Santa Rosa County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad app (version 3.1+ on iOS version 16.4+) now also offers fishing coordinates, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Admiral Fetterman Reef 15 Superball Reefballs Around 100 Tons Of Rock 2 Of 2 Drops This Gra
Date of Deployment: June 1 2006
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 136
County: ESCAMBIA
Depth: 93 ft

Relief: 5 ft [1]
Tides & Solunars
93 ft 30° 4' 41" N 87° 11' 53" W
Antares' Ship 387 Foot Freighter - Antares
Date of Deployment: September 27 1995
Primary Material: SHIP STEEL 387’
County: ESCAMBIA
Depth: 130 ft

Relief: 60 ft [1]
Tides & Solunars
130 ft 30° 0' 28" N 87° 7' 50" W
Bay Bridge - Site #1 480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Date of Deployment: January 19 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 480
County: ESCAMBIA
Depth: 100 ft
[1]
Tides & Solunars
100 ft 30° 5' 53" N 87° 9' 3" W
Bay Bridge - Site #2 500 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Date of Deployment: February 1 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 500
County: ESCAMBIA
Depth: 100 ft
[1]
Tides & Solunars
100 ft 30° 5' 54" N 87° 9' 0" W
Bay Bridge - Site #3 480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Date of Deployment: February 20 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 480
County: ESCAMBIA
Depth: 100 ft
[1]
Tides & Solunars
100 ft 30° 5' 54" N 87° 9' 0" W
Bay Bridge - Site #4 460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Date of Deployment: March 6 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 460
County: ESCAMBIA
Depth: 100 ft
[1]
Tides & Solunars
100 ft 30° 5' 54" N 87° 9' 0" W
Brown Barge Middle School 1 Goliath Ball And 4 Pallet Balls
Date of Deployment: June 2 2004
Primary Material: MODULES CONCRETE REEFBALLS (5)
County: ESCAMBIA
Depth: 91 ft

Relief: 5 ft [1]
Tides & Solunars
91 ft 30° 6' 31" N 87° 11' 38" W
Celia Reef 15 Walter Florida Special Modules 1 Of 2 Drops This Day And Grant
Date of Deployment: June 14 2003
Primary Material: MODULES CONCRETE WALTERS FL (15)
Tonnage: 30
County: ESCAMBIA
Depth: 92 ft

Relief: 10 ft [1]
Tides & Solunars
92 ft 30° 5' 14" N 87° 11' 54" W
Chevron Platform Oil Rig Structure Two Jackets Laying Side By Side
Date of Deployment: October 18 1993
Primary Material: OIL RIG STRUCTURE
County: ESCAMBIA
Depth: 137 ft

Relief: 62 ft [1]
Tides & Solunars
137 ft 30° 4' 15" N 87° 2' 7" W
Concrete ' Fish Havens' Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (2 Of 3)
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (21)
Tonnage: 24.2
County: ESCAMBIA
Depth: 96 ft

Relief: 6 ft [1]
Tides & Solunars
96 ft 30° 5' 50" N 87° 8' 9" W
Concrete ' Fish Havens' Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (3 Of 3)
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (21)
Tonnage: 24.2
County: ESCAMBIA
Depth: 96 ft

Relief: 6 ft [1]
Tides & Solunars
96 ft 30° 5' 55" N 87° 7' 57" W
Concrete ' Fish Havens' Center For 53 Fish Havens (35-Fht And 18-Fh)
Date of Deployment: June 26 1999
Primary Material: MODULES CONCRETE FISH HAVENS(53)
Tonnage: 81
County: ESCAMBIA
Depth: 95 ft

Relief: 6 ft [1]
Tides & Solunars
95 ft 30° 5' 59" N 87° 7' 57" W
Concrete ' Fish Havens' Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (1 Of 3)
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (21)
Tonnage: 24.2
County: ESCAMBIA
Depth: 95 ft

