Nassau County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: | |
Waypoint Name Description Depth Latitude Longitude
Ba Site T. Maher On Site For Deployment
Date of Deployment: June 22 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 1000
County: NASSAU
Depth: 65 ft

Relief: 15 ft [1]
Tides & Solunars
65 ft 30° 42' 25" N 30° 42.418' N 30.70697 81° 3' 56" W 81° 3.934' W -81.06557
Ba Reef Site 2Nd Load Of Two Loads
Date of Deployment: June 21 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 500
County: NASSAU
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 30° 42' 2" N 30° 42.025' N 30.70042 81° 4' 47" W 81° 4.784' W -81.07973
Ba Reef 1-Rst Deployment
Date of Deployment: June 14 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 500
County: NASSAU
Depth: 64 ft

Relief: 6 ft [1]
Tides & Solunars
64 ft 30° 42' 1" N 30° 42.018' N 30.7003 81° 4' 34" W 81° 4.57' W -81.07617
Sahlmans Gulley Barge Barge
Date of Deployment: December 31 1973
Primary Material: BARGE STEEL
County: NASSAU
Depth: 60 ft
[1]
Tides & Solunars
60 ft 30° 40' 7" N 30° 40.116' N 30.6686 81° 9' 34" W 81° 9.56' W -81.15933
Fb-6 450 Tons Of Concrete Culverts-Manholes-And Junction Boxes.
Date of Deployment: June 9 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 450
County: NASSAU
Depth: 60 ft

Relief: 8 ft [1]
Tides & Solunars
60 ft 30° 39' 54" N 30° 39.906' N 30.6651 81° 11' 2" W 81° 11.036' W -81.18393
Whittaker's Snapper Hole Tug Steel Tugboat
Date of Deployment: December 31 1987
Primary Material: SHIP STEEL TUGBOAT
County: NASSAU
Depth: 60 ft
[1]
Tides & Solunars
60 ft 30° 39' 20" N 30° 39.338' N 30.65563 81° 13' 52" W 81° 13.874' W -81.23123
Whittaker's Snapper Hole Barge Barge Rubble Misc. Steel
Date of Deployment: December 31 1973
Primary Material: BARGE STEEL
County: NASSAU
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 38' 43" N 30° 38.719' N 30.64532 81° 12' 38" W 81° 12.641' W -81.21068
Whittaker's Snapper Hole 171 Tons Of Concrete Culverts-Building Rubble-Miscellaneous. Steel.
Date of Deployment: April 14 1987
Primary Material: CONCRETE CULVERTS
Tonnage: 170
County: NASSAU
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 38' 43" N 30° 38.712' N 30.6452 81° 12' 39" W 81° 12.648' W -81.2108
Fc Site Culverts 1991 1000 Tons Of Concrete Culverts (Fernandina Snapper Banks)
Date of Deployment: June 16 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 1000
County: NASSAU
Depth: 83 ft
[1]
Tides & Solunars
83 ft 30° 38' 43" N 30° 38.711' N 30.64518 81° 11' 15" W 81° 11.242' W -81.18737
Hh Site - Shark Barge 194 Ft Barge And Concrete Rubble (Ofmas-134)
Date of Deployment: December 31 1992
Primary Material: BARGE STEEL 194’
County: DUVAL
Depth: 77 ft

Relief: 10 ft [1]
Tides & Solunars
77 ft 30° 37' 41" N 30° 37.685' N 30.62808 81° 4' 43" W 81° 4.718' W -81.07863
Fc Site Culverts 1989 Concrete Culverts=1270 Pieces In Two Loads Also 6/20/89.
Date of Deployment: June 22 1989
Primary Material: CONCRETE CULVERTS
County: NASSAU
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 37' 2" N 30° 37.039' N 30.61732 81° 10' 41" W 81° 10.677' W -81.17795
Fernandina Banks- 89 Culverts Concrete Culverts
Date of Deployment: December 31 1989
Primary Material: CONCRETE CULVERTS
County: NASSAU
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 36' 35" N 30° 36.58' N 30.60967 81° 10' 35" W 81° 10.58' W -81.17633
Fernandina Banks- Barbett Wood Boat The Barbett
Date of Deployment: December 31 1975
Primary Material: SHIP WOOD
County: NASSAU
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 36' 35" N 30° 36.58' N 30.60967 81° 10' 35" W 81° 10.58' W -81.17633
Fc Site Culverts 1990 Concrete Culverts (Fernandina Snapper Banks)
Date of Deployment: June 10 1990
Primary Material: CONCRETE CULVERTS
Tonnage: 1000
County: NASSAU
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 36' 27" N 30° 36.447' N 30.60745 81° 11' 44" W 81° 11.725' W -81.19542
Fc Site 1988 Culverts 500 Tons Of Culverts(155 Pieces) Second Of Two Drops This Date
Date of Deployment: June 24 1988
Primary Material: CONCRETE CULVERTS (155)
Tonnage: 500
County: NASSAU
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 36' 17" N 30° 36.289' N 30.60482 81° 11' 24" W 81° 11.406' W -81.1901
Fc Site Culverts 1988 500 Tons Of Culverts (156 Pieces) First Of Two Loads This Date
Date of Deployment: June 24 1988
Primary Material: CONCRETE CULVERTS (156)
Tonnage: 500
County: NASSAU
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 36' 15" N 30° 36.254' N 30.60423 81° 11' 25" W 81° 11.412' W -81.1902
Captain Daddy (Cd-06-#02) 6 Fish Havens And A Cube Module 2 Of 2 Drops This Date
Date of Deployment: March 14 2006
Primary Material: MODULES CONCRETE TETRAHEDRONS (6)
County: NASSAU
Depth: 67 ft

