St. Lucie County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: | |
Waypoint Name Description Depth Latitude Longitude
Ft. Pierce Fish Haven 600 Tons Of Concrete Culverts And Modules.
Date of Deployment: April 10 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 600
County: ST. LUCIE
Depth: 37 ft
[1]
Tides & Solunars
37 ft 27° 30' 36" N 27° 30.6' N 27.51 80° 16' 58" W 80° 16.97' W -80.28283
Ft Pierce Artificial Reef Metal Tanks-And Concrete Culverts And 15 Mixers.
Date of Deployment: November 30 1985
Primary Material: CEMENT MIXER BARRELS -15
County: ST. LUCIE
Depth: 186 ft

Relief: 20 ft [1]
Tides & Solunars
186 ft 27° 31' 13" N 27° 31.217' N 27.52028 80° 16' 55" W 80° 16.917' W -80.28195
Ft. Pierce Reef Site Concrete Tires And Rip/Rap Some Scrap Steel
Date of Deployment: November 29 1982
Primary Material: TIRE/CONCRETE UNITS
Tonnage: 500
County: ST. LUCIE
Depth: 35 ft
[1]
Tides & Solunars
35 ft 27° 31' 13" N 27° 31.217' N 27.52028 80° 16' 55" W 80° 16.917' W -80.28195
Two Bridges Reef 600 Tons Of Concrete Bridge Material.
Date of Deployment: May 23 1994
Primary Material: BRIDGE RUBBLE
Tonnage: 600
County: ST. LUCIE
Depth: 53 ft
[1]
Tides & Solunars
53 ft 27° 30' 27" N 27° 30.45' N 27.5075 80° 16' 34" W 80° 16.572' W -80.2762
Hutchinson Island Steel Tanks And Fiberglass Boat Hulls.
Date of Deployment: March 31 1988
Primary Material: STEEL TANKS
County: ST. LUCIE
Depth: 33 ft
[1]
Tides & Solunars
33 ft 27° 28' 52" N 27° 28.859' N 27.48098 80° 16' 28" W 80° 16.461' W -80.27435
Ft Pierce Fish Haven Concrete Culverts Bridge Rubble Tires Scrap Metal
Date of Deployment: December 31 1982
Primary Material: CONCRETE CULVERTS
County: ST. LUCIE
Depth: 34 ft

Relief: 5 ft [1]
Tides & Solunars
34 ft 27° 30' 32" N 27° 30.526' N 27.50877 80° 16' 27" W 80° 16.442' W -80.27403
Ft. Pierce Fish Haven 200 Tons Of Concrete Culverts.
Date of Deployment: June 18 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: ST. LUCIE
Depth: 37 ft
[1]
Tides & Solunars
37 ft 27° 29' 56" N 27° 29.925' N 27.49875 80° 16' 26" W 80° 16.432' W -80.27387
Ft. Pierce Artificial Reef 5 Barge Loads Each 25’ X 60’ On 5 Dates In June At Same Spot
Date of Deployment: June 16 1987
Primary Material: CONCRETE CULVERTS
County: ST. LUCIE [1]
Tides & Solunars
27° 28' 53" N 27° 28.89' N 27.4815 80° 16' 26" W 80° 16.43' W -80.27383
Wendy's Reef Concrete Culverts-Concrete Debris-And Prefabricated Structures.
Date of Deployment: November 24 1991
Primary Material: CONCRETE RUBBLE
County: ST. LUCIE [1]
Tides & Solunars
27° 29' 21" N 27° 29.35' N 27.48917 80° 16' 14" W 80° 16.23' W -80.2705
Bridge Spans Concrete Brdige Span And Support Section From New Martin Bridge Deploy
Date of Deployment: December 31 2001
Primary Material: BRIDGE SPAN SEGMENT (1)
Tonnage: 95
County: ST. LUCIE
Depth: 53 ft

Relief: 7 ft [1]
Tides & Solunars
53 ft 27° 26' 48" N 27° 26.8' N 27.44667 80° 10' 24" W 80° 10.4' W -80.17333
Fishing Club Reef Concrete Rubble
Date of Deployment: December 31 1988
Primary Material: CONCRETE RUBBLE
County: ST. LUCIE
Depth: 55 ft
[1]
Tides & Solunars
55 ft 27° 26' 48" N 27° 26.8' N 27.44667 80° 10' 24" W 80° 10.4' W -80.17333
Railroad Tie Reef #3 Various Piece Of Concrete Rubble And Steel Materials-2 Of 3 Drops Ths
Date of Deployment: September 30 2005
Primary Material: CONCRETE LIGHT POLES (23)
Tonnage: 343
County: ST. LUCIE
Depth: 55 ft

