Charlote and Lee Counties
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: | |
Waypoint Name Description Depth Latitude Longitude
Pegasus Tugboat 110’Lx28’wx36’h Steel Tugboat Pegasus
Date of Deployment: July 9 1999
Primary Material: SHIP STEEL TUGBOAT (110’)
County: LEE
Depth: 85 ft

Relief: 36 ft [1]
Tides & Solunars
85 ft 26° 33' 8" N 26° 33.13' N 26.55217 82° 43' 25" W 82° 43.415' W -82.72358
Charlie's Reef Two Piles Of Hopper Cars-One With 16 Cars-The Other With 24.
Date of Deployment: January 25 1994
Primary Material: BOXCARS STEEL/HOPPER
County: LEE
Depth: 90 ft

Relief: 24 ft [1]
Tides & Solunars
90 ft 26° 33' 22" N 26° 33.373' N 26.55622 82° 43' 22" W 82° 43.367' W -82.72278
Boxcar Reef Csx Boxcars.
Date of Deployment: December 31 1987
Primary Material: BOXCARS
County: LEE
Depth: 72 ft
[1]
Tides & Solunars
72 ft 26° 41' 50" N 26° 41.83' N 26.69717 82° 36' 4" W 82° 36.063' W -82.60105
Palm Island Ferry Reef Steel Car Ferry 60X20x5’ Concrete Boxes And Pilings Also
Date of Deployment: March 12 1999
Primary Material: SHIP STEEL FERRY 60’
Tonnage: 35
County: CHARLOTTE
Depth: 55 ft

Relief: 5 ft [1]
Tides & Solunars
55 ft 26° 49' 14" N 26° 49.236' N 26.8206 82° 31' 57" W 82° 31.951' W -82.53252
Palm Island Barge Reef Steel Barge 70’Lx23’wx8’t And 30 Pieces Of Concrete And 1’ X 40’ Steel Spu
Date of Deployment: May 21 1999
Primary Material: BARGE STEEL 70’
Tonnage: 40
County: CHARLOTTE
Depth: 56 ft

Relief: 8 ft [1]
Tides & Solunars
56 ft 26° 49' 13" N 26° 49.221' N 26.82035 82° 31' 53" W 82° 31.879' W -82.53132
School Bus Reef - #2 - 2 50 Concrete Pilings Stacked In Square 16 Feet Tall 2Nd Of Two
Date of Deployment: June 8 1998
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 142
County: LEE
Depth: 68 ft

Relief: 16 ft [1]
Tides & Solunars
68 ft 26° 35' 58" N 26° 35.975' N 26.59958 82° 28' 21" W 82° 28.35' W -82.4725
School Bus Reef - #2 - 1 51 Concrete Pilings Stacked 16 Feet Tall
Date of Deployment: June 1 1998
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 142
County: LEE
Depth: 68 ft

Relief: 16 ft [1]
Tides & Solunars
68 ft 26° 36' 2" N 26° 36.037' N 26.60062 82° 28' 15" W 82° 28.25' W -82.47083
School Bus Reef - #1 Concrete Culverts 2/93Dgps
Date of Deployment: February 28 1993
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 64 ft
[1]
Tides & Solunars
64 ft 26° 36' 22" N 26° 36.37' N 26.60617 82° 28' 13" W 82° 28.221' W -82.47035
County M-13 Site Concrete Culverts Second Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 26° 55' 0" N 26° 55.003' N 26.91672 82° 28' 0" W 82° 28.001' W -82.46668
County M-13 Site Concrete Culverts Fifth Of 5 Drops 2 Loads 2 Drops This Date
Date of Deployment: June 28 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 232
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 26° 55' 1" N 26° 55.01' N 26.91683 82° 27' 58" W 82° 27.961' W -82.46602
County M-13 Site Concrete Culverts First Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: SARASOTA
Depth: 42 ft

Relief: 2 ft [1]
Tides & Solunars
42 ft 26° 55' 8" N 26° 55.134' N 26.9189 82° 27' 54" W 82° 27.9' W -82.465
County M-13 Site Concrete Culverts Third Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: SARASOTA
Depth: 42 ft

Relief: 2 ft [1]
Tides & Solunars
42 ft 26° 55' 7" N 26° 55.121' N 26.91868 82° 27' 54" W 82° 27.898' W -82.46497
County M-13 Site Concrete Culverts Fourth Of 5 Drops 2 Loads 2 Drops This Date
Date of Deployment: June 28 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: SARASOTA
Depth: 42 ft

Relief: 4 ft [1]
Tides & Solunars
42 ft 26° 55' 8" N 26° 55.131' N 26.91885 82° 27' 54" W 82° 27.892' W -82.46487
M-14 550 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment:
Primary Material: CONCRETE CULVERTS
County: SARASOTA
Depth: 43 ft

Relief: 5 ft [1]
Tides & Solunars
43 ft 26° 52' 14" N 26° 52.236' N 26.8706 82° 26' 26" W 82° 26.441' W -82.44068
Stump Pass 3 Mile Reef Concrete Culverts- 3 Dates Same Numbers
Date of Deployment: May 15 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 176
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 26° 52.256' N 26.87093 82° 26' 26" W 82° 26.434' W -82.44057
Stump Pass 3 Mile Reef Concrete Culverts- 3 Dates Same Numbers
Date of Deployment: May 19 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 196
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 26° 52.256' N 26.87093 82° 26' 26" W 82° 26.434' W -82.44057
Stump Pass 3 Mile Reef Concrete Culverts- 3 Datessame Numbers
Date of Deployment: May 21 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 175
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 26° 52.256' N 26.87093 82° 26' 26" W 82° 26.434' W -82.44057
M-14 550 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment: May 1 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 550
County: CHARLOTTE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 52' 16" N 26° 52.269' N 26.87115 82° 26' 26" W 82° 26.43' W -82.4405
Barge #1 Site Arcoa Bioreef-Prefabricated Units.
Date of Deployment: December 8 1993
Primary Material: MODULES PVC CONCRETE
County: LEE
Depth: 57 ft

