-44) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 48" W |
| FH18-01 (18-T-45) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 57" N | 86° 43' 47" W |
| FH18-01 (18-T-47) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 57" N | 86° 43' 46" W |
| FH18-01 (18-T-49) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 56" N | 86° 43' 59" W |
| FH18-01 (18-T-50) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 56" N | 86° 43' 58" W |
| FH18-01 (18-T-51) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 57" W |
| FH18-01 (18-T-52) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 56" N | 86° 43' 56" W |
| FH18-01 (18-T-53) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 55" W |
| FH18-01 (18-T-54) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 56" N | 86° 43' 54" W |
| FH18-01 (18-T-55) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 56" N | 86° 43' 52" W |
| FH18-01 (18-T-56) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 51" W |
| FH18-01 (18-T-57) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 50" W |
| FH18-01 (18-T-59) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 49" W |
| FH18-01 (18-T-60) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 48" W |
| FH18-01 (18-T-61) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 47" W |
| FH18-01 (18-T-63) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 56" N | 86° 43' 46" W |
| FH18-01 (18-T-65) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/17 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 55" N | 86° 43' 59" W |
| FH18-01 (18-T-66) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 55" N | 86° 43' 58" W |
| FH18-01 (18-T-67) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 57" W |
| FH18-01 (18-T-68) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 56" W |
| FH18-01 (18-T-69) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 55" W |
| FH18-01 (18-T-70) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 54" W |
| FH18-01 (18-T-71) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 53" W |
| FH18-01 (18-T-72) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 51" W |
| FH18-01 (18-T-73) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/07/09 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 50" W |
| FH18-01 (18-T-75) |
2 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 49" W |
| FH18-01 (18-T-76) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 48" W |
| FH18-01 (18-T-77) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 66 ft Relief: 8 ft [1] Tides & Fishing Times |
66 ft | 30° 21' 55" N | 86° 43' 47" W |
| FH18-01 (18-T-79) |
1 Walter Tetrahedron (FLAR) Primary Material: Module Deploy Date: 2019/06/18 Depth: 67 ft Relief: 8 ft [1] Tides & Fishing Times |
67 ft | 30° 21' 55" N | 86° 43' 46" W |
| FH19-01 (19-T-04) |
7 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/06/05 Depth: 62 ft Relief: 8 ft [1] Tides & Fishing Times |
62 ft | 30° 22' 29" N | 86° 35' 58" W |
| FH19-03 (19-LD-04) |
7 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/05 Depth: 63 ft Relief: 6 ft [1] Tides & Fishing Times |
63 ft | 30° 22' 29" N | 86° 35' 47" W |
| FH19-05 (19-LT-01) |
16 Walter Tetrahedrons (FLARs), 12 Ledge and Disk Modules and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2019/05/29 Depth: 65 ft Relief: 15 ft [1] Tides & Fishing Times |
65 ft | 30° 22' 24" N | 86° 35' 52" W |
| FH19-07 (19-LD-23) |
7 Ledge and Disk Modules Primary Material: Module Deploy Date: 2019/06/05 Depth: 66 ft Relief: 6 ft [1] Tides & Fishing Times |
66 ft | 30° 22' 18" N | 86° 35' 58" W |