Relief: 5 ft [1]
Tides & Solunars
67 ft 30° 35' 56" N 30° 35.925' N 30.59875 81° 15' 57" W 81° 15.9534' W -81.26589
HH Reef - Clumps of Concrete Distinct Clumps Of Concrete Culverts And Pillboxes.
Date of Deployment: October 30 1992
Primary Material: CONCRETE CULVERTS
County: DUVAL
Depth: 75 ft
[1]
Tides & Solunars
75 ft 30° 34' 41" N 30° 34.691' N 30.57818 81° 8' 29" W 81° 8.482' W -81.14137
HH Reef - Barge 190’ X 40’ Barge Sunk On Site With Steel I-Beams And Rubble On Board.
Date of Deployment: May 26 1994
Primary Material: BARGE STEEL 190’
Tonnage: 4200
County: DUVAL
Depth: 67 ft
[1]
Tides & Solunars
67 ft 30° 34' 31" N 30° 34.518' N 30.5753 81° 7' 55" W 81° 7.916' W -81.13193
Ah Site - Culverts Concrete Culverts About 100 Sq. Yards.
Date of Deployment: May 25 1986
Primary Material: CONCRETE CULVERTS
County: DUVAL
Depth: 80 ft
[1]
Tides & Solunars
80 ft 30° 33' 37" N 30° 33.62' N 30.56033 81° 3' 7" W 81° 3.12' W -81.052
Ah Site - Barge Steel Barge Ledge To The Nw
Date of Deployment: December 31 1978
Primary Material: BARGE STEEL
County: DUVAL
Depth: 80 ft
[1]
Tides & Solunars
80 ft 30° 32' 31" N 30° 32.51' N 30.54183 81° 3' 32" W 81° 3.54' W -81.059
Rl Site - Barge Steel Barge Deployment Unknown
Date of Deployment:
Primary Material: BARGE STEEL
County: DUVAL
Depth: 68 ft
[1]
Tides & Solunars
68 ft 30° 32' 4" N 30° 32.06' N 30.53433 81° 9' 43" W 81° 9.71' W -81.16183
Ah Site - Tug Monachan Tugboat Monachan Concrete Rubble Buckman Guardrail
Date of Deployment: December 31 1995
Primary Material: SHIP STEEL TUGBOAT
County: DUVAL
Depth: 80 ft
[1]
Tides & Solunars
80 ft 30° 28' 41" N 30° 28.69' N 30.47817 81° 4' 54" W 81° 4.9' W -81.08167
Ah Site - 95 Pillboxes Culverts And Pill Boxes
Date of Deployment: June 29 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 2100
County: DUVAL
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 28' 22" N 30° 28.36' N 30.47267 81° 6' 2" W 81° 6.03' W -81.1005
Ah Site - Pillboxes Concrete Pillboxes And Junction Boxes
Date of Deployment: December 31 1995
Primary Material: CONCRETE PILLBOXES
County: DUVAL
Depth: 80 ft
[1]
Tides & Solunars
80 ft 30° 28' 20" N 30° 28.33' N 30.47217 81° 6' 4" W 81° 6.06' W -81.101
Mr Site - Bills Barge Barge Steel Called Bills Barge
Date of Deployment: December 31 1975
Primary Material: BARGE STEEL
County: DUVAL
Depth: 61 ft
[1]
Tides & Solunars
61 ft 30° 27' 46" N 30° 27.76' N 30.46267 81° 14' 18" W 81° 14.3' W -81.23833
Mr Site - Barge 120 Foot Long Steel Barge
Date of Deployment:
Primary Material: BARGE STEEL
County: DUVAL
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 26' 52" N 30° 26.87' N 30.44783 81° 13' 28" W 81° 13.47' W -81.2245
Mr Site -East Barge Barge Steel Called East Barge
Date of Deployment: December 31 1985
Primary Material: BARGE STEEL
County: DUVAL
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 26' 43" N 30° 26.71' N 30.44517 81° 13' 16" W 81° 13.27' W -81.22117
Mr Site - 77 Culverts Concrete Culverts And Tanks Also 37.4/61.7
Date of Deployment: December 31 1977
Primary Material: CONCRETE CULVERTS
County: DUVAL
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 26' 38" N 30° 26.64' N 30.444 81° 13' 41" W 81° 13.69' W -81.22817
Mr Site - Tug Steel Tugboat
Date of Deployment:
Primary Material: SHIP STEEL TUGBOAT
County: DUVAL
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 26' 38" N 30° 26.637' N 30.44395 81° 13' 3" W 81° 13.054' W -81.21757
Montgomery Reef Fourth Of Four Loads This Grant First For Mr Reef
Date of Deployment: January 18 1983
Primary Material: CONCRETE CULVERTS (142)
County: DUVAL [1]
Tides & Solunars
30° 26' 34" N 30° 26.562' N 30.4427 81° 13' 13" W 81° 13.221' W -81.22035
Mr Site -Reliance 63 Foot Long Tugboat The Reliance
Date of Deployment: December 31 1985
Primary Material: SHIP STEEL TUGBOAT 63’
County: DUVAL
Depth: 68 ft
[1]
Tides & Solunars
68 ft 30° 26' 28" N 30° 26.46' N 30.441 81° 13' 16" W 81° 13.26' W -81.221
Mr Site Old Tugboat Not Confirmed
Date of Deployment:
Primary Material: SHIP STEEL TUGBOAT
County: DUVAL
Depth: 66 ft
[1]
Tides & Solunars
66 ft 30° 26' 13" N 30° 26.21' N 30.43683 81° 12' 59" W 81° 12.979' W -81.21632
Bb Site -Carpet Barge 2 Wrecks One Called The Carpet Barge
Date of Deployment:
Primary Material: BARGE STEEL
County: DUVAL
Depth: 48 ft
[1]
Tides & Solunars
48 ft 30° 26' 1" N 30° 26.02' N 30.43367 81° 10' 28" W 81° 10.47' W -81.1745
Bb Site - Culverts Precast Standard Precast Culverts Deployed In 1988 (Ofmas-134)
Date of Deployment: December 31 1988
Primary Material: CONCRETE CULVERTS
County: DUVAL
Depth: 71 ft