Relief: 9 ft [1]
Tides & Solunars
57 ft 26° 32' 14" N 26° 32.235' N 26.53725 82° 25' 7" W 82° 25.111' W -82.41852
Arcoa Reef 96 Individual Modules 15000 Square Meters
Date of Deployment: December 8 1993
Primary Material: MODULES PVC CONCRETE
County: LEE
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 26° 32' 29" N 26° 32.487' N 26.54145 82° 25' 5" W 82° 25.08' W -82.418
Arcoa Reef Second Deployment Due To Structural Failures
Date of Deployment: December 20 1994
Primary Material: MODULES PVC CONCRETE
County: LEE
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 26° 32' 25" N 26° 32.415' N 26.54025 82° 24' 58" W 82° 24.972' W -82.4162
Sherman's Reef Barge Sherman’s Barge Dgps
Date of Deployment: December 31 1992
Primary Material: BARGE STEEL
County: LEE
Depth: 60 ft
[1]
Tides & Solunars
60 ft 26° 32' 53" N 26° 32.877' N 26.54795 82° 24' 56" W 82° 24.931' W -82.41552
Shirley D Shrimp Boat 48 Foot Long Steel Shrimp Boat
Date of Deployment: April 9 1997
Primary Material: SHIP STEEL 48
County: LEE
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 26° 32' 56" N 26° 32.939' N 26.54898 82° 24' 50" W 82° 24.836' W -82.41393
Arc Barge Site 24 Sets Of 6 Bundled Pipes And 6 Large 6’X4’x4’ Risers With Fence Enclos
Date of Deployment: June 9 1999
Primary Material: CONCRETE CULVERTS (24 SETS)
Tonnage: 209
County: LEE
Depth: 56 ft

Relief: 8 ft [1]
Tides & Solunars
56 ft 26° 24' 47" N 26° 24.785' N 26.41308 82° 24' 50" W 82° 24.826' W -82.41377
Arc '00 Reef 2 Nd Load Of 2 Loads 75 Pieces Of Concrete And Steel Power Poles
Date of Deployment: May 24 2000
Primary Material: CONCRETE PRECAST MATERIALS
Tonnage: 476.1
County: LEE
Depth: 58 ft

Relief: 15 ft [1]
Tides & Solunars
58 ft 26° 24' 56" N 26° 24.939' N 26.41565 82° 24' 49" W 82° 24.816' W -82.4136
Arc '00 Reef 1 1St Load Of 2 Loads 200-300 Pieces Of Concrete And Steel Power Poles
Date of Deployment: May 22 2000
Primary Material: CONCRETE PRECAST MATERIALS
Tonnage: 761.7
County: LEE
Depth: 58 ft

Relief: 15 ft [1]
Tides & Solunars
58 ft 26° 24' 56" N 26° 24.939' N 26.41565 82° 24' 49" W 82° 24.816' W -82.4136
Vixen Wreck 57 Foot Long X 14 Foot Wide Wood Vessel Called Vixen
Date of Deployment: February 1 1997
Primary Material: SHIP WOOD 57’
County: LEE
Depth: 60 ft

Relief: 20 ft [1]
Tides & Solunars
60 ft 26° 32' 50" N 26° 32.838' N 26.5473 82° 24' 48" W 82° 24.793' W -82.41322
Arc-Seaguard 60 Ft. Long Steel Hulled Sailboat Called The Seaguard
Date of Deployment: August 27 2004
Primary Material: SHIP STEEL 60’
County: LEE
Depth: 57 ft

Relief: 13 ft [1]
Tides & Solunars
57 ft 26° 24' 58" N 26° 24.963' N 26.41605 82° 24' 43" W 82° 24.719' W -82.41198
Arc Reef Arc Reef 100 Ft X 40 Ft Barge 1/94Dgps
Date of Deployment: January 26 1994
Primary Material: BARGE STEEL
County: LEE
Depth: 60 ft

Relief: 10 ft [1]
Tides & Solunars
60 ft 26° 24' 54" N 26° 24.905' N 26.41508 82° 24' 41" W 82° 24.691' W -82.41152
Arc Rubble 3Rd Of 5 Loads This Grant Concrete Culverts And Boxes
Date of Deployment: May 18 2001
Primary Material: CONCRETE PRECAST MATERIALS (110)
Tonnage: 425
County: LEE
Depth: 58 ft

Relief: 10 ft [1]
Tides & Solunars
58 ft 26° 24' 50" N 26° 24.83' N 26.41383 82° 24' 41" W 82° 24.684' W -82.4114
Arc-Reefballs 84 Reefballs Of Variuos Sizes
Date of Deployment: June 11 2004
Primary Material: MODULES CONCRETE REEFBALLS (84)
Tonnage: 108
County: LEE
Depth: 57 ft

Relief: 5 ft [1]
Tides & Solunars
57 ft 26° 24' 54" N 26° 24.898' N 26.41497 82° 24' 40" W 82° 24.672' W -82.4112
Arc Tet 1 Rst Of 5 Loads This Grant 5 To 6 Foot Solid Tetrahedrons
Date of Deployment: May 9 2001
Primary Material: MODULES CONCRETE TETRAHEDRONS (150)
Tonnage: 212
County: LEE
Depth: 58 ft

Relief: 10 ft [1]
Tides & Solunars
58 ft 26° 24' 52" N 26° 24.865' N 26.41442 82° 24' 38" W 82° 24.64' W -82.41067
Arc Towers Steel Radio Towers Cut Ot 25 Feet 3 Units
Date of Deployment: May 30 2002
Primary Material: STEEL TOWERS/RADIO (3)
Tonnage: 30
County: LEE
Depth: 58 ft