| FH19-09 (19-T-27) |
7 Walter Tetrahedrons (FLARs) Primary Material: Module Deploy Date: 2019/06/05 Depth: 68 ft Relief: 8 ft [1] Tides & Fishing Times |
68 ft | 30° 22' 19" N | 86° 35' 46" W |
| Fish Haven #3 |
44 Steel Storage Tanks Primary Material: Steel Storage Tanks Deploy Date: 1990/06/26 Depth: 68 ft Relief: 8 ft [1] Tides & Fishing Times |
68 ft | 30° 20' 57" N | 86° 24' 49" W |
| Frangista Beach Culverts |
52 Pieces of Concrete Culverts (6’x8’;4’x8) Primary Material: Culverts Deploy Date: 0//0 Depth: 77 ft Relief: 8 ft [1] Tides & Fishing Times |
77 ft | 30° 19' 45" N | 86° 22' 59" W |
| Frangista Beach Culverts |
52 Pieces of Concrete Culverts, 6X8 & 4X8 Ft. Primary Material: Culverts Deploy Date: 2001/06/18 Depth: 77 ft Relief: 6 ft [1] Tides & Fishing Times |
77 ft | 30° 19' 45" N | 86° 22' 55" W |
| Henderson Park East Snorkel Reef (HE-39) |
Reefmaker Ecosystem Reef on Piling (40 units) Primary Material: Module Deploy Date: 4356/7/67 Depth: 20 ft Relief: 6 ft [1] Tides & Fishing Times |
20 ft | 30° 22' 49" N | 86° 26' 6" W |
| LA-1L (S36) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 143 ft Relief: 15 ft [1] Tides & Fishing Times |
143 ft | 30° 5' 34" N | 86° 24' 10" W |
| LA-2L (S37) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 146 ft Relief: 15 ft [1] Tides & Fishing Times |
146 ft | 30° 5' 4" N | 86° 24' 45" W |
| LA-3L (S38) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 153 ft Relief: 15 ft [1] Tides & Fishing Times |
153 ft | 30° 5' 4" N | 86° 24' 10" W |
| LA-4L (S39) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 146 ft Relief: 15 ft [1] Tides & Fishing Times |
146 ft | 30° 5' 4" N | 86° 23' 36" W |
| LA-5L (S40) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 147 ft Relief: 15 ft [1] Tides & Fishing Times |
147 ft | 30° 4' 34" N | 86° 24' 10" W |
| LAARS Site A - M-60 Tank #10 (E5) |
M-60 Tank E5 - Tank laying on side Primary Material: Tank Deploy Date: 1994/12/19 Depth: 107 ft Relief: 12 ft [1] Tides & Fishing Times |
107 ft | 30° 9' 4" N | 86° 24' 8" W |
| LAARS Site A - M-60 Tank #11 (E1) |
M-60 Tank E1 - Tank laying on side Primary Material: Tank Deploy Date: 1994/12/19 Depth: 110 ft Relief: 12 ft [1] Tides & Fishing Times |
110 ft | 30° 9' 2" N | 86° 24' 3" W |
| LAARS Site A - M-60 Tank #12 |
LAARS Site A-Tank #12-Deep Primary Material: Tank Deploy Date: 1994/12/19 Depth: 113 ft Relief: 12 ft [1] Tides & Fishing Times |
113 ft | 30° 8' 42" N | 86° 23' 8" W |
| LAARS Site A - M-60 Tank #13 |
M-60 Tank - Tank Upright Primary Material: Tank Deploy Date: 1994/12/19 Depth: 121 ft Relief: 12 ft [1] Tides & Fishing Times |
121 ft | 30° 8' 26" N | 86° 22' 23" W |
| LAARS Site A - M-60 Tank #14 |
M-60 Tank - Tank Upside Down Primary Material: Tank Deploy Date: 1994/12/19 Depth: 105 ft Relief: 12 ft [1] Tides & Fishing Times |
105 ft | 30° 8' 32" N | 86° 21' 31" W |
| Liberty Ship - Thomas Hayward |
Liberty Ship, the "Thomas Hayward" Primary Material: Vessel Deploy Date: 1977/04/17 Depth: 87 ft Relief: 18 ft [1] Tides & Fishing Times |
87 ft | 30° 18' 23" N | 86° 36' 13" W |
| Lindberg Circle Reef - 1A |
1st of 10 Drops This Day, 5 Drops This Reef Destin -Lindberg 1A Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [1] Tides & Fishing Times |
107 ft | 30° 9' 54" N | 86° 17' 5" W |
| Lindberg Circle Reef - 1B |
2nd of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1B Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [1] Tides & Fishing Times |
107 ft | 30° 10' 5" N | 86° 16' 59" W |
| Lindberg Circle Reef - 1C |
