Gulf County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: | |
Waypoint Name Description Depth Latitude Longitude
Sandy Reef - 2 Bridge Spans 2 Nd Load Of 4
Date of Deployment: October 8 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 52" N 29° 39.873' N 29.66455 85° 41' 19" W 85° 41.311' W -85.68852
Sandy Reef - 3 Bridge Spans 3 Rd Load Of 4
Date of Deployment: October 13 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 51" N 29° 39.854' N 29.66423 85° 41' 18" W 85° 41.299' W -85.68832
Sandy Reef - 4 Bridge Spans 4 4Th Load Of 4
Date of Deployment: October 30 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 106
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 50" N 29° 39.83' N 29.66383 85° 41' 16" W 85° 41.269' W -85.68782
Sandy Reef - 1 Bridge Spans 1Rst Load Of 4
Date of Deployment: October 1 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 51" N 29° 39.843' N 29.66405 85° 41' 14" W 85° 41.234' W -85.68723
Sandy Reef Phase II - 1 1Rst Of 4 Deployments This Date192 Reef Balls Total Patch #1
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEF BALLS(48)
County: GULF
Depth: 100 ft

Relief: 4 ft [1]
Tides & Solunars
100 ft 29° 40' 0" N 29° 40.008' N 29.6668 85° 41' 13" W 85° 41.21' W -85.68683
Sandy Reef Phase II - 4 4Th Of 4 Deployments This Date Patch#4
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 48" N 29° 39.805' N 29.66342 85° 41' 10" W 85° 41.173' W -85.68622
Sandy Reef Phase II - 2 2Nd Of 4 Deployments This Date Patch#2
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 58" N 29° 39.962' N 29.66603 85° 41' 9" W 85° 41.157' W -85.68595
Sandy Reef Phase II - 3 3Rd Of 4 Deployments This Date Patch#3
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 55" N 29° 39.917' N 29.66528 85° 41' 8" W 85° 41.13' W -85.6855
Gateway Barge 70 Foot Barge Steel Tanks Tires And Boxcars
Date of Deployment: December 31 1988
Primary Material: BARGE STEEL 70’
County: GULF
Depth: 80 ft

Relief: 8 ft [1]
Tides & Solunars
80 ft 29° 50' 14" N 29° 50.23' N 29.83717 85° 34' 52" W 85° 34.86' W -85.581
Car Body Site Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 19 1999
Primary Material: CONCRETE CULVERTS (30)
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 20" N 29° 53.336' N 29.88893 85° 32' 58" W 85° 32.961' W -85.54935
Red Dove Reef Funded By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 53' 29" N 29° 53.481' N 29.89135 85° 32' 51" W 85° 32.847' W -85.54745
Car Body Site Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 19 1999
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 47" N 29° 53.777' N 29.89628 85° 32' 49" W 85° 32.815' W -85.54692
Mbara Barge Steel Hopper Barge 195’X30’x12’ With Steel Pipes Mbara Funded ,25000
Date of Deployment: June 19 2001
Primary Material: BARGE STEEL 195’
County: BAY
Depth: 71 ft

Relief: 12 ft [1]
Tides & Solunars
71 ft 29° 53' 9" N 29° 53.145' N 29.88575 85° 32' 48" W 85° 32.792' W -85.54653
Mbara Barge Addition 1 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 9" N 29° 53.145' N 29.88575 85° 32' 48" W 85° 32.792' W -85.54653
Car Body Site Ave. Center Of 21 Modules 21-Fish Havens (Fh) (Complex#2 Of 5)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(21)
Tonnage: 23
County: BAY
Depth: 65 ft

Relief: 5 ft [1]
Tides & Solunars
65 ft 29° 53' 26" N 29° 53.44' N 29.89067 85° 32' 41" W 85° 32.682' W -85.5447
Triggerfish Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 54' 1" N 29° 54.012' N 29.9002 85° 32' 38" W 85° 32.639' W -85.54398
Carbody 105 Reefballs Two Drop Dates Also 7/8/03
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS (105)
Tonnage: 364.84
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 29° 53' 38" N 29° 53.635' N 29.89392 85° 32' 38" W 85° 32.635' W -85.54392
Fish America Foundation Reef 100 Reefballs Funded By ,30000 Fish America Grant
Date of Deployment: February 12 2003
Primary Material: MODULES CONCRETE REEFBALLS (100)
Tonnage: 200
County: BAY
Depth: 67 ft

Relief: 8 ft [1]
Tides & Solunars
67 ft 29° 53' 38" N 29° 53.628' N 29.8938 85° 32' 38" W 85° 32.634' W -85.5439
Bobby Guilford Site Concrete Rubble Deployed In Two Trips This Day
Date of Deployment: August 9 2004
Primary Material: CONCRETE PILINGS
Tonnage: 412
County: BAY
Depth: 65 ft