Relief: 6 ft [1]
Tides & Solunars
95 ft 30° 6' 15" N 87° 7' 58" W
Concrete Pyramids 4 Sets Of 5 Pyramids Each (20 Total) In Line To (13309.0/47003.0)
Date of Deployment: April 29 1994
Primary Material: MODULES CONCRETE GHETTOS (20)
County: ESCAMBIA
Depth: 18 ft

Relief: 7 ft [1]
Tides & Solunars
18 ft 30° 4' 15" N 87° 1' 48" W
Don Phillips Barge And Parks Steel Deck Barge 120 X 33 X 7 And Steel And Concrete Merry-Go-Rounds
Date of Deployment: January 9 2005
Primary Material: BARGE STEEL 120’
Tonnage: 446
County: ESCAMBIA
Depth: 100 ft

Relief: 8 ft [1]
Tides & Solunars
100 ft 30° 5' 45" N 87° 10' 36" W
East Lap 'Army Tanks' Reef Ex Tank #9 -Pensacola
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA
Depth: 105 ft

Relief: 10 ft [1]
Tides & Solunars
105 ft 30° 6' 30" N 87° 11' 60" W
East Lap 'Army Tanks' Reef Ex Tank #10-Pensacola
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA
Depth: 105 ft

Relief: 10 ft [1]
Tides & Solunars
105 ft 30° 6' 30" N 87° 11' 60" W
East Lap 'Army Tanks' Reef Ex Tank #11- Pensacola
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA
Depth: 105 ft

Relief: 10 ft [1]
Tides & Solunars
105 ft 30° 6' 30" N 87° 11' 59" W
East Lap 'Army Tanks' Reef Ex Tank #12-Pensacola
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA
Depth: 105 ft

Relief: 10 ft [1]
Tides & Solunars
105 ft 30° 6' 30" N 87° 11' 57" W
East Lap 'Army Tanks' Reef Ex Tank #13-Pensacola
Date of Deployment: December 18 1994
Primary Material: ARMY TANK M-60
Tonnage: 50
County: ESCAMBIA
Depth: 105 ft

Relief: 10 ft [1]
Tides & Solunars
105 ft 30° 6' 34" N 87° 11' 53" W
East Lap 'Chemical Courier' 80 Ft X 25 Ft. Wide X 38 Ft. Tall Tug The Chemical Courier
Date of Deployment: October 24 1996
Primary Material: SHIP STEEL TUG 80’
County: SANTA ROSA
Depth: 95 ft

Relief: 35 ft [1]
Tides & Solunars
95 ft 30° 5' 57" N 87° 10' 57" W
East Lap Reefballs 5Th Of Five Loads 5 Each Also At 13288.5/47044.9 And 13288.1/47045.0
Date of Deployment: June 27 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
County: SANTA ROSA
Depth: 94 ft

Relief: 5 ft [1]
Tides & Solunars
94 ft 30° 5' 43" N 87° 9' 32" W
East Lap Reefballs 4Th Of Five Loads 5 Each Also At 13285.1/47048.4 And 13286.4/47048.4
Date of Deployment: June 26 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
County: SANTA ROSA
Depth: 94 ft

Relief: 5 ft [1]
Tides & Solunars
94 ft 30° 5' 56" N 87° 10' 3" W
East Lap Reefballs 3Rd Of Five Loads 5 Each Also At 13286.1/47050.8 And 13286.8/47050.8
Date of Deployment: June 25 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
County: SANTA ROSA
Depth: 94 ft

Relief: 5 ft [1]
Tides & Solunars
94 ft 30° 6' 24" N 87° 10' 4" W
East Lap Reefballs 1 1St Of Five Loads15 Balls-5 Each @ 13270.6/47049.8& 13270.3/47049.7
Date of Deployment: June 19 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
County: SANTA ROSA
Depth: 94 ft

Relief: 5 ft [1]
Tides & Solunars
94 ft 30° 6' 41" N 87° 11' 25" W
East Lap Reefballs 2Nd Of Five Loads 5 Each Also At 13270.4/47049.5 And 13285.6/47050.9
Date of Deployment: June 20 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
County: SANTA ROSA
Depth: 94 ft