3rd of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1C Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [1] Tides & Fishing Times |
107 ft | 30° 10' 4" N | 86° 16' 49" W |
| Lindberg Circle Reef - 1D |
4th of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1D Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [1] Tides & Fishing Times |
107 ft | 30° 9' 55" N | 86° 16' 40" W |
| Lindberg Circle Reef - 1E |
5th of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1E Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [1] Tides & Fishing Times |
107 ft | 30° 9' 58" N | 86° 16' 56" W |
| M/V Angelina B. |
M/V "Angelina B", In Okaloosa Large Area "C" Primary Material: Vessel Deploy Date: 1999/06/23 Depth: 135 ft Relief: 35 ft [1] Tides & Fishing Times |
135 ft | 30° 7' 23" N | 86° 36' 42" W |
| M/V Deborah |
135’ Tugboat The M/V Deborah, Okaloosa Flap "C" Site Primary Material: Vessel Deploy Date: 1999/06/23 Depth: 135 ft Relief: 40 ft [1] Tides & Fishing Times |
135 ft | 30° 7' 30" N | 86° 35' 24" W |
| M/V Janet- Fish Haven #6 |
85’ Tugboat, the "Janet" Primary Material: Vessel Deploy Date: 1997/10/01 Depth: 93 ft Relief: 30 ft [1] Tides & Fishing Times |
93 ft | 30° 15' 50" N | 86° 23' 6" W |
| M/V Prewitt |
80’ Long Tugboat The M/V Prewitt, DEP Flap Site Primary Material: Vessel Deploy Date: 1998/06/10 Depth: 137 ft Relief: 30 ft [1] Tides & Fishing Times |
137 ft | 30° 3' 42" N | 86° 18' 28" W |
| Mac's Reef |
900+ Tons of Concrete Targets From Eglin AFB and Culverts, 2 Barge Loads Primary Material: Rubble Deploy Date: 2015/11/07 Depth: 76 ft Relief: 15 ft [1] Tides & Fishing Times |
76 ft | 30° 21' 24" N | 86° 32' 53" W |
| Miss Louise |
95’ Steel Tug Boat, the "Miss Louise" Primary Material: Vessel Deploy Date: 1997/03/19 Depth: 58 ft Relief: 15 ft [1] Tides & Fishing Times |
58 ft | 30° 22' 17" N | 86° 25' 19" W |
| Monica Lee Tugboat |
Steel Hull 49’ Long Tugboat, the "Monica Lee" Primary Material: Vessel Deploy Date: 2011/05/10 Depth: 117 ft Relief: 20 ft [1] Tides & Fishing Times |
117 ft | 30° 9' 20" N | 86° 22' 13" W |
| Okaloosa County Lap Site B |
16 Fish Haven Modules Primary Material: Module Deploy Date: 2000/05/25 Depth: 244 ft Relief: 6 ft [1] Tides & Fishing Times |
244 ft | 29° 58' 23" N | 86° 31' 11" W |
| Okaloosa County Lap Site C |
Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #4 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [1] Tides & Fishing Times |
118 ft | 30° 8' 1" N | 86° 36' 16" W |
| Okaloosa County Lap Site C |
Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #5 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [1] Tides & Fishing Times |
118 ft | 30° 8' 2" N | 86° 36' 16" W |
| Okaloosa County Lap Site C |
Center of 15 Fish Havens (5-FHT, 5-FH, 5-FHJR), Complex #1 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 116 ft Relief: 6 ft [1] Tides & Fishing Times |
116 ft | 30° 8' 2" N | 86° 36' 18" W |
| Okaloosa County Lap Site C |
Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #2 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [1] Tides & Fishing Times |
118 ft | 30° 8' 3" N | 86° 36' 18" W |
| Okaloosa County Lap Site C |
Center of 11 Fish Havens (5-FHT, 6-Fh, 0-FHJR), Complex #3 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [1] Tides & Fishing Times |
118 ft | 30° 8' 3" N | 86° 36' 18" W |
| Okaloosa County Lap Site C |
3rd of 3 Deployments (C) This Grant, 2nd of 2 This Date Primary Material: Module Deploy Date: 2000/06/20 Depth: 134 ft Relief: 6 ft [1] Tides & Fishing Times |
134 ft | 30° 8' 18" N | 86° 48' 58" W |
| Okaloosa County Lap Site C |