Relief: 8 ft [1]
Tides & Solunars
65 ft 29° 53' 14" N 29° 53.235' N 29.88725 85° 32' 37" W 85° 32.62' W -85.54367
Mexico Beach Site - Kingfish 1 1St Of 11 Drops This Date Kingfish 3 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (3)
Tonnage: 6
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 3" N 29° 54.056' N 29.90093 85° 32' 37" W 85° 32.61' W -85.5435
Charles House Reef 5 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 9" N 29° 53.15' N 29.88583 85° 32' 36" W 85° 32.605' W -85.54342
Carbody 37 Goliath Reefballs 1 Of 2 Drop Dates Also 6/8/04
Date of Deployment: April 22 2004
Primary Material: MODULES CONCRETE REEFBALLS (37)
County: BAY
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 29° 53' 53" N 29° 53.884' N 29.89807 85° 32' 36" W 85° 32.6' W -85.54333
Carbody 38 Reefballs Two Drop Dates Also 4/22/04
Date of Deployment: June 8 2004
Primary Material: MODULES CONCRETE REEFBALLS (38)
County: BAY
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 29° 53' 52" N 29° 53.874' N 29.8979 85° 32' 34" W 85° 32.573' W -85.54288
Smurfit-Stone - #3 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 19 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 50" N 29° 53.829' N 29.89715 85° 32' 34" W 85° 32.56' W -85.54267
Smurfit-Stone - #2 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 18 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 14" N 29° 53.23' N 29.88717 85° 32' 26" W 85° 32.426' W -85.54043
Car Body Site Ave. Center Of 16 Modules Fish Haven Towers(Complex#3 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(16)
Tonnage: 30
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 39" N 29° 53.654' N 29.89423 85° 32' 23" W 85° 32.391' W -85.53985
Carbody-Mbara 4 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (4)
Tonnage: 4
County: BAY
Depth: 60 ft

Relief: 10 ft [1]
Tides & Solunars
60 ft 29° 54' 8" N 29° 54.139' N 29.90232 85° 32' 23" W 85° 32.39' W -85.53983
Car Body Site Center Of 12 Modules Fish Haven Tower Units (Complex# 4 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(12)
Tonnage: 23
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 54' 24" N 29° 54.401' N 29.90668 85° 32' 10" W 85° 32.17' W -85.53617
Blackfin Reef Blackfin Reef 10 Reefballs
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 60 ft

Relief: 3 ft [1]
Tides & Solunars
60 ft 29° 53' 6" N 29° 53.105' N 29.88508 85° 32' 6" W 85° 32.098' W -85.53497
Mexico Beach Site - #4 Split And Bundled Tires And Concrete 2 Loads Also 7/28/81
Date of Deployment: September 1 1981
Primary Material: TIRES
County: BAY
Depth: 54 ft
[1]
Tides & Solunars
54 ft 29° 54' 0" N 29° 54.001' N 29.90002 85° 32' 1" W 85° 32.01' W -85.5335
Smurfit-Stone - #4 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 18 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 53' 50" N 29° 53.826' N 29.8971 85° 32' 1" W 85° 32.01' W -85.5335
Carbody 95 Reefballs All In One Location
Date of Deployment: June 12 2002
Primary Material: MODULES CONCRETE REEFBALLS (95)
Tonnage: 183.6
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 29° 53' 47" N 29° 53.791' N 29.89652 85° 32' 1" W 85° 32.009' W -85.53348
Arizona Chemical Steel Heat Exchanger 4’ Diameter By 60’ Feet Long
Date of Deployment: May 30 2000
Primary Material: STEEL HEAT EXCHANGER
County: BAY
Depth: 66 ft

Relief: 4 ft [1]
Tides & Solunars
66 ft 29° 53' 21" N 29° 53.355' N 29.88925 85° 32' 0" W 85° 32.004' W -85.5334
Mexico Beach Site - #1 Scrap Steel And Tires
Date of Deployment: December 31 1979
Primary Material: STEEL SCRAP
County: GULF
Depth: 54 ft
[1]
Tides & Solunars
54 ft 29° 54' 4" N 29° 54.066' N 29.9011 85° 31' 60" W 85° 32' W -85.53333
Mexico Beach Site - #2 Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: GULF
Depth: 55 ft

Relief: 10 ft [1]
Tides & Solunars
55 ft 29° 54' 4" N 29° 54.066' N 29.9011 85° 31' 60" W 85° 32' W -85.53333
Mexico Beach Site - #3 Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: GULF
Depth: 55 ft

