Franklin County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. A GPX file download is provided at the bottom of the page if you'd like to import all the locations into your GPS. Note that they may also include locations from nearby areas. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. If you have any feedback, or want to suggest any additional sites, please feel free to Contact Us.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Apalachicola City Two Barges 140X28x12 And 140X35x9 Filled With 50 Tires Each
Date of Deployment: July 11 1984
Primary Material: BARGE STEEL (2)
County: FRANKLIN
Depth: 80 ft

Relief: 12 ft [1]
Tides & Solunars
80 ft 29° 27' 33" N 84° 50' 23" W
Bryson Additions 150 Tons Of Miscellaneous Concrete Between Two Tugs
Date of Deployment: June 18 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: FRANKLIN
Depth: 79 ft

Relief: 6 ft [1]
Tides & Solunars
79 ft 29° 31' 19" N 84° 24' 33" W
Bryson Additions 250 Tons Of Micellaneous Concrete Toward Stern Of Atlas
Date of Deployment: June 26 1998
Primary Material: CONCRETE RUBBLE
Tonnage: 250
County: FRANKLIN
Depth: 79 ft

Relief: 6 ft [1]
Tides & Solunars
79 ft 29° 31' 20" N 84° 24' 34" W
Bryson Memorial Reef 108 Foot Tugboat The Moonlighter 35 Feet Wide
Date of Deployment: February 11 1997
Primary Material: SHIP STEEL TUG 108’
County: FRANKLIN
Depth: 75 ft

Relief: 29 ft [1]
Tides & Solunars
75 ft 29° 31' 15" N 84° 24' 32" W
Bryson Memorial Reef 85 Foot Tugboat The Atlas 35 Feet Wide
Date of Deployment: February 11 1997
Primary Material: SHIP STEEL TUG 85’
Tonnage: 200
County: FRANKLIN
Depth: 79 ft

Relief: 22 ft [1]
Tides & Solunars
79 ft 29° 31' 20" N 84° 24' 31" W
C Tower Navigational Tower 100 Ft. Above Water Sitting In A Barge
Date of Deployment: December 31 1973
Primary Material: BARGE STEEL
County: FRANKLIN [1]
Tides & Solunars
29° 24' 14" N 84° 51' 28" W
Carrabelle 3 Mile 4 4Th Load This Date 200 Total
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 3" N 84° 34' 28" W
Carrabelle 3 Mile 3 Rd Load This Date 200 Total
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
Depth: 39 ft

Relief: 8 ft [1]
Tides & Solunars
39 ft 29° 45' 4" N 84° 34' 29" W
Carrabelle 3 Mile 2 Nd Load This Date 200 Total
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 4" N 84° 34' 30" W
Carrabelle 3 Mile Reef (1) 1 1St Of 4 Loads This Date 200 Tons Of Concrete Culverts
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
Depth: 39 ft

Relief: 10 ft [1]
Tides & Solunars
39 ft 29° 45' 5" N 84° 34' 31" W
Carrabelle 3 Mile Reef (1) 1 1St Load Of 6 Deployment Dates 30 Pieces
Date of Deployment: June 5 1993
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 60
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 5" N 84° 34' 33" W
Carrabelle 3 Mile Reef (2) 2 Nd Load Of 6 Deployment Dates 30 Pieces
Date of Deployment: June 7 1993
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 60
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 4" N 84° 34' 31" W
Carrabelle 3 Mile Reef (3) 3 Rd Load Of 6 Deployment Dates 30 Pieces
Date of Deployment: June 9 1993
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 84
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 3" N 84° 34' 30" W
Carrabelle 3 Mile Reef (4) 4 4Th Load Of 6 Deployment Dates 37 Pieces
Date of Deployment: June 11 1993
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 109
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 3" N 84° 34' 30" W
Carrabelle 3 Mile Reef (5) 5 4Th Load Of 6 Deployment Dates 23 Pieces
Date of Deployment: June 13 1993
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 58
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 1" N 84° 34' 28" W
Carrabelle 3 Mile Reef(6) 6 4Th Load Of 6 Deployment Dates 19 Pieces Off Site Pile
Date of Deployment: June 20 1993
Primary Material: CONCRETE CULVERTS (19)
Tonnage: 48
County: FRANKLIN
Depth: 39 ft