1st of 3 Deployments (A) This Grant, One This Date Primary Material: Module Deploy Date: 2000/06/15 Depth: 134 ft Relief: 6 ft [1] Tides & Fishing Times |
134 ft | 30° 8' 22" N | 86° 49' 4" W |
| Okaloosa County Lap Site C |
2nd of 3 Deployments (B) This Grant, 1 1st of 2 This Date Primary Material: Module Deploy Date: 2000/06/20 Depth: 134 ft Relief: 6 ft [1] Tides & Fishing Times |
134 ft | 30° 8' 23" N | 86° 48' 58" W |
| Okaloosa County Lap Site C |
2nd of 2 Deployments This Grant, Two Dates & Locations Primary Material: Culverts Deploy Date: 2000/06/15 Depth: 134 ft Relief: 6 ft [1] Tides & Fishing Times |
134 ft | 30° 8' 31" N | 86° 49' 8" W |
| Okaloosa County Site #8 |
Three tanks remain. Originally 38 Steel Storage Tanks. Primary Material: Steel Storage Tanks Deploy Date: 1991/06/14 Depth: 115 ft Relief: 1 ft [1] Tides & Fishing Times |
115 ft | 30° 9' 26" N | 86° 45' 58" W |
| Okaloosa Reef Odyssey (Sea Barb) |
Steel-Hulled Paddlewheel Boat, the "Seabarb" Primary Material: Vessel Deploy Date: 2002/06/26 Depth: 110 ft Relief: 22 ft [1] Tides & Fishing Times |
110 ft | 30° 8' 56" N | 86° 40' 36" W |
| Ozark |
Navy Mine Layer, Target Ship, AKA "USS Ozark" (MCS-2) Primary Material: Vessel Deploy Date: 1982/00/00 Depth: 325 ft Relief: 125 ft [1] Tides & Fishing Times |
325 ft | 29° 55' 6" N | 86° 34' 56" W |
| Sand Dollar Complex #7-Mohawk Chief |
93’ Tugboat the "Mohawk Chief", Moved by Hurricane Ivan Primary Material: Vessel Deploy Date: 2003/06/23 Depth: 124 ft Relief: 26.8 ft [1] Tides & Fishing Times |
124 ft | 30° 8' 48" N | 86° 43' 5" W |
| Sand Dollar Reef - #1 |
31 Fish Havens, 2 of 2 Drops This Grant And Date Primary Material: Module Deploy Date: 2003/06/09 Depth: 120 ft Relief: 6 ft [1] Tides & Fishing Times |
120 ft | 30° 8' 45" N | 86° 42' 56" W |
| Sand Dollar Reef - #2 |
31 Fish Havens, 1 of 2 Drops This Grant And Date Primary Material: Module Deploy Date: 2003/06/09 Depth: 120 ft Relief: 6 ft [1] Tides & Fishing Times |
120 ft | 30° 8' 38" N | 86° 43' 1" W |
| Sand Dollar Reef - #3 |
34 Fish Havens, 1 of 2 Drops This Grant And Date Primary Material: Module Deploy Date: 2003/06/11 Depth: 120 ft Relief: 6 ft [1] Tides & Fishing Times |
120 ft | 30° 8' 49" N | 86° 43' 10" W |
| Sand Dollar Reef - #4 |
110 Concrete Culverts, 1 of 2 Drops This Date And Grant Primary Material: Module Deploy Date: 2003/06/17 Depth: 120 ft Relief: 10 ft [1] Tides & Fishing Times |
120 ft | 30° 8' 59" N | 86° 43' 1" W |
| Sand Dollar Reef - #5 |
110 Concrete Culverts, 2 of 2 Drops This Date And Grant Primary Material: Module Deploy Date: 2003/06/17 Depth: 120 ft Relief: 10 ft [1] Tides & Fishing Times |
120 ft | 30° 8' 53" N | 86° 42' 53" W |
| Sand Dollar Reef #28 |
34 Fish Havens, 2 of 2 Drops This Grant And Date Primary Material: Module Deploy Date: 2003/06/11 Depth: 119 ft Relief: 6 ft [1] Tides & Fishing Times |
119 ft | 30° 8' 52" N | 86° 43' 6" W |
| Sandflea Reef #1 |
2 Walter Tetrahedrons, 1 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 22' 2" N | 86° 26' 42" W |
| Sandflea Reef #10 |
2 Walter Tetrahedrons, 10 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 33" N | 86° 25' 56" W |
| Sandflea Reef #11 |
2 Walter Tetrahedrons, 11 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 29" N | 86° 26' 1" W |
| Sandflea Reef #12 |
2 Walter Tetrahedrons, 12 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 70 ft Relief: 10 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 27" N | 86° 25' 55" W |
| Sandflea Reef #13 |
2 Walter Tetrahedrons, 13 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 25" N | 86° 26' 12" W |
| Sandflea Reef #14 |