Relief: 10 ft [1]
Tides & Solunars
55 ft 29° 54' 0" N 29° 54.006' N 29.9001 85° 31' 60" W 85° 32' W -85.53333
Mexico Beach Site - Redfish 2 Nd Of 11 Drops This Date Redfish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 9" N 29° 53.158' N 29.88597 85° 31' 60" W 85° 31.994' W -85.53323
Mexico Beach Site - Hat #1 #17 H.Bridge3 Spans5/12/88Concrete Decks
Date of Deployment: May 12 1988
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 80
County: GULF [1]
Tides & Solunars
29° 53' 51" N 29° 53.853' N 29.89755 85° 31' 59" W 85° 31.989' W -85.53315
Mexico Beach Site - Snapper 11 4Th Of 11 Loads This Date Snapper Reef 10 Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 18" N 29° 53.298' N 29.8883 85° 31' 59" W 85° 31.981' W -85.53302
Mexico Beach Site - Spanish 3 Rd Of 11 Drops This Date Spanish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 53' 25" N 29° 53.422' N 29.89037 85° 31' 59" W 85° 31.978' W -85.53297
Mexico Beach Site - Bluefish 4 4Th Of 11 Drops This Date Bluefish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 33" N 29° 53.545' N 29.89242 85° 31' 59" W 85° 31.975' W -85.53292
Mexico Beach Site - Bonita 7 4Th Of 11 Drops This Date Bonita Reef 10 Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 11" N 29° 54.181' N 29.90302 85° 31' 58" W 85° 31.973' W -85.53288
Mexico Beach Site - Flounder 6 4Th Of 11 Drops This Date Flounder 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 3" N 29° 54.053' N 29.90088 85° 31' 57" W 85° 31.958' W -85.53263
Car Body Site 98 Large Reefballs In Two Stacks On Each Site Of Barge
Date of Deployment: June 14 2001
Primary Material: MODULES CONCRETE REEFBALLS (98)
Tonnage: 183.6
County: BAY
Depth: 54 ft

Relief: 8 ft [1]
Tides & Solunars
54 ft 29° 53' 53" N 29° 53.878' N 29.89797 85° 31' 47" W 85° 31.791' W -85.52985
Mexico Beach Site - #5 Bundled Tires 6Th Of 11 Loads This Grant
Date of Deployment: July 28 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
29° 54' 25" N 29° 54.414' N 29.9069 85° 31' 47" W 85° 31.787' W -85.52978
Smurfit-Stone - #6 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: October 25 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 26" N 29° 53.44' N 29.89067 85° 31' 44" W 85° 31.73' W -85.52883
Smurfit-Stone - #5 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: October 25 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 54' 9" N 29° 54.15' N 29.9025 85° 31' 39" W 85° 31.65' W -85.5275
Car Body Site Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(22)
Tonnage: 32
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 38" N 29° 53.633' N 29.89388 85° 31' 36" W 85° 31.599' W -85.52665
Virginia Reef - Site 2 Bridge Rubble-Concrete Boxes-And Steel Hoppers.
Date of Deployment: July 20 1993
Primary Material: BRIDGE RUBBLE
County: GULF
Depth: 66 ft

Relief: 15 ft [1]
Tides & Solunars
66 ft 29° 50' 33" N 29° 50.547' N 29.84245 85° 31' 31" W 85° 31.51' W -85.52517
Virginia Reef - Site 1 Boat Hulls-Metal Crates-And Concrete Rubble.
Date of Deployment: August 2 1991
Primary Material: SHIP FIBERGLASS BOAT HULL
County: GULF
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 50' 50" N 29° 50.839' N 29.84732 85° 31' 30" W 85° 31.504' W -85.52507
Hammerhead Reef Hammerhead Reefs 10 Reefballs
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 45 ft

Relief: 3 ft [1]
Tides & Solunars
45 ft 29° 53' 19" N 29° 53.309' N 29.88848 85° 31' 27" W 85° 31.453' W -85.52422
Unnamed Concrete Pipes And Junction Boxes 112 Pieces 1Rst Of 2 Loads This Gran
Date of Deployment: June 26 2001
Primary Material: CONCRETE PRECAST STRUCTURES (112)
Tonnage: 160.1
County: BAY
Depth: 52 ft

Relief: 8 ft [1]
Tides & Solunars
52 ft 29° 53' 42" N 29° 53.692' N 29.89487 85° 31' 17" W 85° 31.281' W -85.52135
Unnamed Concrete Pipes And Junction Boxes 112 Pieces 2Nd Of 2 Loads This Grant
Date of Deployment: June 28 2001
Primary Material: CONCRETE PRECAST STRUCTURES (117)
Tonnage: 190.1
County: BAY
Depth: 52 ft

