Santa Rosa County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad app (version 3.1+ on iOS version 16.4+) now also offers fishing coordinates, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
Admiral Fetterman Reef |
15 Superball Reefballs Around 100 Tons Of Rock 2 Of 2 Drops This Gra Date of Deployment: June 1 2006 Primary Material: MODULES CONCRETE REEFBALLS (15) Tonnage: 136 County: ESCAMBIA Depth: 93 ft Relief: 5 ft [1] Tides & Solunars |
93 ft | 30° 4' 41" N | 87° 11' 53" W |
Antares' Ship |
387 Foot Freighter - Antares Date of Deployment: September 27 1995 Primary Material: SHIP STEEL 387’ County: ESCAMBIA Depth: 130 ft Relief: 60 ft [1] Tides & Solunars |
130 ft | 30° 0' 28" N | 87° 7' 50" W |
Bay Bridge - Site #1 |
480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: January 19 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 480 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 53" N | 87° 9' 3" W |
Bay Bridge - Site #2 |
500 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: February 1 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 500 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 54" N | 87° 9' 0" W |
Bay Bridge - Site #3 |
480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: February 20 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 480 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 54" N | 87° 9' 0" W |
Bay Bridge - Site #4 |
460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: March 6 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 460 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 54" N | 87° 9' 0" W |
Brown Barge Middle School |
1 Goliath Ball And 4 Pallet Balls Date of Deployment: June 2 2004 Primary Material: MODULES CONCRETE REEFBALLS (5) County: ESCAMBIA Depth: 91 ft Relief: 5 ft [1] Tides & Solunars |
91 ft | 30° 6' 31" N | 87° 11' 38" W |
Celia Reef |
15 Walter Florida Special Modules 1 Of 2 Drops This Day And Grant Date of Deployment: June 14 2003 Primary Material: MODULES CONCRETE WALTERS FL (15) Tonnage: 30 County: ESCAMBIA Depth: 92 ft Relief: 10 ft [1] Tides & Solunars |
92 ft | 30° 5' 14" N | 87° 11' 54" W |
Chevron Platform |
Oil Rig Structure Two Jackets Laying Side By Side Date of Deployment: October 18 1993 Primary Material: OIL RIG STRUCTURE County: ESCAMBIA Depth: 137 ft Relief: 62 ft [1] Tides & Solunars |
137 ft | 30° 4' 15" N | 87° 2' 7" W |
Concrete ' Fish Havens' |
Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (2 Of 3) Date of Deployment: June 20 2000 Primary Material: MODULES CONCRETE FISH HAVENS (21) Tonnage: 24.2 County: ESCAMBIA Depth: 96 ft Relief: 6 ft [1] Tides & Solunars |
96 ft | 30° 5' 50" N | 87° 8' 9" W |
Concrete ' Fish Havens' |
Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (3 Of 3) Date of Deployment: June 20 2000 Primary Material: MODULES CONCRETE FISH HAVENS (21) Tonnage: 24.2 County: ESCAMBIA Depth: 96 ft Relief: 6 ft [1] Tides & Solunars |
96 ft | 30° 5' 55" N | 87° 7' 57" W |
Concrete ' Fish Havens' |
Center For 53 Fish Havens (35-Fht And 18-Fh) Date of Deployment: June 26 1999 Primary Material: MODULES CONCRETE FISH HAVENS(53) Tonnage: 81 County: ESCAMBIA Depth: 95 ft Relief: 6 ft [1] Tides & Solunars |
95 ft | 30° 5' 59" N | 87° 7' 57" W |
Concrete ' Fish Havens' |
Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (1 Of 3) Date of Deployment: June 20 2000 Primary Material: MODULES CONCRETE FISH HAVENS (21) Tonnage: 24.2 County: ESCAMBIA Depth: 95 ft Relief: 6 ft [1] Tides & Solunars |
95 ft | 30° 6' 15" N | 87° 7' 58" W |
Concrete Pyramids |