Relief: 25 ft [1]
Tides & Solunars
58 ft 26° 24' 58" N 26° 24.964' N 26.41607 82° 24' 38" W 82° 24.625' W -82.41042
Tremblay Reef - #1 Concrete Bridge Rubble 3 Deployments Same Numbers Also 5/7 And 5/22
Date of Deployment: May 28 2003
Primary Material: CONCRETE BRIDGE RUBBLE (60)
County: CHARLOTTE
Depth: 41 ft

Relief: 11 ft [1]
Tides & Solunars
41 ft 26° 48' 21" N 26° 48.35' N 26.80583 82° 22' 42" W 82° 22.7' W -82.37833
Tremblay Reef - Barge Steel Deck Barge 90 Ft X 23 Ft X 8 Ft
Date of Deployment: January 6 2005
Primary Material: BARGE STEEL 90’
County: CHARLOTTE
Depth: 42 ft

Relief: 8 ft [1]
Tides & Solunars
42 ft 26° 48' 25" N 26° 48.415' N 26.80692 82° 22' 39" W 82° 22.651' W -82.37752
Power Pole Reef Power Pole Barge And Crane8/92Gps
Date of Deployment: August 31 1992
Primary Material: BARGE STEEL
County: LEE
Depth: 45 ft
[1]
Tides & Solunars
45 ft 26° 40' 57" N 26° 40.957' N 26.68262 82° 22' 28" W 82° 22.47' W -82.3745
Englewood Fish Haven Bridge Rubble
Date of Deployment: December 31 1960
Primary Material: BRIDGE RUBBLE
County: CHARLOTTE
Depth: 22 ft
[1]
Tides & Solunars
22 ft 26° 54' 42" N 26° 54.7' N 26.91167 82° 21' 48" W 82° 21.8' W -82.36333
Novak Reef - Site 4 Concrete Bridge Rubble 4 Of 4 Deployments Fdot Funded
Date of Deployment: April 21 2003
Primary Material: CONCRETE BRIDGE SECTIONS (24)
Tonnage: 480
County: CHARLOTTE
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 26° 48' 34" N 26° 48.573' N 26.80955 82° 19' 42" W 82° 19.703' W -82.32838
Novak Reef - Site 3 Concrete Bridge Rubble 3 Of 4 Deployments Fdot Funded
Date of Deployment: April 18 2003
Primary Material: CONCRETE BRIDGE SECTIONS (22)
Tonnage: 464
County: CHARLOTTE
Depth: 30 ft

Relief: 7 ft [1]
Tides & Solunars
30 ft 26° 48' 34" N 26° 48.572' N 26.80953 82° 19' 42" W 82° 19.702' W -82.32837
Novak Reef - Site 2 Concrete Bridge Rubble 2 Of 4 Deployments Fdot Funded
Date of Deployment: April 16 2003
Primary Material: CONCRETE BRIDGE SECTIONS (24)
Tonnage: 464
County: CHARLOTTE
Depth: 30 ft

Relief: 6 ft [1]
Tides & Solunars
30 ft 26° 48' 34" N 26° 48.571' N 26.80952 82° 19' 42" W 82° 19.701' W -82.32835
Novak Reef - Site 1 Concrete Bridge Rubble 1 Of 4 Deployments Fdot Funded
Date of Deployment: April 14 2003
Primary Material: CONCRETE BRIDGE SECTIONS (18)
Tonnage: 360
County: CHARLOTTE
Depth: 29 ft

Relief: 7 ft [1]
Tides & Solunars
29 ft 26° 48' 34" N 26° 48.57' N 26.8095 82° 19' 42" W 82° 19.7' W -82.32833
Novak Reef - Site 4-6 Concrete Culverts Of Various Sizes 5 Of 8 Drops This Grant
Date of Deployment: July 13 2004
Primary Material: CONCRETE CULVERTS (115)
Tonnage: 110
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 36" N 26° 48.604' N 26.81007 82° 19' 39" W 82° 19.654' W -82.32757
Novak Reef - Site 4-7 Concrete Culverts Of Various Sizes 6 Of 8 Drops This Grant
Date of Deployment: July 14 2004
Primary Material: CONCRETE CULVERTS (151)
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 36" N 26° 48.604' N 26.81007 82° 19' 39" W 82° 19.654' W -82.32757
Novak Reef - Site 4-2 Concrete Culverts Of Various Sizes 3 Of 8 Drops This Grant
Date of Deployment: July 9 2004
Primary Material: CONCRETE CULVERTS (81)
Tonnage: 110
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 40" N 26° 48.671' N 26.81118 82° 19' 37" W 82° 19.62' W -82.327
Novak Reef - Site 4-3 Concrete Culverts Of Various Sizes 4 Of 8 Drops This Grant
Date of Deployment: July 12 2004
Primary Material: CONCRETE CULVERTS (88)
Tonnage: 100
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 41" N 26° 48.68' N 26.81133 82° 19' 36" W 82° 19.604' W -82.32673
Novak Reef - Site 4-1 Concrete Culverts Of Various Sizes 2 Of 8 Drops This Grant
Date of Deployment: July 8 2004
Primary Material: CONCRETE CULVERTS (140)
Tonnage: 116
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 30" N 26° 48.5' N 26.80833 82° 19' 32" W 82° 19.541' W -82.32568
Novak Reef - Site 4-4 Concrete Culverts Of Various Sizes 7 Of 8 Drops This Grant
Date of Deployment: July 15 2004
Primary Material: CONCRETE CULVERTS (151)
Tonnage: 111
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 39" N 26° 48.644' N 26.81073 82° 19' 32" W 82° 19.539' W -82.32565
Novak Reef - Site 4-5 Concrete Culverts Of Various Sizes 1 Of 8 Drops This Grant
Date of Deployment: July 7 2004
Primary Material: CONCRETE CULVERTS (107)
Tonnage: 101
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 39" N 26° 48.644' N 26.81073 82° 19' 32" W 82° 19.539' W -82.32565
Novak Reef - Site 4-8 Concrete Culverts Of Various Sizes 8 Of 8 Drops This Grant
Date of Deployment: July 16 2004
Primary Material: CONCRETE CULVERTS (140)
Tonnage: 111
County: CHARLOTTE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 48' 39" N 26° 48.644' N 26.81073 82° 19' 32" W 82° 19.539' W -82.32565
Blanda's Reef 45’ X 12’ X 8’ Ft. Steel Hulled Sailboat Hull
Date of Deployment: July 29 2003
Primary Material: SHIP STEEL SAILBOAT 45’
County: LEE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 25' 11" N 26° 25.185' N 26.41975 82° 19' 6" W 82° 19.1' W -82.31833
Blanda's Reef Rock 182 Tons Of 2 Ft - 5Ft Boulders In One Stack
Date of Deployment: June 24 2005
Primary Material: ROCK-LIMESTONE BOULDERS (200)
Tonnage: 182
County: LEE
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 26° 25' 19" N 26° 25.313' N 26.42188 82° 19' 5" W 82° 19.086' W -82.3181
Blanda's Reef Bridge Concrete Bridge Rubble Up To 25’X3’x3’ Smallest 3’X2’x2’
Date of Deployment: June 8 2005
Primary Material: BRIDGE RUBBLE
Tonnage: 373
County: LEE
Depth: 44 ft