2 Walter Tetrahedrons, 14 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 34" N | 86° 26' 13" W |
| Sandflea Reef #15 |
2 Walter Tetrahedrons, 1 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 28" N | 86° 26' 24" W |
| Sandflea Reef #16 |
2 Walter Tetrahedrons, 2 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 24" N | 86° 26' 30" W |
| Sandflea Reef #17 |
2 Walter Tetrahedrons, 3 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 24" N | 86° 26' 41" W |
| Sandflea Reef #18 |
2 Walter Tetrahedrons, 4 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 30" N | 86° 26' 35" W |
| Sandflea Reef #19 |
2 Walter Tetrahedrons, 5 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 34" N | 86° 26' 41" W |
| Sandflea Reef #2 |
2 Walter Tetrahedrons, 2 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 59" N | 86° 26' 37" W |
| Sandflea Reef #20 |
2 Walter Tetrahedrons, 6 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 39" N | 86° 26' 36" W |
| Sandflea Reef #21 |
2 Walter Tetrahedrons, 7 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 38" N | 86° 26' 24" W |
| Sandflea Reef #22 |
2 Walter Tetrahedrons, 8 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 49" N | 86° 26' 41" W |
| Sandflea Reef #23 |
2 Walter Tetrahedrons, 9 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 49" N | 86° 26' 31" W |
| Sandflea Reef #24 |
2 Walter Tetrahedrons, 10 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 49" N | 86° 26' 12" W |
| Sandflea Reef #25 |
2 Walter Tetrahedrons, 11 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 49" N | 86° 26' 13" W |
| Sandflea Reef #26 |
2 Walter Tetrahedrons, 12 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 50" N | 86° 26' 12" W |
| Sandflea Reef #27 |
2 Walter Tetrahedrons, 13 of 13 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 50" N | 86° 26' 12" W |
| Sandflea Reef #3 |
2 Walter Tetrahedrons, 3 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 59" N | 86° 26' 25" W |
| Sandflea Reef #4 |
2 Walter Tetrahedrons, 4 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 22' 3" N | 86° 26' 14" W |
| Sandflea Reef #5 |
2 Walter Tetrahedrons, 5 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 22' 0" N | 86° 26' 1" W |
| Sandflea Reef #6 |
2 Walter Tetrahedrons, 6 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 56" N | 86° 25' 56" W |
| Sandflea Reef #7 |
2 Walter Tetrahedrons, 7 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 49" N | 86° 25' 56" W |
| Sandflea Reef #8 |
2 Walter Tetrahedrons, 8 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 41" N | 86° 25' 55" W |
| Sandflea Reef #9 |
2 Walter Tetrahedrons, 9 of 14 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/04 Depth: 62 ft Relief: 10 ft [1] Tides & Fishing Times |
62 ft | 30° 21' 39" N | 86° 26' 0" W |
| Sandflea Reef, Units #58 & #59 |
2 Walter Tetrahedrons, 30 of 33 Drops This Grant And Date, Lat/Lon For Unit #58 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 50" N | 86° 26' 25" W |
| Sandflea Reef, Units #60 & #61 |
2 Walter Tetrahedrons, 31 of 33 Drops This Grant And Date, Lat/Lon For Unit #60 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 49" N | 86° 26' 24" W |
| Sandflea Reef, Units #62 & #63 |
2 Walter Tetrahedrons, 32 of 33 Drops This Grant And Date, Lat/Lon For Unit #62 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 50" N | 86° 26' 23" W |
| Sandflea Reef, Units #64 & #65 |
2 Walter Tetrahedrons, 33 of 33 Drops This Grant And Date, Lat/Lon For Unit #64 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 50" N | 86° 26' 23" W |
| Starfish Reef - Patch #1 |