4 Sets Of 5 Pyramids Each (20 Total) In Line To (13309.0/47003.0) Date of Deployment: April 29 1994 Primary Material: MODULES CONCRETE GHETTOS (20) County: ESCAMBIA Depth: 18 ft Relief: 7 ft [1] Tides & Solunars |
18 ft | 30° 4' 15" N | 87° 1' 48" W |
Don Phillips Barge And Parks |
Steel Deck Barge 120 X 33 X 7 And Steel And Concrete Merry-Go-Rounds Date of Deployment: January 9 2005 Primary Material: BARGE STEEL 120’ Tonnage: 446 County: ESCAMBIA Depth: 100 ft Relief: 8 ft [1] Tides & Solunars |
100 ft | 30° 5' 45" N | 87° 10' 36" W |
East Lap 'Army Tanks' |
Reef Ex Tank #9 -Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 60" W |
East Lap 'Army Tanks' |
Reef Ex Tank #10-Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 60" W |
East Lap 'Army Tanks' |
Reef Ex Tank #11- Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 59" W |
East Lap 'Army Tanks' |
Reef Ex Tank #12-Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 57" W |
East Lap 'Army Tanks' |
Reef Ex Tank #13-Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANK M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 34" N | 87° 11' 53" W |
East Lap 'Chemical Courier' |
80 Ft X 25 Ft. Wide X 38 Ft. Tall Tug The Chemical Courier Date of Deployment: October 24 1996 Primary Material: SHIP STEEL TUG 80’ County: SANTA ROSA Depth: 95 ft Relief: 35 ft [1] Tides & Solunars |
95 ft | 30° 5' 57" N | 87° 10' 57" W |
East Lap Reefballs |
5Th Of Five Loads 5 Each Also At 13288.5/47044.9 And 13288.1/47045.0 Date of Deployment: June 27 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 5' 43" N | 87° 9' 32" W |
East Lap Reefballs |
4Th Of Five Loads 5 Each Also At 13285.1/47048.4 And 13286.4/47048.4 Date of Deployment: June 26 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 5' 56" N | 87° 10' 3" W |
East Lap Reefballs |
3Rd Of Five Loads 5 Each Also At 13286.1/47050.8 And 13286.8/47050.8 Date of Deployment: June 25 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 6' 24" N | 87° 10' 4" W |
East Lap Reefballs |
1 1St Of Five Loads15 Balls-5 Each @ 13270.6/47049.8& 13270.3/47049.7 Date of Deployment: June 19 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 6' 41" N | 87° 11' 25" W |
East Lap Reefballs |
2Nd Of Five Loads 5 Each Also At 13270.4/47049.5 And 13285.6/47050.9 Date of Deployment: June 20 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 6' 49" N | 87° 10' 5" W |
George Wilkins Reef |
19 Goliath Reefballs 1 Of 2 Drops This Grant Date of Deployment: June 24 2005 Primary Material: MODULES CONCRETE REEFBALLS (19) Tonnage: 57 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 5' 25" N | 87° 10' 51" W |
I-10 Bridge Reef - Site 2 |
I-10 22 Pieces Bridge Pilings 4’X4’x30’ (Mpr) Second Of 3 Loads Date of Deployment: May 8 1997 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 800 County: ESCAMBIA Depth: 128 ft Relief: 8 ft [1] Tides & Solunars |
128 ft | 30° 0' 31" N | 87° 7' 46" W |
J. Brown-Liberty Ship |
440’ Liberty Ship, the "Joseph E. Brown" Primary Material: Vessel Deploy Date: 1980/00/00 Depth: 98 ft Relief: 15 ft [3] Tides & Solunars |
98 ft | 30° 12' 47" N | 86° 49' 20" W |
J. Brown-Liberty Ship |
440’ Liberty Ship, the "Joseph E. Brown" Primary Material: Vessel Deploy Date: 1980/00/00 Depth: 98 ft Relief: 15 ft [2] Tides & Solunars |
98 ft | 30° 12' 47" N | 86° 49' 20" W |
J. Brown-Liberty Ship |
440’ Liberty Ship, the "Joseph E. Brown" Primary Material: Vessel Deploy Date: 1980/00/00 Depth: 98 ft Relief: 15 ft [2] Tides & Solunars |
98 ft | 30° 12' 47" N | 86° 49' 20" W |
Knicklebine Barge |