Relief: 5 ft [1]
Tides & Solunars
94 ft 30° 6' 49" N 87° 10' 5" W
George Wilkins Reef 19 Goliath Reefballs 1 Of 2 Drops This Grant
Date of Deployment: June 24 2005
Primary Material: MODULES CONCRETE REEFBALLS (19)
Tonnage: 57
County: ESCAMBIA
Depth: 90 ft

Relief: 5 ft [1]
Tides & Solunars
90 ft 30° 5' 25" N 87° 10' 51" W
I-10 Bridge Reef - Site 2 I-10 22 Pieces Bridge Pilings 4’X4’x30’ (Mpr) Second Of 3 Loads
Date of Deployment: May 8 1997
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 800
County: ESCAMBIA
Depth: 128 ft

Relief: 8 ft [1]
Tides & Solunars
128 ft 30° 0' 31" N 87° 7' 46" W
J. Brown-Liberty Ship 440’ Liberty Ship, the "Joseph E. Brown"
Primary Material: Vessel
Deploy Date: 1980/00/00
Depth: 98 ft

Relief: 15 ft [3]
Tides & Solunars
98 ft 30° 12' 47" N 86° 49' 20" W
J. Brown-Liberty Ship 440’ Liberty Ship, the "Joseph E. Brown"
Primary Material: Vessel
Deploy Date: 1980/00/00
Depth: 98 ft

Relief: 15 ft [2]
Tides & Solunars
98 ft 30° 12' 47" N 86° 49' 20" W
J. Brown-Liberty Ship 440’ Liberty Ship, the "Joseph E. Brown"
Primary Material: Vessel
Deploy Date: 1980/00/00
Depth: 98 ft

Relief: 15 ft [2]
Tides & Solunars
98 ft 30° 12' 47" N 86° 49' 20" W
Knicklebine Barge Steel Barge And 14 Pieces Of Concrete Ballast
Date of Deployment: February 12 2003
Primary Material: BARGE STEEL 117’
County: ESCAMBIA
Depth: 122 ft

Relief: 11 ft [1]
Tides & Solunars
122 ft 30° 1' 58" N 87° 11' 30" W
Mara 16 Walter Florida Special Modules 2 Of 2 Drops This Day And Grant
Date of Deployment: June 14 2003
Primary Material: MODULES CONCRETE WALTERS FL (16)
Tonnage: 32
County: ESCAMBIA
Depth: 95 ft

Relief: 10 ft [1]
Tides & Solunars
95 ft 30° 5' 28" N 87° 11' 51" W
Mayor Whibbs Reef 18 Superball Reefballs 1 Of 2 Drops This Grant
Date of Deployment: June 1 2006
Primary Material: MODULES CONCRETE REEFBALLS (18)
Tonnage: 36
County: ESCAMBIA
Depth: 90 ft

Relief: 5 ft [1]
Tides & Solunars
90 ft 30° 4' 38" N 87° 11' 38" W
Mc Kay Reef Tires Appliances And Shopping Carts
Date of Deployment: December 31 1987
Primary Material: TIRES
County: SANTA ROSA
Depth: 156 ft
[1]
Tides & Solunars
156 ft 30° 4' 0" N 87° 4' 0" W
Navy Dive Tender Ydt-14 132 Feet Long 312 Tons Navy Dive Tender (1 1St Of Two This Date)
Date of Deployment: April 1 2000
Primary Material: SHIP STEEL 132’
Tonnage: 312
County: ESCAMBIA
Depth: 90 ft

Relief: 28 ft [1]
Tides & Solunars
90 ft 30° 5' 20" N 87° 9' 38" W
Navy Dive Tender Ydt-15 132 Feet Long 312 Tons Navy Dive Tender (2Nd Of Two This Date)
Date of Deployment: April 1 2000
Primary Material: SHIP STEEL 132’
Tonnage: 312
County: ESCAMBIA
Depth: 90 ft