Relief: 6 ft [1]
Tides & Solunars
71 ft 30° 25' 59" N 30° 25.98' N 30.433 81° 8' 10" W 81° 8.16' W -81.136
Captain Daddy (Cd-06-#01) 5 Fish Haven A Concete Buoy Sinker And A Cube Module 1 Of 2 Drops Th
Relief (in feet): 4.5
Date of Deployment: March 14 2006
Primary Material: MODULES CONCRETE TETRAHEDRONS (5)
County: NASSAU
Depth: 67 ft
[1]
Tides & Solunars
67 ft 30° 25' 55" N 30° 25.92' N 30.432 81° 15' 57" W 81° 15.9534' W -81.26589
Bb Site - Wooden Tug Wooden Tugboat Wreck Unknown Age
Date of Deployment:
Primary Material: SHIP WOOD TUGBOAT
County: DUVAL
Depth: 54 ft
[1]
Tides & Solunars
54 ft 30° 25' 55" N 30° 25.91' N 30.43183 81° 8' 9" W 81° 8.15' W -81.13583
Bb Site - Bus Stop Barge Steel Barge
Date of Deployment: December 31 1994
Primary Material: BARGE STEEL
County: DUVAL
Depth: 65 ft

Relief: 8 ft [1]
Tides & Solunars
65 ft 30° 25' 53" N 30° 25.881' N 30.43135 81° 9' 3" W 81° 9.045' W -81.15075
Bb Site - Old Gibbs Drydock Old Gibbs Drydock
Date of Deployment:
Primary Material: STEEL DRYDOCK
County: DUVAL
Depth: 54 ft
[1]
Tides & Solunars
54 ft 30° 25' 52" N 30° 25.87' N 30.43117 81° 8' 20" W 81° 8.33' W -81.13883
Mr Site - Upside-Down Barge Steel Barge Called Gavin’s Upside-Down Barge
Date of Deployment: December 31 1959
Primary Material: BARGE STEEL
County: DUVAL
Depth: 65 ft
[1]
Tides & Solunars
65 ft 30° 25' 50" N 30° 25.83' N 30.4305 81° 13' 23" W 81° 13.39' W -81.22317