Monroe County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad app (version 3.1+ on iOS version 16.4+) now also offers fishing coordinates, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Adolphus Busch Sr 210 Foot Freighter Formally The Ocean Alley Near Looe Key
Date of Deployment: December 5 1998
Primary Material: SHIP STEEL 210’
County: MONROE
Depth: 100 ft

Relief: 62 ft [1]
Tides & Solunars
100 ft 24° 31' 50" N 81° 27' 41" W
Alexander Barge 120 Foot By 40 Foot Steel Barge The Alexander Also Bridge Rubble
Date of Deployment: December 31 1984
Primary Material: BARGE STEEL 120’
County: MONROE
Depth: 95 ft

Relief: 15 ft [1]
Tides & Solunars
95 ft 24° 51' 42" N 80° 34' 6" W
Alva Chapman Reef Two Concrete Boat Hulls And Dredge Pipe
Date of Deployment: December 31 1978
Primary Material: SHIP CONCRETE
County: MONROE
Depth: 220 ft
[1]
Tides & Solunars
220 ft 25° 17' 40" N 80° 9' 6" W
American Shoal Reef #1 Niles Channel Bridge Rubble4 Large Patches
Date of Deployment: April 30 1983
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 600
County: MONROE
Depth: 40 ft

Relief: 8 ft [1]
Tides & Solunars
40 ft 24° 33' 7" N 81° 27' 55" W
American Shoal Reef #2 Niles Channel Bridge Rubble4 Large Patches
Date of Deployment: September 30 1985
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 1200
County: MONROE
Depth: 38 ft

Relief: 11 ft [1]
Tides & Solunars
38 ft 24° 33' 5" N 81° 28' 0" W
American Shoal Reef #3 Kemp Channel Bridge Rubble
Date of Deployment: September 30 1987
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 2400
County: MONROE
Depth: 42 ft

Relief: 10 ft [1]
Tides & Solunars
42 ft 24° 33' 7" N 81° 28' 1" W
Bahia Honda Reef - Site 1 1987 3600 Tons Spanish Harbor Bridge Spans
Date of Deployment: December 31 1987
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 3600
County: MONROE
Depth: 32 ft
[1]
Tides & Solunars
32 ft 24° 35' 45" N 81° 17' 27" W
Bahia Honda Reef - Site 2 1985 3000 Tons Bridge Rubble
Date of Deployment: December 31 1985
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 3000
County: MONROE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 24° 35' 45" N 81° 17' 23" W
Bibb 327 Foot Uscg Cutter Bibb Laying On Starboard Side 95’ To Rail
Date of Deployment: November 27 1987
Primary Material: SHIP STEEL 327’ (BIBB)
County: MONROE
Depth: 130 ft

Relief: 35 ft [1]
Tides & Solunars
130 ft 24° 59' 43" N 80° 22' 46" W
Big Pine Key Site Precast Concrete Shallow Reef Modules With Pvc.
Date of Deployment: September 13 1988
Primary Material: MODULES CONCRETE A-FRAMES
County: MONROE
Depth: 18 ft
[1]
Tides & Solunars
18 ft 24° 33' 1" N 81° 19' 30" W
Big Pine Reef Deployed In 1988 Research Modules High Profile
Date of Deployment: June 25 1988
Primary Material: MODULES CONCRETE A-FRAMES
County: MONROE
Depth: 80 ft
[1]
Tides & Solunars
80 ft 24° 32' 31" N 81° 19' 25" W
Big Pine Reef Deployed In 1988 Research Modules High Profile
Date of Deployment: June 25 1988
Primary Material: MODULES CONCRETE A-FRAMES
County: MONROE
Depth: 45 ft
[1]
Tides & Solunars
45 ft 24° 32' 42" N 81° 19' 32" W
Big Pine Reef Deployed In 1988 Research Modules Low Profile
Date of Deployment: June 27 1988
Primary Material: MODULES CONCRETE A-FRAMES
County: MONROE
Depth: 25 ft
[1]
Tides & Solunars
25 ft 24° 33' 3" N 81° 19' 45" W
Cayman Salvage Master 187 Ft. Long Former Us Army Minelayer The Lt. Col. Ellery W. Niles
Date of Deployment: April 30 1985
Primary Material: SHIP STEEL 187’
County: MONROE
Depth: 92 ft
[1]
Tides & Solunars
92 ft 24° 27' 13" N 81° 45' 59" W
Davis Reef 4 Reefballs As Part Of A School Project 2Nd Deployment
Date of Deployment: May 31 2001
Primary Material: MODULES CONCRETE REEFBALLS (4)
County: MONROE [1]
Tides & Solunars
24° 55' 24" N 80° 30' 32" W
Davis Reef 6 Reefballs As Part Of A School Project 1Rst Deployment
Date of Deployment: May 23 2000
Primary Material: MODULES CONCRETE REEFBALLS (6)
County: MONROE [1]
Tides & Solunars
24° 55' 24" N 80° 30' 32" W
Duane 327 Foot Uscg Cutter Duane Upright Deck Is 90 Feet Deep
Date of Deployment: November 27 1987
Primary Material: SHIP STEEL 327’ (DUANE)
County: MONROE
Depth: 118 ft