Relief: 28 ft [1]
Tides & Solunars
90 ft 30° 5' 16" N 87° 9' 33" W
Okaloosa County Lap Site C 3rd of 3 Deployments (C) This Grant, 2nd of 2 This Date
Primary Material: Module
Deploy Date: 2000/06/20
Depth: 134 ft

Relief: 6 ft [2]
Tides & Solunars
134 ft 30° 8' 18" N 86° 48' 58" W
Okaloosa County Lap Site C 1st of 3 Deployments (A) This Grant, One This Date
Primary Material: Module
Deploy Date: 2000/06/15
Depth: 134 ft

Relief: 6 ft [2]
Tides & Solunars
134 ft 30° 8' 22" N 86° 49' 4" W
Okaloosa County Lap Site C 2nd of 3 Deployments (B) This Grant, 1 1st of 2 This Date
Primary Material: Module
Deploy Date: 2000/06/20
Depth: 134 ft

Relief: 6 ft [2]
Tides & Solunars
134 ft 30° 8' 23" N 86° 48' 58" W
Okaloosa County Lap Site C 2nd of 2 Deployments This Grant, Two Dates & Locations
Primary Material: Culverts
Deploy Date: 2000/06/15
Depth: 134 ft

Relief: 6 ft [2]
Tides & Solunars
134 ft 30° 8' 31" N 86° 49' 8" W
Oriskany Memorial Reef Navy Aircraft Carrier Ex-Uss Oriskany 888 Feet Long 135 Feet Deep To
Date of Deployment: May 17 2006
Primary Material: SHIP STEEL 888’
Tonnage: 32000
County: ESCAMBIA
Depth: 212 ft

Relief: 134 ft [1]
Tides & Solunars
212 ft 30° 2' 33" N 87° 0' 24" W
Pat Donnelly Reef 27 Goliath Reefballs Two Of Two Drops This Grant
Date of Deployment: June 28 2004
Primary Material: MODULES CONCRETE REEFBALLS (27)
Tonnage: 54
County: ESCAMBIA
Depth: 90 ft

Relief: 5 ft [1]
Tides & Solunars
90 ft 30° 4' 41" N 87° 11' 9" W
Penhall Ii Reef Blackwater Brdige Rubble 6 Loads Total
Date of Deployment: June 28 2003
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 4500
County: ESCAMBIA
Depth: 94 ft

Relief: 10 ft [1]
Tides & Solunars
94 ft 30° 4' 60" N 87° 10' 60" W
Penhall Reef Blackwater Brdige Rubble 4 Loads Total
Date of Deployment: February 9 2002
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 5700
County: ESCAMBIA
Depth: 92 ft

Relief: 12 ft [1]
Tides & Solunars
92 ft 30° 5' 31" N 87° 11' 30" W
Pensacoal Bay Fishing Bridge Reef # 460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Date of Deployment: February 17 2007
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 500
County: ESCAMBIA
Depth: 113 ft

Relief: 5 ft [1]
Tides & Solunars
113 ft 30° 6' 43" N 87° 9' 40" W
Ray Jones Reef 15 Goliath Reefballs And 100 Tons Rubble In Middle 1 Of 2 Drops This
Date of Deployment: June 24 2005
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 153
County: ESCAMBIA
Depth: 90 ft

Relief: 5 ft [1]
Tides & Solunars
90 ft 30° 5' 22" N 87° 10' 32" W
Rusty B Reef 30 Goliath Reefballs And 40 Tons Of Rock One Of Two Drops This Grant
Date of Deployment: June 22 2004
Primary Material: MODULES CONCRETE REEFBALLS (20)
Tonnage: 140
County: ESCAMBIA
Depth: 89 ft

Relief: 5 ft [1]
Tides & Solunars
89 ft 30° 4' 45" N 87° 11' 22" W
Santa Rosa Marine Resort - 1 4 Towers 30 Havens And 30 Juniors 5 Sites
Date of Deployment: June 2 2003
Primary Material: CONCRETE MODULES FISH HAVENS (64)
Tonnage: 50
County: SANTA ROSA
Depth: 97 ft