Relief: 8 ft [1]
Tides & Solunars
52 ft 29° 53' 42" N 29° 53.692' N 29.89487 85° 31' 17" W 85° 31.281' W -85.52135
Captain Mike Neal's Reef#2 Funded By The Mexico Beach Artificial Reef Association
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Relief: 3 ft [1]
Tides & Solunars
29° 53' 55" N 29° 53.916' N 29.8986 85° 30' 42" W 85° 30.698' W -85.51163
Captain Mike Neal's Reef 31 Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 53' 57" N 29° 53.942' N 29.89903 85° 30' 39" W 85° 30.657' W -85.51095
Lst Port St. Joe 75 Foot Long Steel Lst
Date of Deployment: December 31 1993
Primary Material: SHIP STEEL LAST 75’
County: GULF
Depth: 90 ft

Relief: 10 ft [1]
Tides & Solunars
90 ft 29° 40' 25" N 29° 40.422' N 29.6737 85° 30' 38" W 85° 30.631' W -85.51052
C Of C Reef Concrete Rubble And Prefabricated Concrete
Date of Deployment: December 31 1964
Primary Material: CONCRETE RUBBLE
County: GULF
Depth: 40 ft
[1]
Tides & Solunars
40 ft 29° 49' 56" N 29° 49.926' N 29.8321 85° 29' 54" W 85° 29.9' W -85.49833
Jaycee Reef Concrete Rubble Car Bodies And Steel Containers
Date of Deployment: December 31 1987
Primary Material: CONCRETE RUBBLE
County: GULF
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 29° 50' 18" N 29° 50.297' N 29.83828 85° 29' 32" W 85° 29.538' W -85.4923
Jaycee Reef Concrete Rubble And Steel Containers.
Date of Deployment: March 1 1990
Primary Material: CONCRETE CULVERTS
County: GULF [1]
Tides & Solunars
29° 50' 25" N 29° 50.409' N 29.84015 85° 29' 25" W 85° 29.419' W -85.49032
Bell Shoal 2 Nd Of Two Drops Of Reefballs This Date
Date of Deployment: June 14 2000
Primary Material: MODULES CONCRETE REEFBALLS (36)
Tonnage: 108
County: BAY
Depth: 21 ft

Relief: 6 ft [1]
Tides & Solunars
21 ft 29° 54' 29" N 29° 54.486' N 29.9081 85° 28' 28" W 85° 28.461' W -85.47435
Phinizy Reef 4 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 25 ft

Relief: 6 ft [1]
Tides & Solunars
25 ft 29° 54' 9" N 29° 54.155' N 29.90258 85° 28' 26" W 85° 28.44' W -85.474
Brian Moeller Reef 2 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 29° 53' 57" N 29° 53.948' N 29.89913 85° 28' 16" W 85° 28.268' W -85.47113
Beanie And Hosehead Reef 3 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 23 ft

Relief: 6 ft [1]
Tides & Solunars
23 ft 29° 53' 50" N 29° 53.835' N 29.89725 85° 28' 9" W 85° 28.155' W -85.46925
Unnamed 30-40 Pieces Culverts/Boxes/Risers
Date of Deployment: December 10 1999
Primary Material: CONCRETE PRECAST STRUCTURES
County: BAY
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 54' 28" N 29° 54.474' N 29.9079 85° 27' 50" W 85° 27.839' W -85.46398
Captain Toms Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 20 ft
[1]
Tides & Solunars
20 ft 29° 54' 6" N 29° 54.096' N 29.9016 85° 27' 34" W 85° 27.569' W -85.45948
Barrier Dunes Barge 200 Foot Barge Wreck
Date of Deployment: December 31 1987
Primary Material: BARGE STEEL
County: GULF
Depth: 35 ft

Relief: 10 ft [1]
Tides & Solunars
35 ft 29° 45' 3" N 29° 45.058' N 29.75097 85° 25' 33" W 85° 25.544' W -85.42573
Inshore Mexico Bch - Cobia 9 4Th Of 11 Drops This Date Cobia 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 23" N 29° 54.387' N 29.90645 85° 24' 19" W 85° 24.317' W -85.40528
Inshore Mexico Bch - Amberjack 9 4Th Of 11 Drops This Date Amberjack 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 25" N 29° 54.418' N 29.90697 85° 24' 18" W 85° 24.293' W -85.40488
Inshore Mexico Bch - Grouper 10 4Th Of 11 Drops This Date Grouper 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 24" N 29° 54.394' N 29.90657 85° 24' 15" W 85° 24.243' W -85.40405