Relief: 50 ft [1]
Tides & Solunars
118 ft 24° 59' 23" N 80° 22' 55" W
Eagle 287 Foot Freighter The Eagle Originally The Aaron K On Side
Date of Deployment: December 19 1985
Primary Material: SHIP STEEL 287’
County: MONROE
Depth: 110 ft

Relief: 40 ft [1]
Tides & Solunars
110 ft 24° 52' 11" N 80° 34' 13" W
Gunbor Reef Superstructure From The Cayman Salvage
Date of Deployment: December 31 1985
Primary Material: STEEL SCRAP
County: MONROE
Depth: 52 ft

Relief: 26 ft [1]
Tides & Solunars
52 ft 24° 56' 48" N 81° 46' 12" W
Islamorada Reef - Site 1 1981 Concrete Bridge Spans
Date of Deployment: December 31 1981
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 110 ft
[1]
Tides & Solunars
110 ft 24° 50' 18" N 80° 33' 25" W
Islamorada Reef - Site 2 1987 Lignum Vitae Bridge Spans
Date of Deployment: December 31 1987
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 50' 28" N 80° 33' 5" W
Islamorada Reef - Site 3 1984 120 Foot Barge And Bridge Spans
Date of Deployment: December 31 1984
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 110 ft
[1]
Tides & Solunars
110 ft 24° 50' 20" N 80° 33' 34" W
Islamorada Reef - Site 4 1986 Indian Cut Bridge Spans
Date of Deployment: December 31 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 50' 31" N 80° 33' 4" W
Islamorada Reef - Site 5 1986 Old Tea Table Bridge Spans
Date of Deployment: December 31 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 50' 28" N 80° 33' 5" W
Joe's Tug 90 Foot Long Tugboat
Date of Deployment: January 21 1989
Primary Material: SHIP STEEL TUGBOAT 90’
County: MONROE
Depth: 65 ft

Relief: 25 ft [1]
Tides & Solunars
65 ft 24° 27' 51" N 81° 44' 16" W
Key West Gulfside Reef - Site 1 Steel I-Beams And Rubble
Date of Deployment: September 30 1983
Primary Material: STEEL I-BEAMS
County: MONROE
Depth: 32 ft

Relief: 8 ft [1]
Tides & Solunars
32 ft 24° 41' 39" N 81° 52' 38" W
Key West Gulfside Reef - Site 2 Small Boats
Date of Deployment: December 31 1983
Primary Material: SHIP STEEL SMALL
County: MONROE
Depth: 32 ft

Relief: 4 ft [1]
Tides & Solunars
32 ft 24° 41' 26" N 81° 52' 37" W
Key West Gulfside Reef - Site 3 120 Foot Long Steel Barge
Date of Deployment: December 31 1983
Primary Material: BARGE STEEL 120’
County: MONROE
Depth: 32 ft

Relief: 10 ft [1]
Tides & Solunars
32 ft 24° 41' 16" N 81° 53' 38" W
Key West Gulfside Reef - Site 4 3000 Tons Of Concrete Rubble And Steel
Date of Deployment: January 31 1986
Primary Material: CONCRETE RUBBLE
Tonnage: 3000
County: MONROE
Depth: 32 ft
[1]
Tides & Solunars
32 ft 24° 41' 31" N 81° 52' 41" W
Key West Gulfside Reef - Site 5 100 Tons Of Concrete Rubble
Date of Deployment: June 30 1987
Primary Material: CONCRETE RUBBLE
County: MONROE
Depth: 32 ft
[1]
Tides & Solunars
32 ft 24° 41' 42" N 81° 52' 45" W
Key West Tournament Reef - Site 1 100 Feet Steel Barge The Lola
Date of Deployment: December 31 1983
Primary Material: BARGE STEEL 100’
County: MONROE
Depth: 184 ft