15 Walter Tetrahedrons, 1 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [1] Tides & Fishing Times |
100 ft | 30° 8' 58" N | 86° 37' 40" W |
| Starfish Reef - Patch #2 |
16 Walter Tetrahedrons, 2 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [1] Tides & Fishing Times |
100 ft | 30° 8' 55" N | 86° 37' 32" W |
| Starfish Reef - Patch #3 |
16 Walter Tetrahedrons, 3 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [1] Tides & Fishing Times |
100 ft | 30° 8' 48" N | 86° 37' 28" W |
| Starfish Reef - Patch #4 |
15 Walter Tetrahedrons, 4 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [1] Tides & Fishing Times |
100 ft | 30° 8' 42" N | 86° 37' 32" W |
| Starfish Reef - Patch #5 |
16 Walter Tetrahedrons, 1 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [1] Tides & Fishing Times |
103 ft | 30° 8' 37" N | 86° 37' 40" W |
| Starfish Reef - Patch #6 |
15 Walter Tetrahedrons, 2 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [1] Tides & Fishing Times |
103 ft | 30° 8' 40" N | 86° 37' 48" W |
| Starfish Reef - Patch #7 |
16 Walter Tetrahedrons, 3 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [1] Tides & Fishing Times |
103 ft | 30° 8' 48" N | 86° 37' 52" W |
| Starfish Reef - Patch #8 |
15 Walter Tetrahedrons, 4 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [1] Tides & Fishing Times |
103 ft | 30° 8' 55" N | 86° 37' 48" W |
| Tank Turrets |
M-60 Steel Tank Turrets, Average of 7 Coordinates Primary Material: Tank Deploy Date: 1998/05/21 [1] Tides & Fishing Times |
30° 9' 24" N | 86° 49' 5" W | |
| Training Reef |
Material In Line East/West To 13721.5/47139.5 (750 Feet Long) Primary Material: Rubble Deploy Date: 1995/06/30 Depth: 60 ft Relief: 5 ft [1] Tides & Fishing Times |
60 ft | 30° 22' 13" N | 86° 29' 37" W |
| Tugboat "Zuess" |
Tugboat, the "Zuess", 2nd of 2 Loads Primary Material: Vessel Deploy Date: 1992/06/29 Depth: 107 ft Relief: 15 ft [1] Tides & Fishing Times |
107 ft | 30° 9' 25" N | 86° 44' 29" W |
| Tully |
100ft push tug Primary Material: Vessel Deploy Date: 0//0 Depth: 135 ft Relief: 20 ft [1] Tides & Fishing Times |
135 ft | 30° 7' 9" N | 86° 26' 4" W |
| Urchin Reef, Drop #11 |
70 Walter Tetrahedrons in 38 Drops, Center=Drop #11, County =$ 7,875 Primary Material: Module Deploy Date: 2005/06/21 Depth: 70 ft Relief: 10 ft [1] Tides & Fishing Times |
70 ft | 30° 21' 48" N | 86° 27' 51" W |
| Urchin Reef, Units #1 &2 |
2 Walter Tetrahedrons, 1 of 33 Drops This Grant And Date, Lat/Lon For Unit #01 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 25" N | 86° 28' 12" W |
| Urchin Reef, Units #10 & #11 |
2 Walter Tetrahedrons, 6 of 33 Drops This Grant And Date, Lat/Lon For Unit #10 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 28" N | 86° 28' 47" W |
| Urchin Reef, Units #12 & #13 |
2 Walter Tetrahedrons, 7 of 33 Drops This Grant And Date, Lat/Lon For Unit #12 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 20" N | 86° 28' 12" W |
| Urchin Reef, Units #14 & #15 |
2 Walter Tetrahedrons, 8 of 33 Drops This Grant And Date, Lat/Lon For Unit #14 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 20" N | 86° 28' 2" W |
| Urchin Reef, Units #16 & #17 |
2 Walter Tetrahedrons, 9 of 33 Drops This Grant And Date, Lat/Lon For Unit #16 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 20" N | 86° 27' 54" W |
| Urchin Reef, Units #18 & #19 |
2 Walter Tetrahedrons, 10 of 33 Drops This Grant And Date, Lat/Lon For Unit #18 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 28" N | 86° 27' 43" W |
| Urchin Reef, Units #20 & #21 |