Relief: 12 ft [1]
Tides & Solunars
44 ft 26° 25' 11" N 26° 25.189' N 26.41982 82° 19' 5" W 82° 19.075' W -82.31792
South Reef Seven Barge Loads Of 1’ To 6’ Limestone Boulders From 8/29/02
Date of Deployment: November 6 2002
Primary Material: ROCK-LIMESTONE BOULDERS
Tonnage: 1000
County: LEE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 25' 16" N 26° 25.266' N 26.4211 82° 19' 2" W 82° 19.038' W -82.3173
Mary's Reef 1 1St Of 3 Loads This Grant All On Same Location
Date of Deployment: June 13 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319.1
County: LEE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 46' 14" N 26° 46.239' N 26.77065 82° 18' 26" W 82° 18.43' W -82.30717
Mary's Reef 1 1St Of 3 Loads This Grant All On Same Location
Date of Deployment: June 16 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319.1
County: LEE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 46' 14" N 26° 46.239' N 26.77065 82° 18' 26" W 82° 18.43' W -82.30717
Mary's Reef 1 1St Of 3 Loads This Grant All On Same Location
Date of Deployment: June 19 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319.1
County: LEE
Depth: 30 ft

Relief: 13 ft [1]
Tides & Solunars
30 ft 26° 46' 14" N 26° 46.239' N 26.77065 82° 18' 26" W 82° 18.43' W -82.30717
Marys Reef Site #3 Concrete Culverts Of Various Sizes-Located
Date of Deployment: June 13 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319
County: CHARLOTTE
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 26° 46' 14" N 26° 46.239' N 26.77065 82° 18' 26" W 82° 18.43' W -82.30717
Marys Reef Site #3 Concrete Culverts Of Various Sizes-Located
Date of Deployment: June 16 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319
County: CHARLOTTE
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 26° 46' 14" N 26° 46.239' N 26.77065 82° 18' 26" W 82° 18.43' W -82.30717
Marys Reef Site #3 Concrete Culverts Of Various Sizes-Located
Date of Deployment: June 19 2000
Primary Material: CONCRETE CULVERTS
Tonnage: 319
County: CHARLOTTE
Depth: 29 ft

Relief: 5 ft [1]
Tides & Solunars
29 ft 26° 46' 14" N 26° 46.239' N 26.77065 82° 18' 26" W 82° 18.43' W -82.30717
Mary's Reef Mary’s Reef Concrete Culverts 1988 Dgps
Date of Deployment: December 31 1988
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 30 ft

Relief: 6 ft [1]
Tides & Solunars
30 ft 26° 46' 11" N 26° 46.176' N 26.7696 82° 18' 21" W 82° 18.353' W -82.30588
Helens Barges Two Steel Barges
Date of Deployment: June 21 2001
Primary Material: BARGE STEEL (60’)
County: LEE
Depth: 30 ft

Relief: 6 ft [1]
Tides & Solunars
30 ft 26° 37' 56" N 26° 37.933' N 26.63222 82° 17' 10" W 82° 17.161' W -82.28602
Helens Reef Helens Reef Concrete Poles 12/88Dgps
Date of Deployment: December 31 1988
Primary Material: CONCRETE POLES
County: LEE
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 26° 38' 1" N 26° 38.018' N 26.63363 82° 17' 5" W 82° 17.085' W -82.28475
Boca Grande Reef 667 Yards Of Concrete Pilings And Rubble
Date of Deployment: July 3 1981
Primary Material: CONCRETE PILINGS
County: CHARLOTTE [1]
Tides & Solunars
26° 38' 12" N 26° 38.2' N 26.63667 82° 17' 5" W 82° 17.083' W -82.28472
Pace Rub 1 4Th Of 5 Loads This Grant Concrete Culverts And Boxes
Date of Deployment: May 21 2001
Primary Material: CONCRETE PRECAST MATERIALS (100)
Tonnage: 318
County: LEE
Depth: 36 ft

Relief: 17 ft [1]
Tides & Solunars
36 ft 26° 31' 14" N 26° 31.239' N 26.52065 82° 17' 4" W 82° 17.064' W -82.2844
Wildmans Reef 80 Foot Concrete Sailboat
Date of Deployment: October 20 2004
Primary Material: SHIP CONCRETE SAILBOAT 50’
County: LEE
Depth: 36 ft

Relief: 16 ft [1]
Tides & Solunars
36 ft 26° 31' 11" N 26° 31.177' N 26.51962 82° 17' 3" W 82° 17.046' W -82.2841
Pace's Place #1- Big Rubble 10 Septic Tanks 8 Manhole Risers And 60 Tons Limestone In An East-Wes
Date of Deployment: February 29 2000
Primary Material: CONCRETE PRECAST MATERIALS
Tonnage: 180
County: LEE
Depth: 36 ft