Steel Barge And 14 Pieces Of Concrete Ballast Date of Deployment: February 12 2003 Primary Material: BARGE STEEL 117’ County: ESCAMBIA Depth: 122 ft Relief: 11 ft [1] Tides & Solunars |
122 ft | 30° 1' 58" N | 87° 11' 30" W |
Mara |
16 Walter Florida Special Modules 2 Of 2 Drops This Day And Grant Date of Deployment: June 14 2003 Primary Material: MODULES CONCRETE WALTERS FL (16) Tonnage: 32 County: ESCAMBIA Depth: 95 ft Relief: 10 ft [1] Tides & Solunars |
95 ft | 30° 5' 28" N | 87° 11' 51" W |
Mayor Whibbs Reef |
18 Superball Reefballs 1 Of 2 Drops This Grant Date of Deployment: June 1 2006 Primary Material: MODULES CONCRETE REEFBALLS (18) Tonnage: 36 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 4' 38" N | 87° 11' 38" W |
Mc Kay Reef |
Tires Appliances And Shopping Carts Date of Deployment: December 31 1987 Primary Material: TIRES County: SANTA ROSA Depth: 156 ft [1] Tides & Solunars |
156 ft | 30° 4' 0" N | 87° 4' 0" W |
Navy Dive Tender Ydt-14 |
132 Feet Long 312 Tons Navy Dive Tender (1 1St Of Two This Date) Date of Deployment: April 1 2000 Primary Material: SHIP STEEL 132’ Tonnage: 312 County: ESCAMBIA Depth: 90 ft Relief: 28 ft [1] Tides & Solunars |
90 ft | 30° 5' 20" N | 87° 9' 38" W |
Navy Dive Tender Ydt-15 |
132 Feet Long 312 Tons Navy Dive Tender (2Nd Of Two This Date) Date of Deployment: April 1 2000 Primary Material: SHIP STEEL 132’ Tonnage: 312 County: ESCAMBIA Depth: 90 ft Relief: 28 ft [1] Tides & Solunars |
90 ft | 30° 5' 16" N | 87° 9' 33" W |
Okaloosa County Lap Site C |
3rd of 3 Deployments (C) This Grant, 2nd of 2 This Date Primary Material: Module Deploy Date: 2000/06/20 Depth: 134 ft Relief: 6 ft [2] Tides & Solunars |
134 ft | 30° 8' 18" N | 86° 48' 58" W |
Okaloosa County Lap Site C |
1st of 3 Deployments (A) This Grant, One This Date Primary Material: Module Deploy Date: 2000/06/15 Depth: 134 ft Relief: 6 ft [2] Tides & Solunars |
134 ft | 30° 8' 22" N | 86° 49' 4" W |
Okaloosa County Lap Site C |
2nd of 3 Deployments (B) This Grant, 1 1st of 2 This Date Primary Material: Module Deploy Date: 2000/06/20 Depth: 134 ft Relief: 6 ft [2] Tides & Solunars |
134 ft | 30° 8' 23" N | 86° 48' 58" W |
Okaloosa County Lap Site C |
2nd of 2 Deployments This Grant, Two Dates & Locations Primary Material: Culverts Deploy Date: 2000/06/15 Depth: 134 ft Relief: 6 ft [2] Tides & Solunars |
134 ft | 30° 8' 31" N | 86° 49' 8" W |
Oriskany Memorial Reef |
Navy Aircraft Carrier Ex-Uss Oriskany 888 Feet Long 135 Feet Deep To Date of Deployment: May 17 2006 Primary Material: SHIP STEEL 888’ Tonnage: 32000 County: ESCAMBIA Depth: 212 ft Relief: 134 ft [1] Tides & Solunars |
212 ft | 30° 2' 33" N | 87° 0' 24" W |
Pat Donnelly Reef |
27 Goliath Reefballs Two Of Two Drops This Grant Date of Deployment: June 28 2004 Primary Material: MODULES CONCRETE REEFBALLS (27) Tonnage: 54 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 4' 41" N | 87° 11' 9" W |
Penhall Ii Reef |
Blackwater Brdige Rubble 6 Loads Total Date of Deployment: June 28 2003 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 4500 County: ESCAMBIA Depth: 94 ft Relief: 10 ft [1] Tides & Solunars |
94 ft | 30° 4' 60" N | 87° 10' 60" W |
Penhall Reef |
Blackwater Brdige Rubble 4 Loads Total Date of Deployment: February 9 2002 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 5700 County: ESCAMBIA Depth: 92 ft Relief: 12 ft [1] Tides & Solunars |
92 ft | 30° 5' 31" N | 87° 11' 30" W |
Pensacoal Bay Fishing Bridge Reef # |
460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: February 17 2007 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 500 County: ESCAMBIA Depth: 113 ft Relief: 5 ft [1] Tides & Solunars |