2 Walter Tetrahedrons, 11 of 33 Drops This Grant And Date, Lat/Lon For Unit #20 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 36" N | 86° 27' 31" W |
| Urchin Reef, Units #22 & #23 |
2 Walter Tetrahedrons, 12 of 33 Drops This Grant And Date, Lat/Lon For Unit #22 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 44" N | 86° 27' 31" W |
| Urchin Reef, Units #24 & #25 |
2 Walter Tetrahedrons, 13 of 33 Drops This Grant And Date, Lat/Lon For Unit #24 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 52" N | 86° 27' 31" W |
| Urchin Reef, Units #26 & #27 |
2 Walter Tetrahedrons, 14 of 33 Drops This Grant And Date, Lat/Lon For Unit #26 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 1" N | 86° 27' 31" W |
| Urchin Reef, Units #28 & #29 |
2 Walter Tetrahedrons, 15 of 33 Drops This Grant And Date, Lat/Lon For Unit #28 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 58" N | 86° 27' 36" W |
| Urchin Reef, Units #3 & #4 |
2 Walter Tetrahedrons, 2 of 33 Drops This Grant And Date, Lat/Lon For Unit #03 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 20" N | 86° 28' 13" W |
| Urchin Reef, Units #30 & #31 |
2 Walter Tetrahedrons, 16 of 33 Drops This Grant And Date, Lat/Lon For Unit #30 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 46" N | 86° 27' 37" W |
| Urchin Reef, Units #32 & #33 |
2 Walter Tetrahedrons, 17 of 33 Drops This Grant And Date, Lat/Lon For Unit #32 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 37" N | 86° 27' 39" W |
| Urchin Reef, Units #34 & #35 |
2 Walter Tetrahedrons, 18 of 33 Drops This Grant And Date, Lat/Lon For Unit #34 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 41" N | 86° 27' 58" W |
| Urchin Reef, Units #36 & #37 |
2 Walter Tetrahedrons, 19 of 33 Drops This Grant And Date, Lat/Lon For Unit #36 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 53" N | 86° 27' 55" W |
| Urchin Reef, Units #38 & #39 |
2 Walter Tetrahedrons, 20 of 33 Drops This Grant And Date, Lat/Lon For Unit #38 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 56" N | 86° 27' 55" W |
| Urchin Reef, Units #40 & #41 |
2 Walter Tetrahedrons, 21 of 33 Drops This Grant And Date, Lat/Lon For Unit #40 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 53" N | 86° 27' 59" W |
| Urchin Reef, Units #42 & #43 |
2 Walter Tetrahedrons, 22 of 33 Drops This Grant And Date, Lat/Lon For Unit #42 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 52" N | 86° 27' 51" W |
| Urchin Reef, Units #44 & #45 |
2 Walter Tetrahedrons, 23 of 33 Drops This Grant And Date Lat/Lon For Unit #44 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 49" N | 86° 27' 51" W |
| Urchin Reef, Units #46 & #47 |
2 Walter Tetrahedrons, 24 of 33 Drops This Grant And Date Lat/Lon For Unit #46 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 49" N | 86° 27' 54" W |
| Urchin Reef, Units #48 & #49 |
2 Walter Tetrahedrons, 25 of 33 Drops This Grant And Date, Lat/Lon For Unit #48 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 47" N | 86° 27' 54" W |
| Urchin Reef, Units #5 |
1 Walter Tetrahedron, 3 of 33 Drops This Grant And Date, Lat/Lon For Unit #5 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 15" N | 86° 28' 12" W |
| Urchin Reef, Units #50 & #51 |
2 Walter Tetrahedrons, 26 of 33 Drops This Grant And Date, Lat/Lon For Unit #50 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 47" N | 86° 27' 57" W |
| Urchin Reef, Units #52 & #53 |
2 Walter Tetrahedrons, 27 of 33 Drops This Grant And Date, Lat/Lon For Unit #52 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 44" N | 86° 27' 56" W |
| Urchin Reef, Units #54 & #55 |