Relief: 20 ft [1]
Tides & Solunars
55 ft 27° 26' 41" N 27° 26.6868' N 27.44478 80° 10' 20" W 80° 10.3326' W -80.17221
Railroad Tie Reef #1 Concrete Railroad Ties-Two Locations
Date of Deployment: August 17 2005
Primary Material: CONCRETE RAILROAD TIES(1500)
Tonnage: 440.7
County: ST. LUCIE
Depth: 54 ft

Relief: 15 ft [1]
Tides & Solunars
54 ft 27° 26' 40" N 27° 26.6748' N 27.44458 80° 10' 18" W 80° 10.305' W -80.17175
Two Barges Reef 61’ X 31’ X 12’ Steel Barge.
Date of Deployment: January 19 1995
Primary Material: BARGE STEEL
County: ST. LUCIE
Depth: 42 ft

Relief: 12 ft [1]
Tides & Solunars
42 ft 27° 26' 39" N 27° 26.6502' N 27.44417 80° 10' 18" W 80° 10.3' W -80.17167
Ft. Pierce Fish Haven Steel Deck Barge 100’ X 40’ X 8 ’
Date of Deployment: June 28 1995
Primary Material: BARGE STEEL
County: ST. LUCIE
Depth: 51 ft

Relief: 8 ft [1]
Tides & Solunars
51 ft 27° 26' 39" N 27° 26.6508' N 27.44418 80° 10' 17" W 80° 10.2912' W -80.17152
Bridge Spans Concrete Brdige Span And Support Section From New Martin Bridge Deploy
Date of Deployment: December 31 2001
Primary Material: BRIDGE SPAN SEGMENT (1)
Tonnage: 95
County: ST. LUCIE
Depth: 53 ft

Relief: 6 ft [1]
Tides & Solunars
53 ft 27° 26' 38" N 27° 26.63' N 27.44383 80° 10' 15" W 80° 10.248' W -80.1708
Civic Center Reef #2 Civic Center Rubble Beams And Culverts
Date of Deployment: February 7 2007
Primary Material: CONCRETE RUBBLE AND PILES
Tonnage: 539
County: ST. LUCIE
Depth: 57 ft

Relief: 26 ft [1]
Tides & Solunars
57 ft 27° 26' 47" N 27° 26.7768' N 27.44628 80° 10' 14" W 80° 10.2288' W -80.17048
Civic Center Reef #1 Civic Center Rubble Beams
Date of Deployment: January 31 2007
Primary Material: CONCRETE RUBBLE AND PILES
Tonnage: 555
County: ST. LUCIE
Depth: 57 ft

Relief: 22 ft [1]
Tides & Solunars
57 ft 27° 26' 45" N 27° 26.7432' N 27.44572 80° 10' 13" W 80° 10.2138' W -80.17023
St Lucie Nearshore Site #06-04 Concrete Dock Piles 2’X2’’x20-30’ And Rubble 4 Of 4 Drops This Grant
Date of Deployment: May 11 2006
Primary Material: CONCRETE RUBBLE AND PILES
Tonnage: 523
County: ST. LUCIE
Depth: 56 ft

Relief: 9 ft [1]
Tides & Solunars
56 ft 27° 26' 45" N 27° 26.75' N 27.44583 80° 10' 12" W 80° 10.208' W -80.17013
Bridge Spans Concrete Brdige Span And Support Section From New Martin Bridge Deploy
Date of Deployment: December 31 2001
Primary Material: BRIDGE SPAN SEGMENT (1)
Tonnage: 95
County: ST. LUCIE
Depth: 53 ft

Relief: 6 ft [1]
Tides & Solunars
53 ft 27° 26' 38" N 27° 26.63' N 27.44383 80° 10' 11" W 80° 10.188' W -80.1698
St Lucie Nearshore Site #06-02 Concrete Dock Piles 2’X2’’x20-30’ 2 Of 4 Drops This Grant
Date of Deployment: May 6 2006
Primary Material: CONCRETE DOCK PILES
Tonnage: 473
County: ST. LUCIE
Depth: 57 ft