Relief: 6 ft [1]
Tides & Solunars
97 ft 30° 3' 27" N 87° 11' 56" W
Santa Rosa Marine Resort II - 1 30 Goliath Reef Balls Two Of Two Drops This Grant
Date of Deployment: July 12 2004
Primary Material: MODULES CONCRETE REEFBALLS(35)
County: SANTA ROSA
Depth: 85 ft

Relief: 5 ft [1]
Tides & Solunars
85 ft 30° 4' 54" N 87° 11' 42" W
Santa Rosa Marine Resort II - 2 30 Goliath Reef Balls First Of Two Drops This Grant
Date of Deployment: June 30 2004
Primary Material: MODULES CONCRETE REEFBALLS(36)
County: SANTA ROSA
Depth: 85 ft

Relief: 5 ft [1]
Tides & Solunars
85 ft 30° 4' 54" N 87° 11' 41" W
Santa Rosa Marine Resort III - 1 5 Towers 25 Havens And 25 Juniors At 13 Sites Site 3-1 Is Center
Date of Deployment: June 30 2005
Primary Material: CONCRETE MODULES FISH HAVENS (55)
Tonnage: 62.5
County: SANTA ROSA
Depth: 85 ft

Relief: 6 ft [1]
Tides & Solunars
85 ft 30° 4' 56" N 87° 10' 25" W
Santa Rosa Marine Resort IV - 1 15 Walters Coquina Sides Reefs 12 X 10 Around Center
Date of Deployment: May 24 2006
Primary Material: WALTER COQUINA REEFS (15)
Tonnage: 37.5
County: SANTA ROSA
Depth: 85 ft

Relief: 10 ft [1]
Tides & Solunars
85 ft 30° 4' 30" N 87° 11' 14" W
Santa Rosa Marine Resort IV - 2 15 Walters Coquina Sides Reefs 12 X 10 Around Center
Date of Deployment: May 24 2006
Primary Material: WALTER COQUINA REEFS (15)
Tonnage: 37.5
County: SANTA ROSA
Depth: 85 ft

Relief: 10 ft [1]
Tides & Solunars
85 ft 30° 4' 34" N 87° 11' 26" W
Tank Turrets M-60 Steel Tank Turrets, Average of 7 Coordinates
Primary Material: Tank
Deploy Date: 1998/05/21 [2]
Tides & Solunars
30° 9' 24" N 86° 49' 5" W
Tenneco Platform Oil Rig Platform2 Pieces 130’X 80 X 90’
Date of Deployment: September 29 1982
Primary Material: OIL RIG STRUCTURE
County: ESCAMBIA
Depth: 175 ft

Relief: 80 ft [1]
Tides & Solunars
175 ft 29° 59' 44" N 87° 5' 7" W
Valparaiso 6-A 2nd of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L
Primary Material: Culverts
Deploy Date: 2000/06/12
Depth: 130 ft

Relief: 4 ft [2]
Tides & Solunars
130 ft 30° 8' 33" N 86° 48' 58" W
Valparaiso 6-B 3rd of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L
Primary Material: Culverts
Deploy Date: 2000/06/12
Depth: 133 ft

Relief: 4 ft [2]
Tides & Solunars
133 ft 30° 8' 29" N 86° 49' 3" W
Valparaiso 6-C 1st of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L
Primary Material: Culverts
Deploy Date: 2000/06/12
Depth: 131 ft

Relief: 4 ft [2]
Tides & Solunars
131 ft 30° 8' 34" N 86° 49' 4" W
Woodburn Reef Truck Cabs
Date of Deployment: December 31 1987
Primary Material: STEEL TRUCK CABS
County: SANTA ROSA
Depth: 138 ft
[1]
Tides & Solunars
138 ft 29° 19' 60" N 87° 4' 0" W