Relief: 10 ft [1]
Tides & Solunars
36 ft 26° 31' 4" N 26° 31.07' N 26.51783 82° 17' 1" W 82° 17.01' W -82.2835
Pace Tet 2 Nd Of 5 Loads This Grant 5 To 6 Foot Solid Tetrahedrons
Date of Deployment: May 15 2001
Primary Material: MODULES CONCRETE TETRAHEDRONS (150)
Tonnage: 212
County: LEE
Depth: 36 ft

Relief: 14 ft [1]
Tides & Solunars
36 ft 26° 31' 15" N 26° 31.249' N 26.52082 82° 17' 0" W 82° 17.001' W -82.28335
Pace #10 78 Pieces Of Concrete Culverts About 8’X4’x5’
Date of Deployment: May 5 2006
Primary Material: CONCRETE CULVERTS (78)
Tonnage: 320
County: LEE
Depth: 35 ft

Relief: 8 ft [1]
Tides & Solunars
35 ft 26° 31' 13" N 26° 31.215' N 26.52025 82° 16' 59" W 82° 16.986' W -82.2831
Pace's Place Reef-Juvenile Habitats 28 Experimental Concrete And Steel Juvenile Fish Habitats
Date of Deployment: June 28 2005
Primary Material: CONCRETE JUVENILE FISH REFUGE HABIT
Tonnage: 8
County: LEE
Depth: 34 ft

Relief: 5 ft [1]
Tides & Solunars
34 ft 26° 31' 10" N 26° 31.171' N 26.51952 82° 16' 58" W 82° 16.968' W -82.2828
Pace's Place Barge Reef 110’ X 35’ X 9’ Steel Deck Barge And 75’ X 10’ X 8’ Crane/Boom
Date of Deployment: June 15 2000
Primary Material: BARGE STEEL DECK
County: LEE
Depth: 34 ft

Relief: 12 ft [1]
Tides & Solunars
34 ft 26° 31' 10" N 26° 31.169' N 26.51948 82° 16' 57" W 82° 16.952' W -82.28253
Pace Rub 2 5Th Of 5 Loads This Grant Concrete Culverts And Boxes
Date of Deployment: May 29 2001
Primary Material: CONCRETE PRECAST MATERIALS (100)
Tonnage: 318
County: LEE
Depth: 36 ft

Relief: 17 ft [1]
Tides & Solunars
36 ft 26° 31' 15" N 26° 31.249' N 26.52082 82° 16' 56" W 82° 16.94' W -82.28233
Pace #8 Limestone Added To Previous Materials 2 To 5 Foot Boulders.
Date of Deployment: April 25 2006
Primary Material: ROCK LIMESTONE
Tonnage: 444.5
County: LEE
Depth: 35 ft

Relief: 9 ft [1]
Tides & Solunars
35 ft 26° 31' 6" N 26° 31.0998' N 26.51833 82° 16' 54" W 82° 16.9002' W -82.28167
Redfish Pass Reef - #1 Steel Barge. About 50’X25’x9h
Date of Deployment: June 17 1989
Primary Material: BARGE STEEL
County: LEE
Depth: 24 ft
[1]
Tides & Solunars
24 ft 26° 33' 30" N 26° 33.499' N 26.55832 82° 14' 34" W 82° 14.568' W -82.2428
Redfish Pass Reef - #2 Steel Barge. About 50’X30’x9h
Date of Deployment: June 17 1989
Primary Material: BARGE STEEL
County: LEE
Depth: 26 ft

Relief: 10 ft [1]
Tides & Solunars
26 ft 26° 33' 39" N 26° 33.653' N 26.56088 82° 14' 12" W 82° 14.199' W -82.23665
Edison Reef #6 Edison Bridge #6 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 30" N 26° 18.5' N 26.30833 82° 13' 32" W 82° 13.53' W -82.2255
Edison Bridge 14000 Cubic Yards Of Rubble From Edison Bridge.
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE
County: LEE
Depth: 40 ft

Relief: 15 ft [1]
Tides & Solunars
40 ft 26° 18' 7" N 26° 18.11' N 26.30183 82° 13' 30" W 82° 13.505' W -82.22508
Edison Bridge Part Of Grant # C-7710
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE
County: LEE
Depth: 40 ft
[1]
Tides & Solunars
40 ft 26° 18' 24" N 26° 18.407' N 26.30678 82° 13' 28" W 82° 13.474' W -82.22457
Edison Reef #1 Edison Bridge #1 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 42" N 26° 18.7' N 26.31167 82° 13' 24" W 82° 13.4' W -82.22333
Edison Reef #2 Edison Bridge #2 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 37" N 26° 18.62' N 26.31033 82° 13' 19" W 82° 13.31' W -82.22183
Edison Reef #4 Edison Bridge #4 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 32" N 26° 18.541' N 26.30902 82° 13' 15" W 82° 13.25' W -82.22083
Edison Reef #8 Edison Bridge #8 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 24" N 26° 18.4' N 26.30667 82° 13' 12" W 82° 13.2' W -82.22
Edison Reef #3 Edison Bridge #3 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 35" N 26° 18.579' N 26.30965 82° 13' 8" W 82° 13.14' W -82.219
Edison Reef #5 Edison Bridge #5 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 31" N 26° 18.52' N 26.30867 82° 12' 59" W 82° 12.98' W -82.21633
Edison Reef #7 Edison Bridge #7 Sfara 5/98
Date of Deployment: March 1 1993
Primary Material: BRIDGE SPANS CONCRETE
County: LEE
Depth: 45 ft

Relief: 16 ft [1]
Tides & Solunars
45 ft 26° 18' 27" N 26° 18.45' N 26.3075 82° 12' 22" W 82° 12.36' W -82.206
Belton Johnson Reef - Site 7 25 Pieces Of Concrete Slabs Four Loads This Project
Date of Deployment: July 16 1997
Primary Material: CONCRETE SLABS
Tonnage: 75
County: LEE
Depth: 32 ft