Relief: 14 ft [1]
Tides & Solunars
184 ft 24° 27' 15" N 81° 46' 15" W
Key West Tournament Reef - Site 2 260 Foot Ship L.S.M.R.
Date of Deployment: December 31 1983
Primary Material: SHIP STEEL 260’
County: MONROE
Depth: 180 ft

Relief: 21 ft [1]
Tides & Solunars
180 ft 24° 27' 15" N 81° 46' 15" W
Key West Tournament Reef - Site 3 Heavy Steel And Barge
Date of Deployment: December 31 1987
Primary Material: BARGE STEEL
County: MONROE
Depth: 205 ft

Relief: 6 ft [1]
Tides & Solunars
205 ft 24° 25' 40" N 81° 45' 35" W
Long Key Reef 1994Long Key Bridge 3746 Tons Bridge Gps
Date of Deployment: December 31 1994
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 3746
County: MONROE
Depth: 24 ft
[1]
Tides & Solunars
24 ft 24° 43' 54" N 80° 49' 40" W
Long Key Reef 1996 Long Key Bridge 3942 Tons Bridge
Date of Deployment: December 31 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 3942
County: MONROE
Depth: 24 ft
[1]
Tides & Solunars
24 ft 24° 43' 54" N 80° 49' 40" W
Long Key Reef - Site 0 Long Key Bridge Materials
Date of Deployment: December 31 1986
Primary Material: BRIDGE SLABS CONCRETE
County: MONROE
Depth: 26 ft

Relief: 8 ft [1]
Tides & Solunars
26 ft 24° 43' 53" N 80° 49' 50" W
Long Key Reef - Site 1 1986 Long Key Bridge5 Patch Reefs
Date of Deployment: April 30 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 26 ft
[1]
Tides & Solunars
26 ft 24° 43' 36" N 80° 49' 44" W
Long Key Reef - Site 2 1986 Long Key Bridge 5 Patch Reefs
Date of Deployment: December 31 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 26 ft
[1]
Tides & Solunars
26 ft 24° 43' 37" N 80° 49' 42" W
Long Key Reef - Site 3 1986 Long Key Bridge 9 Patch Reefs
Date of Deployment: August 31 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 26 ft
[1]
Tides & Solunars
26 ft 24° 43' 52" N 80° 49' 39" W
Long Key Reef - Site 4 1986 Long Key Bridge 5 Patch Reefs
Date of Deployment: September 30 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 26 ft
[1]
Tides & Solunars
26 ft 24° 44' 2" N 80° 49' 45" W
Long Key Reef - Site 5 1986 Long Key Bridge 5 Patch Reefs
Date of Deployment: December 31 1986
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 26 ft
[1]
Tides & Solunars
26 ft 24° 44' 1" N 80° 49' 35" W
Long Key Reef - Site 6 1987 Long Key Bridge 4 Patch Reefs
Date of Deployment: August 31 1987
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 26 ft
[1]
Tides & Solunars
26 ft 24° 44' 11" N 80° 49' 35" W
Long Key Viaduct 106 Reefballs To Date Boy Scout Reef Sea Base
Date of Deployment: May 23 2001
Primary Material: MODULES CONCRETE REEFBALLS (106)
County: MONROE
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 24° 45' 25" N 80° 49' 7" W
Marathon Reef 1982 Marathon’s Vaca Cut Bridge Spans
Date of Deployment: December 31 1982
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 38' 23" N 80° 57' 33" W
Marathon Reef 1987 Marathon Concrete Slabs
Date of Deployment: December 31 1987
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 38' 28" N 80° 57' 27" W
Marathon Reef Site Concrete Bridge Spans.
Date of Deployment: July 30 1987
Primary Material: BRIDGE RUBBLE
County: MONROE
Depth: 100 ft
[1]
Tides & Solunars
100 ft 24° 39' 3" N 80° 57' 47" W
Seven Mile Bridge Reef 1982 7 Mile Bridge Spans
Date of Deployment: December 31 1982
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 34' 58" N 81° 9' 35" W
Seven Mile Bridge Reef 1982 7 Mile Bridge Spans
Date of Deployment: December 31 1982
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 34' 59" N 81° 9' 29" W
Seven Mile Bridge Reef 1984 7 Mile Bridge And Steel Barge
Date of Deployment: December 31 1984
Primary Material: BRIDGE SPANS CONCRETE
County: MONROE
Depth: 115 ft
[1]
Tides & Solunars
115 ft 24° 35' 1" N 81° 9' 22" W
Seven Mile Bridge Reef 620 Tons Of Bridge Rubble From Old Seven Mile Bridge
Date of Deployment: December 31 1980
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 620
County: MONROE
Depth: 90 ft
[1]
Tides & Solunars
90 ft 24° 36' 20" N 81° 10' 0" W
Spiegel Grove 510 Feet Lsd Uss Spiegel Grovepushed On Side On 6/10/02
Date of Deployment: May 17 2002
Primary Material: SHIP STEEL 510’
Tonnage: 6880
County: MONROE
Depth: 135 ft