Relief: 8 ft [1]
Tides & Solunars
57 ft 27° 26' 38" N 27° 26.633' N 27.44388 80° 10' 6" W 80° 10.107' W -80.16845
St Lucie Nearshore Site #06-03 Concrete Dock Piles 2’X2’’x20-30’ And Rubble 3 Of 4 Drops This Grant
Date of Deployment: May 9 2006
Primary Material: CONCRETE RUBBLE AND PILES (200)
Tonnage: 515
County: ST. LUCIE
Depth: 57 ft

Relief: 9 ft [1]
Tides & Solunars
57 ft 27° 26' 32" N 27° 26.531' N 27.44218 80° 9' 56" W 80° 9.936' W -80.1656
St Lucie Nearshore Site #06-01 Concrete Dock Piles 2’X2’’x20-30’ 1 Of 4 Drops This Grant
Date of Deployment: May 4 2006
Primary Material: CONCRETE DOCK PILES (185)
Tonnage: 490
County: ST. LUCIE
Depth: 57 ft

Relief: 8 ft [1]
Tides & Solunars
57 ft 27° 26' 24" N 27° 26.402' N 27.44003 80° 9' 36" W 80° 9.601' W -80.16002
50' Inshore Reef - Steel Barge 110’ X28 X 7’ High Steel Barge.
Date of Deployment: August 30 1991
Primary Material: BARGE STEEL
County: ST. LUCIE
Depth: 53 ft

Relief: 7 ft [1]
Tides & Solunars
53 ft 27° 26' 12" N 27° 26.199' N 27.43665 80° 9' 21" W 80° 9.346' W -80.15577
50' Inshore Reef - Concrete Culverts 190 Tons Of Concrete Culverts.
Date of Deployment: June 21 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 190
County: ST. LUCIE
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 26' 12" N 27° 26.205' N 27.43675 80° 9' 20" W 80° 9.331' W -80.15552
Ft Pierce Artificial Reef 155’ Steel Tug Boat
Date of Deployment: October 6 1985
Primary Material: SHIP STEEL TUG 155’
County: ST. LUCIE
Depth: 186 ft

Relief: 20 ft [1]
Tides & Solunars
186 ft 27° 23' 48" N 27° 23.8' N 27.39667 80° 1' 60" W 80° 2' W -80.03333
Ken M Reef 71 Foot Long Harbor Tugboat The Ken M.
Date of Deployment: December 31 1992
Primary Material: SHIP STEEL TUGBOAT 71’
County: ST. LUCIE
Depth: 124 ft
[1]
Tides & Solunars
124 ft 27° 24' 27" N 27° 24.444' N 27.4074 80° 1' 17" W 80° 1.283' W -80.02138
Beverly M Reef 65’ Derelict Steel Tug Boat.
Date of Deployment: June 4 1987
Primary Material: SHIP STEEL TUG 65’
County: ST. LUCIE
Depth: 58 ft
[1]
Tides & Solunars
58 ft 27° 23' 33" N 27° 23.552' N 27.39253 80° 0' 35" W 80° 0.589' W -80.00982
Muliphen Reef Uss Muliphen (Aka-61) 459 Ft. Amphibious Attack Cargo Ship
Date of Deployment: January 21 1989
Primary Material: SHIP STEEL 459’ (USS MULIPHEN)
County: ST. LUCIE
Depth: 185 ft

Relief: 100 ft [1]
Tides & Solunars
185 ft 27° 24' 20" N 27° 24.331' N 27.40552 80° 0' 20" W 80° 0.337' W -80.00562
Stans Reef #1 150 Foot Oceangoing Tugboat
Date of Deployment: December 31 1987
Primary Material: SHIP STEEL TUGBOAT 150’
County: ST. LUCIE
Depth: 190 ft
[1]
Tides & Solunars
190 ft 27° 24' 20" N 27° 24.334' N 27.40557 79° 59' 41" W 79° 59.681' W -79.99468
Tug Reef Tug Boat
Date of Deployment:
Primary Material: SHIP STEEL TUGBOAT
County: ST. LUCIE
Depth: 212 ft
[1]
Tides & Solunars
212 ft 27° 24' 18" N 27° 24.292' N 27.40487 79° 59' 39" W 79° 59.648' W -79.99413