Relief: 8 ft [1]
Tides & Solunars
32 ft 26° 25' 27" N 26° 25.454' N 26.42423 82° 12' 6" W 82° 12.092' W -82.20153
Belton Johnson Reef - Site 6 About 30 Pieces Of Flat Concrete In A Pile 2Nd Of Three Loads Dgps
Date of Deployment: July 9 1997
Primary Material: CONCRETE SLABS 30
Tonnage: 100
County: LEE
Depth: 32 ft

Relief: 8 ft [1]
Tides & Solunars
32 ft 26° 25' 33" N 26° 25.557' N 26.42595 82° 11' 49" W 82° 11.818' W -82.19697
Belton Johnson Reef - Site 4 About 25 Pieces Of Concrete Culverts Inpile1rst Of Three Loads Dgps
Date of Deployment: May 30 1997
Primary Material: CONCRETE RUBBLE 25
Tonnage: 100
County: LEE
Depth: 32 ft

Relief: 5 ft [1]
Tides & Solunars
32 ft 26° 25' 17" N 26° 25.288' N 26.42147 82° 11' 48" W 82° 11.805' W -82.19675
Belton Johnson Reef - Site 2 20 Pieces Of Concrete Slabs Four Loads This Project
Date of Deployment: May 10 1997
Primary Material: CONCRETE SLABS
Tonnage: 75
County: LEE
Depth: 32 ft

Relief: 5 ft [1]
Tides & Solunars
32 ft 26° 25' 24" N 26° 25.4' N 26.42333 82° 11' 47" W 82° 11.783' W -82.19638
Belton Johnson Reef - Site 1 500 Tons Of Concrete Culverts
Date of Deployment: May 16 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 500
County: LEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 26° 25' 29" N 26° 25.483' N 26.42472 82° 11' 42" W 82° 11.7' W -82.195
Belton Johnson Reef - Site 3 Pilings Stacked In Lincoln Log Shape-1 1St Of Two Loads Dgps
Date of Deployment: May 16 1997
Primary Material: CONCRETE PILINGS 42
Tonnage: 51
County: LEE
Depth: 32 ft

Relief: 14 ft [1]
Tides & Solunars
32 ft 26° 25' 19" N 26° 25.32' N 26.422 82° 11' 41" W 82° 11.68' W -82.19467
Belton Johnson Reef - Site 5 Pilings Stacked In Lincoln Log Shape-2Nd Of Two Loads Dgps
Date of Deployment: June 30 1997
Primary Material: CONCRETE PILINGS 44
Tonnage: 54
County: LEE
Depth: 32 ft

Relief: 14 ft [1]
Tides & Solunars
32 ft 26° 25' 21" N 26° 25.345' N 26.42242 82° 11' 40" W 82° 11.662' W -82.19437
Danger Reef On Starboard Side 40’ Long No Superstructure 50% Deteriorated
Date of Deployment: December 31 1988
Primary Material: SHIP STEEL CREWBOAT
County: CHARLOTTE
Depth: 12 ft

Relief: 6 ft [1]
Tides & Solunars
12 ft 26° 45' 33" N 26° 45.554' N 26.75923 82° 11' 10" W 82° 11.167' W -82.18612
Bokeelia Reef (B) 400 Cubic Yards Concrete Rubble And Boxes
Date of Deployment: December 31 1984
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 10 ft