Relief: 7 ft [1]
Tides & Solunars
39 ft 29° 45' 2" N 84° 34' 40" W
Carrabelle Reef Culverts Concrete Rubble Fuel Storage Tanks Old Site
Date of Deployment: December 31 1982
Primary Material: CONCRETE RUBBLE
County: FRANKLIN
Depth: 70 ft
[1]
Tides & Solunars
70 ft 29° 32' 22" N 84° 37' 28" W
Carrabelle/Rotary First Of 4 Drops This Project Buoy At 31330.0/46400.0
Date of Deployment: September 27 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
Tides & Solunars
29° 31' 7" N 84° 39' 27" W
Carrabelle/Rotary Fourth Of 4 Drops This Grant
Date of Deployment: November 10 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
Tides & Solunars
29° 31' 7" N 84° 39' 27" W
Carrabelle/Rotary Second Of 4 Drops This Grant 250 Yards From O Tower
Date of Deployment: October 11 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
Tides & Solunars
29° 31' 7" N 84° 39' 27" W
Carrabelle/Rotary Third Of 4 Drops This Grant
Date of Deployment: October 27 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
Tides & Solunars
29° 31' 7" N 84° 39' 27" W
City Of Apalachicola Site Bridge Rubble From High Part Of Apalachicola Bridge
Date of Deployment: December 10 1988
Primary Material: BRIDGE RUBBLE
County: FRANKLIN
Depth: 78 ft

Relief: 8 ft [1]
Tides & Solunars
78 ft 29° 27' 47" N 84° 50' 9" W
Exxon Template Oil Rig Structure
Date of Deployment: December 31 1980
Primary Material: OIL RIG STRUCTURE
County: FRANKLIN
Depth: 106 ft

Relief: 40 ft [1]
Tides & Solunars
106 ft 29° 17' 43" N 84° 36' 49" W
Florida Gas Transmission Reef (B) Concrete Debris Donated By Florida Gas Transmission Company
Date of Deployment: January 6 2000
Primary Material: CONCRETE RUBBLE
Tonnage: 600
County: FRANKLIN
Depth: 21 ft

Relief: 6 ft [1]
Tides & Solunars
21 ft 29° 49' 52" N 84° 30' 15" W
Franklin County Reef (Bridge) Part Of Bay Bridge County Reef Mainly Slabs
Date of Deployment: December 10 1988
Primary Material: BRIDGE MATERIALS SPANS
County: FRANKLIN
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 32' 27" N 84° 45' 44" W
K Tower Navigational Tower 100 Ft. Above Water Sitting Inside Hopper Barge
Date of Deployment: December 31 1981
Primary Material: BARGE STEEL
County: FRANKLIN
Depth: 60 ft
[1]
Tides & Solunars
60 ft 29° 39' 58" N 84° 22' 9" W
L Buoy Reef Concrete Rubble
Date of Deployment: December 31 1965
Primary Material: CONCRETE RUBBLE
County: FRANKLIN
Depth: 45 ft
[1]
Tides & Solunars
45 ft 29° 31' 7" N 85° 7' 21" W
O Tower Navigational Tower 100 Ft. Above Water Sitting In A Barge
Date of Deployment: December 31 1977
Primary Material: BARGE STEEL
County: FRANKLIN
Depth: 70 ft
[1]
Tides & Solunars
70 ft 29° 32' 12" N 84° 37' 4" W
O-Tower Barge Aka Carrabelle Reef B Metal Barge
Date of Deployment: December 31 1982
Primary Material: BARGE STEEL
County: FRANKLIN
Depth: 74 ft

Relief: 6 ft [1]
Tides & Solunars
74 ft 29° 31' 59" N 84° 37' 12" W
One More Time 75 Foot Long Steel Shrimp Boat Deployed By Oar Sunk On Way Out
Date of Deployment: March 8 1992
Primary Material: SHIP STEEL SHRIMPER
County: FRANKLIN
Depth: 36 ft

Relief: 12 ft [1]
Tides & Solunars
36 ft 29° 42' 21" N 84° 37' 25" W
One More Time Addition 75 Pieces Of 20 To 25 Feet Long (3.5 Ft X 2 Ft) Concrete Beams
Date of Deployment: June 22 2000
Primary Material: CONCRETE L BEAMS
Tonnage: 250
County: FRANKLIN
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 42' 22" N 84° 37' 23" W
Rose City Reef 20 Fish Haven Towers And 30 Fish Havens
Date of Deployment: May 25 2003
Primary Material: MODULES CONCRETE FISH HAVEN (50)
Tonnage: 50
County: FRANKLIN
Depth: 50 ft

Relief: 6 ft [1]
Tides & Solunars
50 ft 29° 40' 0" N 84° 30' 0" W
S Tower Navigational Tower 100 Ft. Above Water Sitting Inside A Barge
Date of Deployment: December 31 1980
Primary Material: BARGE STEEL
County: FRANKLIN
Depth: 105 ft
[1]
Tides & Solunars
105 ft 29° 17' 58" N 84° 36' 39" W
St George Island Bridge Reef-Center Single Concrete Bridge Span 55’X28’x6’ 53 Of 108 Drops
Date of Deployment: April 9 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
Depth: 75 ft