113 ft | 30° 6' 43" N | 87° 9' 40" W |
Ray Jones Reef |
15 Goliath Reefballs And 100 Tons Rubble In Middle 1 Of 2 Drops This Date of Deployment: June 24 2005 Primary Material: MODULES CONCRETE REEFBALLS (15) Tonnage: 153 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 5' 22" N | 87° 10' 32" W |
Rusty B Reef |
30 Goliath Reefballs And 40 Tons Of Rock One Of Two Drops This Grant Date of Deployment: June 22 2004 Primary Material: MODULES CONCRETE REEFBALLS (20) Tonnage: 140 County: ESCAMBIA Depth: 89 ft Relief: 5 ft [1] Tides & Solunars |
89 ft | 30° 4' 45" N | 87° 11' 22" W |
Santa Rosa Marine Resort - 1 |
4 Towers 30 Havens And 30 Juniors 5 Sites Date of Deployment: June 2 2003 Primary Material: CONCRETE MODULES FISH HAVENS (64) Tonnage: 50 County: SANTA ROSA Depth: 97 ft Relief: 6 ft [1] Tides & Solunars |
97 ft | 30° 3' 27" N | 87° 11' 56" W |
Santa Rosa Marine Resort II - 1 |
30 Goliath Reef Balls Two Of Two Drops This Grant Date of Deployment: July 12 2004 Primary Material: MODULES CONCRETE REEFBALLS(35) County: SANTA ROSA Depth: 85 ft Relief: 5 ft [1] Tides & Solunars |
85 ft | 30° 4' 54" N | 87° 11' 42" W |
Santa Rosa Marine Resort II - 2 |
30 Goliath Reef Balls First Of Two Drops This Grant Date of Deployment: June 30 2004 Primary Material: MODULES CONCRETE REEFBALLS(36) County: SANTA ROSA Depth: 85 ft Relief: 5 ft [1] Tides & Solunars |
85 ft | 30° 4' 54" N | 87° 11' 41" W |
Santa Rosa Marine Resort III - 1 |
5 Towers 25 Havens And 25 Juniors At 13 Sites Site 3-1 Is Center Date of Deployment: June 30 2005 Primary Material: CONCRETE MODULES FISH HAVENS (55) Tonnage: 62.5 County: SANTA ROSA Depth: 85 ft Relief: 6 ft [1] Tides & Solunars |
85 ft | 30° 4' 56" N | 87° 10' 25" W |
Santa Rosa Marine Resort IV - 1 |
15 Walters Coquina Sides Reefs 12 X 10 Around Center Date of Deployment: May 24 2006 Primary Material: WALTER COQUINA REEFS (15) Tonnage: 37.5 County: SANTA ROSA Depth: 85 ft Relief: 10 ft [1] Tides & Solunars |
85 ft | 30° 4' 30" N | 87° 11' 14" W |
Santa Rosa Marine Resort IV - 2 |
15 Walters Coquina Sides Reefs 12 X 10 Around Center Date of Deployment: May 24 2006 Primary Material: WALTER COQUINA REEFS (15) Tonnage: 37.5 County: SANTA ROSA Depth: 85 ft Relief: 10 ft [1] Tides & Solunars |
85 ft | 30° 4' 34" N | 87° 11' 26" W |
Tank Turrets |
M-60 Steel Tank Turrets, Average of 7 Coordinates Primary Material: Tank Deploy Date: 1998/05/21 [2] Tides & Solunars |
30° 9' 24" N | 86° 49' 5" W | |
Tenneco Platform |
Oil Rig Platform2 Pieces 130’X 80 X 90’ Date of Deployment: September 29 1982 Primary Material: OIL RIG STRUCTURE County: ESCAMBIA Depth: 175 ft Relief: 80 ft [1] Tides & Solunars |
175 ft | 29° 59' 44" N | 87° 5' 7" W |
Valparaiso 6-A |
2nd of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L Primary Material: Culverts Deploy Date: 2000/06/12 Depth: 130 ft Relief: 4 ft [2] Tides & Solunars |
130 ft | 30° 8' 33" N | 86° 48' 58" W |
Valparaiso 6-B |
3rd of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L Primary Material: Culverts Deploy Date: 2000/06/12 Depth: 133 ft Relief: 4 ft [2] Tides & Solunars |
133 ft | 30° 8' 29" N | 86° 49' 3" W |
Valparaiso 6-C |
1st of 3 Deployments This Grant, Same Date & 3 Locations, All 4’D X 7’L Primary Material: Culverts Deploy Date: 2000/06/12 Depth: 131 ft Relief: 4 ft [2] Tides & Solunars |
131 ft | 30° 8' 34" N | 86° 49' 4" W |
Woodburn Reef |
Truck Cabs Date of Deployment: December 31 1987 Primary Material: STEEL TRUCK CABS County: SANTA ROSA Depth: 138 ft [1] Tides & Solunars |
138 ft | 29° 19' 60" N | 87° 4' 0" W |