Relief: 4 ft [1]
Tides & Solunars
10 ft 26° 43' 2" N 26° 43.038' N 26.7173 82° 9' 39" W 82° 9.642' W -82.1607
Cape Haze Reef(B) 3’ X 4’ And 2’ X 4’ Culverts 125 Pieces
Date of Deployment: February 26 2002
Primary Material: CONCRETE CULVERTS (125)
County: LEE
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 26° 45' 46" N 26° 45.761' N 26.76268 82° 9' 30" W 82° 9.494' W -82.15823
Cape Haze (B) Joint Project With Charlotte-,20000 Each Not An Fwc Grant
Date of Deployment: May 10 1995
Primary Material: MODULES STEEL UNITS
County: LEE
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 26° 45' 44" N 26° 45.729' N 26.76215 82° 9' 28" W 82° 9.466' W -82.15777
Cape Haze Reef (Bay) Only 5 Culvert Bundles Located No Steel Pipe Units-Not An Fwc Grant
Date of Deployment: May 10 1995
Primary Material: STEEL UNITS
County: CHARLOTTE
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 26° 45' 46" N 26° 45.769' N 26.76282 82° 9' 27" W 82° 9.446' W -82.15743
E-F (Jaycees) Reef 300 Tons Of Precast Concrete.
Date of Deployment: June 30 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 26° 20.149' N 26.33582 82° 5' 33" W 82° 5.556' W -82.0926
Doc Kline Lincolin Logs 2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’
Date of Deployment: September 5 2000
Primary Material: CONCRETE PILINGS
County: LEE
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 26° 20' 21" N 26° 20.349' N 26.33915 82° 5' 24" W 82° 5.392' W -82.08987
E-F (Jaycees) Reef 225 Tons Of Concrete Culverts.
Date of Deployment: June 7 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 225
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 26° 20.148' N 26.3358 82° 5' 21" W 82° 5.352' W -82.0892
E-F (Jaycees) Reef 310 Tons Of Concrete Culverts.
Date of Deployment: June 30 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 310
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 5" N 26° 20.078' N 26.33463 82° 5' 21" W 82° 5.348' W -82.08913
Charlotte Harbor Site A (Bay) 18 Pallet And 35 Bay Balls West Row Due South Of These Coordinates
Date of Deployment: December 2 1999
Primary Material: MODULES CONCRETE REEFBALLS (53)
Tonnage: 30
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 51' 30" N 26° 51.502' N 26.85837 82° 5' 19" W 82° 5.318' W -82.08863
Charlotte Harbor Reef (Bay) 1100 Tons Of Bridge Rubble Beams
Date of Deployment: December 31 1983
Primary Material: BRIDGE CONCRETE
Tonnage: 1100
County: CHARLOTTE
Depth: 12 ft
[1]
Tides & Solunars
12 ft 26° 50' 30" N 26° 50.5' N 26.84167 82° 5' 19" W 82° 5.317' W -82.08862
Charlotte Harbor Site (Bay) 1 Of 18 Deployments To 6/28/97 This Location And Grant (Materials North
Date of Deployment: June 15 1987
Primary Material: CONCRETE CULVERTS
Tonnage: 1115
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 30" N 26° 50.5' N 26.84167 82° 5' 19" W 82° 5.317' W -82.08862
Charlotte Harbor Site A (Bay) 18 Pallet And 35 Bay Balls West Row Due South Of These Coordinates
Date of Deployment: May 7 1999
Primary Material: MODULES CONCRETE REEFBALLS (53)
Tonnage: 21
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 59" N 26° 50.989' N 26.84982 82° 5' 19" W 82° 5.317' W -82.08862
Charlotte Harbour #1 (Bay) 1 Of 7 Deployments This Location This Grant To 5/9/91 (North Of Co
Date of Deployment: March 1 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 228
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 39" N 26° 50.65' N 26.84417 82° 5' 19" W 82° 5.317' W -82.08862
Charlotte Harbor Site B (Bay) 17 Pallet And 35 Bay Balls East Row Due South Of These Coordinates
Date of Deployment: May 7 1999
Primary Material: MODULES CONCRETE REEFBALLS (52)
Tonnage: 21
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 50' 59" N 26° 50.989' N 26.84982 82° 5' 18" W 82° 5.296' W -82.08827
Charlotte Harbor Site B (Bay) 17 Pallet And 35 Bay Balls East Row Due South Of These Coordinates
Date of Deployment: December 2 1999
Primary Material: MODULES CONCRETE REEFBALLS (52)
Tonnage: 30
County: CHARLOTTE
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 26° 51' 30" N 26° 51.502' N 26.85837 82° 5' 18" W 82° 5.296' W -82.08827
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 26 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 26° 20.282' N 26.33803 82° 5' 7" W 82° 5.121' W -82.08535
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 25 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 26° 20.282' N 26.33803 82° 5' 7" W 82° 5.121' W -82.08535
Evan Thompson Reef Units Five 7’ X 7’ Slabs With Two Culverts Each
Date of Deployment: May 27 2000
Primary Material: CONCRETE CULVERTS (10)
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 26° 20.282' N 26.33803 82° 5' 7" W 82° 5.121' W -82.08535
Sanibel Reef Sanibel Concrete Rubble 6/88450Yddgps
Date of Deployment: June 30 1988
Primary Material: CONCRETE RUBBLE
County: LEE
Depth: 20 ft
[1]
Tides & Solunars
20 ft 26° 24' 57" N 26° 24.943' N 26.41572 82° 3' 10" W 82° 3.16' W -82.05267
Causeway Reef #1 135- 30X30 Up To 15’ Long Concrete Piling Cutoffs 1 Of 6 Drops
Date of Deployment: September 16 2005
Primary Material: CONCRETE PILINGS - CUTOFFS (135)
Tonnage: 652
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 57" N 26° 22.9488' N 26.38248 82° 1' 9" W 82° 1.1472' W -82.01912
Causeway Reef #7 85- 30X30 Up To 25’ Long Concrete Piling Cutoffs 6 Of 6 Drops
Date of Deployment: June 9 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (85)
Tonnage: 348
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 56" N 26° 22.9368' N 26.38228 82° 1' 9" W 82° 1.1442' W -82.01907
Causeway Reef #5 70- 30X30 Up To 25’ Long Concrete Piling Cutoffs 5 Of 6 Drops
Date of Deployment: May 9 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (70)
Tonnage: 266
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 56" N 26° 22.9302' N 26.38217 82° 1' 9" W 82° 1.1418' W -82.01903
Causeway Reef #6 75- 30X30 Up To 25’ Long Concrete Piling Cutoffs
Date of Deployment: May 23 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (75)
Tonnage: 348
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 58" N 26° 22.968' N 26.3828 82° 1' 8" W 82° 1.1298' W -82.01883
Causeway Reef #8 85- 30X30 Up To 25’ Long Concrete Piling Cutoffs
Date of Deployment: September 6 2206
Primary Material: CONCRETE PILINGS - CUTOFFS (80)
Tonnage: 300
County: LEE
Depth: 26 ft

Relief: 8 ft [1]
Tides & Solunars
26 ft 26° 22' 54" N 26° 22.9008' N 26.38168 82° 1' 8" W 82° 1.125' W -82.01875
Causeway Reef #3 80- 30X30 Up To 15’ Long Concrete Piling Cutoffs 3 Of 6 Drops
Date of Deployment: February 21 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (70)
Tonnage: 423
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 59" N 26° 22.98' N 26.383 82° 1' 7" W 82° 1.11' W -82.0185
Causeway Reef #4 80- 30X30 Up To 15’ Long Concrete Piling Cutoffs 4 Of 6 Drops
Date of Deployment: March 31 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (80)
Tonnage: 490
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 57" N 26° 22.9548' N 26.38258 82° 1' 6" W 82° 1.0998' W -82.01833
Causeway Reef #2 75- 30X30 Up To 15’ Long Concrete Piling Cutoffs 2 Of 6 Drops
Date of Deployment: February 14 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (75)
Tonnage: 604.5
County: LEE
Depth: 26 ft

Relief: 7 ft [1]
Tides & Solunars
26 ft 26° 22' 56" N 26° 22.9338' N 26.38223 82° 1' 5" W 82° 1.0872' W -82.01812
Causeway Reef #9 70- 30X30 Up To 25’ Long Concrete Piling Cutoffs
Date of Deployment: September 11 2006
Primary Material: CONCRETE PILINGS - CUTOFFS (70)
Tonnage: 200
County: LEE
Depth: 26 ft