Relief: 10 ft [1]
Tides & Solunars
75 ft 29° 30' 0" N 84° 49' 4" W
St George Island Bridge Reef-East C Single Concrete Bridge Span 55’X28’x6’ 94 Of 108 Drops
Date of Deployment: April 23 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
Depth: 75 ft

Relief: 10 ft [1]
Tides & Solunars
75 ft 29° 29' 57" N 84° 48' 39" W
St George Island Bridge Reef-East E Single Concrete Bridge Span 55’X28’x6’ 35 Of 108 Drops
Date of Deployment: March 28 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
Depth: 75 ft

Relief: 10 ft [1]
Tides & Solunars
75 ft 29° 30' 1" N 84° 48' 11" W
St George Island Bridge Reef-West C Single Concrete Bridge Span 55’X28’x6’ 77 Of 108 Drops
Date of Deployment: May 13 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
Depth: 75 ft

Relief: 10 ft [1]
Tides & Solunars
75 ft 29° 29' 60" N 84° 49' 26" W
St George Island Bridge Reef-West E 40 Concrete Bridge Pilings 20’X20’X20’ 99 Of 108 Drops
Date of Deployment: June 3 2004
Primary Material: CONCRETE BRIDGE PILINGS (40)
Tonnage: 80
County: FRANKLIN
Depth: 75 ft

Relief: 10 ft [1]
Tides & Solunars
75 ft 29° 30' 3" N 84° 49' 56" W
Two Dogs Culverts 130 Culverts 8’X18 In 25 Patches 50 Feet Apart
Date of Deployment: June 24 1999
Primary Material: CONCRETE CULVERTS (130)
County: FRANKLIN
Depth: 37 ft

Relief: 2 ft [1]
Tides & Solunars
37 ft 29° 45' 55" N 84° 31' 41" W
Two Dogs Reefballs 130 Pallet Balls In 25 Patches 50 Feet Apart
Date of Deployment: June 14 1999
Primary Material: MODULES CONCRETE REEFBALLS (130)
Tonnage: 117
County: FRANKLIN
Depth: 37 ft

Relief: 4 ft [1]
Tides & Solunars
37 ft 29° 46' 4" N 84° 31' 29" W
V Tower Navigational Tower 100Ft. Above Water Sitting Inside Hopper Barge
Date of Deployment: December 31 1981
Primary Material: BARGE STEEL
County: FRANKLIN
Depth: 70 ft
[1]
Tides & Solunars
70 ft 29° 24' 56" N 84° 20' 4" W
Yamaha Reef - Addition #3 Addition To Existing Barge Reef 95 Pieces Total.
Date of Deployment: May 4 1995
Primary Material: CONCRETE PILINGS
County: FRANKLIN
Depth: 85 ft

Relief: 12 ft [1]
Tides & Solunars
85 ft 29° 34' 27" N 84° 32' 16" W
Yamaha Reef - Addition #4 First Load Of Two
Date of Deployment: May 2 1995
Primary Material: CONCRETE PILINGS
Tonnage: 306
County: FRANKLIN
Depth: 85 ft

Relief: 10 ft [1]
Tides & Solunars
85 ft 29° 34' 25" N 84° 32' 16" W
Yamaha Reef - Southern Addition #1 2 Of 2 Loads This Grant Large Concrete I-Beams Oar
Date of Deployment: June 21 2001
Primary Material: CONCRETE L BEAMS (52)
Tonnage: 215.4
County: FRANKLIN
Depth: 76 ft

Relief: 20 ft [1]
Tides & Solunars
76 ft 29° 34' 21" N 84° 32' 12" W
Yamaha Reef - Southern Addition #2 1 Of 2 Loads This Grant Large Concrete I-Beams Oar
Date of Deployment: June 18 2001
Primary Material: CONCRETE L BEAMS (42)
Tonnage: 161.1
County: FRANKLIN
Depth: 76 ft

Relief: 20 ft [1]
Tides & Solunars
76 ft 29° 34' 21" N 84° 32' 12" W
Yamaha Reef - Yamaha #1 195’ X 35’ X 15’ Steel Barge.
Date of Deployment: December 27 1993
Primary Material: BARGE STEEL
County: FRANKLIN
Depth: 85 ft

Relief: 15 ft [1]
Tides & Solunars
85 ft 29° 34' 25" N 84° 32' 16" W