2 Walter Tetrahedrons, 28 of 33 Drops This Grant And Date, Lat/Lon For Unit #54 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 45" N | 86° 27' 54" W |
| Urchin Reef, Units #56 & #57 |
2 Walter Tetrahedrons, 29 of 33 Drops This Grant And Date, Lat/Lon For Unit #56 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 43" N | 86° 27' 56" W |
| Urchin Reef, Units #6 & #7 |
2 Walter Tetrahedrons, 4 of 33 Drops This Grant And Date, Lat/Lon For Unit #06 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 19" N | 86° 28' 20" W |
| Urchin Reef, Units #8 & #9 |
2 Walter Tetrahedrons, 5 of 33 Drops This Grant And Date, Lat/Lon For Unit #08 Primary Material: Module Deploy Date: 2007/06/22 Depth: 65 ft Relief: 8 ft [1] Tides & Fishing Times |
65 ft | 30° 21' 28" N | 86° 28' 4" W |
| VALP #3 |
65’ Steel Hull (broken up), Concrete Culvert Pipe Sections Primary Material: Culverts Deploy Date: 1996/08/05 Depth: 109 ft Relief: 6 ft [1] Tides & Fishing Times |
109 ft | 30° 9' 48" N | 86° 24' 44" W |
| Valparaiso #7 |
109 Culverts Two Sizes, 5’X8’, 2.5’X8’’, All One Location Primary Material: Culverts Deploy Date: 2001/05/30 Depth: 114 ft Relief: 3 ft [1] Tides & Fishing Times |
114 ft | 30° 8' 47" N | 86° 40' 47" W |
| Valparaiso #8 |
18" Dia. Culverts Nested Inside 30" Dia. Culverts, 94 Pairs All in one Location Primary Material: Culverts Deploy Date: 2002/05/08 Depth: 105 ft Relief: 5 ft [1] Tides & Fishing Times |
105 ft | 30° 8' 60" N | 86° 33' 16" W |
| Valparaiso 6-A |
2nd of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L Primary Material: Culverts Deploy Date: 2000/06/12 Depth: 130 ft Relief: 4 ft [1] Tides & Fishing Times |
130 ft | 30° 8' 33" N | 86° 48' 58" W |
| Valparaiso 6-B |
3rd of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L Primary Material: Culverts Deploy Date: 2000/06/12 Depth: 133 ft Relief: 4 ft [1] Tides & Fishing Times |
133 ft | 30° 8' 29" N | 86° 49' 3" W |
| Valparaiso 6-C |
1st of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L Primary Material: Culverts Deploy Date: 2000/06/12 Depth: 131 ft Relief: 4 ft [1] Tides & Fishing Times |
131 ft | 30° 8' 34" N | 86° 49' 4" W |
| Walton Hopper Barge |
195’ X 35’ X12’ Steel Barge, with 100 Tons Steel Ballast Primary Material: Vessel Deploy Date: 1999/06/30 Depth: 77 ft Relief: 12 ft [1] Tides & Fishing Times |
77 ft | 30° 19' 41" N | 86° 22' 54" W |
| Whiteman Tug Boat |
Steel Tug Boat Called The "Whiteman Tug Boat" Primary Material: Vessel Deploy Date: 1986/00/00 Depth: 309 ft Relief: 18 ft [1] Tides & Fishing Times |
309 ft | 30° 3' 49" N | 86° 47' 43" W |
| Williams Reef - 1A |
6th of 10 Drops This Date, This Reef, Valparaiso-Williams 1A Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [1] Tides & Fishing Times |
109 ft | 30° 9' 53" N | 86° 24' 6" W |
| Williams Reef - 1B |
7th of 10 Drops This Date, This Reef, Valparaiso-Williams 1B Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [1] Tides & Fishing Times |
109 ft | 30° 10' 2" N | 86° 24' 14" W |
| Williams Reef - 1C |
8th of 10 Drops This Date, This Reef, Valparaiso-Williams 1C Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [1] Tides & Fishing Times |
109 ft | 30° 10' 12" N | 86° 23' 58" W |
| Williams Reef - 1D |
9th of 10 Drops This Date, This Reef, Valparaiso-Williams 1D Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [1] Tides & Fishing Times |
109 ft | 30° 10' 9" N | 86° 23' 42" W |
| Williams Reef - 1E |
10 4th of 10 Drops This Date, This Reef, Valparaiso-Williams 1E Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [1] Tides & Fishing Times |
109 ft | 30° 9' 15" N | 86° 23' 45" W |