Relief: 6 ft [1]
Tides & Solunars
26 ft 26° 22' 59" N 26° 22.98' N 26.383 82° 1' 5" W 82° 1.0818' W -82.01803
G-H Reef Limestone Added To Previous Materials.
Date of Deployment: May 7 1994
Primary Material: ROCK LIMESTONE
Tonnage: 510
County: LEE
Depth: 28 ft

Relief: 6 ft [1]
Tides & Solunars
28 ft 26° 20' 39" N 26° 20.656' N 26.34427 81° 57' 31" W 81° 57.518' W -81.95863
G-H Reef 110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters.
Date of Deployment: August 1 1984
Primary Material: BARGE STEEL
County: LEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 26° 20' 35" N 26° 20.591' N 26.34318 81° 57' 14" W 81° 57.239' W -81.95398
G-H Reef Concrete Culverts 4.5 Miles From Big Carlos Pass
Date of Deployment: May 24 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 450
County: LEE
Depth: 28 ft
[1]
Tides & Solunars
28 ft 26° 20' 45" N 26° 20.743' N 26.34572 81° 57' 11" W 81° 57.19' W -81.95317
G-H Reef 8 Concrete And Screen Juvenile Habitats Large Diameter Vertical
Date of Deployment: December 14 1995
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 27 ft

Relief: 8 ft [1]
Tides & Solunars
27 ft 26° 20' 40" N 26° 20.67' N 26.3445 81° 56' 42" W 81° 56.698' W -81.94497
Wiggins Pass 5 Mile School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 29" N 26° 17.476' N 26.29127 81° 55' 49" W 81° 55.811' W -81.93018
Wiggins Pass 5 Mile School Buses Coke And Other Soft Drink Trucks.
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 28" N 26° 17.474' N 26.29123 81° 55' 48" W 81° 55.808' W -81.93013
M.A.Y. Reef May Reef Rubble 11/86Dgps
Date of Deployment: November 30 1986
Primary Material: CONCRETE RUBBLE
County: LEE
Depth: 20 ft
[1]
Tides & Solunars
20 ft 26° 22' 44" N 26° 22.731' N 26.37885 81° 55' 23" W 81° 55.383' W -81.92305
Wiggins Pass 4.5 Mile Reef Steel Barge And Crane
Date of Deployment: February 4 1987
Primary Material: BARGE STEEL
County: COLLIER
Depth: 31 ft

Relief: 5 ft [1]
Tides & Solunars
31 ft 26° 17' 28" N 26° 17.469' N 26.29115 81° 55' 10" W 81° 55.165' W -81.91942
May Reef - #1 Concrete Pieces (160) In Two Loads At Same Coordinates
Date of Deployment: March 23 1999
Primary Material: CONCRETE BOXES
County: LEE
Depth: 22 ft

Relief: 10 ft [1]
Tides & Solunars
22 ft 26° 22' 23" N 26° 22.377' N 26.37295 81° 55' 7" W 81° 55.112' W -81.91853
May Reef - #2 160 Pieces Concrete In Two Loads
Date of Deployment: March 19 1999
Primary Material: CONCRETE BOXES
County: LEE
Depth: 22 ft

Relief: 10 ft [1]
Tides & Solunars
22 ft 26° 22' 23" N 26° 22.377' N 26.37295 81° 55' 7" W 81° 55.112' W -81.91853
Lee-Collier Lee-Collierbusses10/87Dgps
Date of Deployment: October 31 1987
Primary Material: STEEL BUSES
County: LEE
Depth: 35 ft
[1]
Tides & Solunars
35 ft 26° 17' 26" N 26° 17.43' N 26.2905 81° 55' 3" W 81° 55.05' W -81.9175
On Shoreline Not A Fishing Site-Used To Stabilize Shoreline.
Date of Deployment: October 10 1986
Primary Material: ROCK RIP RAP
County: LEE [1]
Tides & Solunars
26° 38' 30" N 26° 38.5' N 26.64167 81° 52' 30" W 81° 52.5' W -81.875
Ft. Myers Wharf 4800 Tons Of Concrete Rubble And Rip Rap-Located About 50’ Offshore.
Date of Deployment: December 31 1985
Primary Material: CONCRETE RUBBLE
Tonnage: 4800
County: LEE [1]
Tides & Solunars
26° 38' 26" N 26° 38.429' N 26.64048 81° 52' 29" W 81° 52.482' W -81.8747
Rock Reef - #1 About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant
Date of Deployment: June 4 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 25" N 26° 18.412' N 26.30687 81° 52' 27" W 81° 52.456' W -81.87427
Wiggins Pass 3 Mile C And D Rubble And Culverts County Funded-,29379.00
Date of Deployment: October 1 2003
Primary Material: CONCRETE RUBBLE (600)
Tonnage: 652.8
County: COLLIER
Depth: 27 ft

Relief: 10 ft [1]
Tides & Solunars
27 ft 26° 18' 19" N 26° 18.324' N 26.3054 81° 52' 26" W 81° 52.426' W -81.87377
Rock Reef - #3 About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 27" N 26° 18.452' N 26.30753 81° 52' 23" W 81° 52.377' W -81.87295
Rock Reef - #2 About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant
Date of Deployment: June 9 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 5 ft [1]
Tides & Solunars
24 ft 26° 18' 17" N 26° 18.286' N 26.30477 81° 52' 23" W 81° 52.376' W -81.87293
Eca Reef Concrete Rubble And Steel I Beams ,10000 Funded By Eca
Date of Deployment: May 24 2001
Primary Material: CONCRETE RUBBLE (200)
Tonnage: 319.1
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 22" N 26° 18.369' N 26.30615 81° 52' 21" W 81° 52.354' W -81.87257
Rock Reef - #4 About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 20" N 26° 18.326' N 26.30543 81° 52' 17" W 81° 52.286' W -81.87143