Relief: 84 ft [1]
Tides & Solunars
135 ft 25° 4' 0" N 80° 18' 39" W
Stargazer Reef Underwater Sculptures
Date of Deployment: December 31 1992
Primary Material: STEEL STRUCTURES
County: MONROE
Depth: 13 ft
[1]
Tides & Solunars
13 ft 24° 27' 18" N 81° 52' 0" W
Thunderbolt 188 Foot Long Navy Cable Vessel The Uss Thunderbolt
Date of Deployment: March 3 1986
Primary Material: SHIP STEEL 188’
County: MONROE
Depth: 118 ft

Relief: 60 ft [1]
Tides & Solunars
118 ft 24° 39' 29" N 80° 57' 54" W
Uss Curb 213 Ft. Navy Salvage Vessel The Uss Curb (Ars-21) Sunk By Navy Upr
Date of Deployment: November 24 1983
Primary Material: SHIP STEEL 300’
County: MONROE
Depth: 185 ft

Relief: 60 ft [1]
Tides & Solunars
185 ft 24° 26' 13" N 81° 46' 8" W
Uss Fred T Berry (Dd-858) 391 Ft. Fletcher Class Destroyer
Date of Deployment: May 14 1972
Primary Material: SHIP STEEL 391’
County: MONROE
Depth: 350 ft
[1]
Tides & Solunars
350 ft 24° 27' 32" N 81° 33' 13" W
Uss Kendrick (Dd-612) 448 Ft. Bristol Class Destroyer
Date of Deployment: March 2 1968
Primary Material: SHIP STEEL 448’
County: MONROE
Depth: 320 ft
[1]
Tides & Solunars
320 ft 24° 27' 36" N 81° 36' 4" W
Uss S-16Sub(Ss-121) 231 Ft S-3 Class Coastal Defense Submarine
Date of Deployment: August 3 1945
Primary Material: SHIP STEEL 231’
County: MONROE
Depth: 260 ft
[1]
Tides & Solunars
260 ft 24° 25' 12" N 80° 2' 24" W
Uss Saufley (Dd-465) 377 Ft. Fletcher Class Destroyer
Date of Deployment: February 20 1968
Primary Material: SHIP STEEL 337’
County: MONROE
Depth: 420 ft
[1]
Tides & Solunars
420 ft 24° 26' 57" N 81° 34' 58" W
Wilkes Barre -Stern Section 610 Foot Light Cruiser Uss Wilkes Barre (Cl-103) Stern Portion Sunk
Date of Deployment: May 12 1972
Primary Material: SHIP STEEL 610’
County: MONROE
Depth: 250 ft

Relief: 75 ft [1]
Tides & Solunars
250 ft 24° 29' 4" N 81° 33' 8" W
Wilkes Barre-Bow Section 610 Foot Cruiser Uss Wilkes Barre (Cl-103) Bow Section Sunk By Us Na
Date of Deployment: May 12 1972
Primary Material: SHIP STEEL 610’
Tonnage: 10000
County: MONROE
Depth: 250 ft

Relief: 75 ft [1]
Tides & Solunars
250 ft 24° 29' 6" N 81° 33' 12" W
Wolf Reef 3 Reefballs As Part Of A School Project
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE REEFBALLS (3)
County: MONROE [1]
Tides & Solunars
25° 1' 19" N 80° 23' 47" W