Collier County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see tide predictions and fishing times (solunar periods) by clicking the Tides & Fishing Times button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on this ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.| Coordinate Display Format: | | | ||||
|---|---|---|---|---|
| Waypoint Name | Description | Depth | Latitude | Longitude |
| Pavilion Key 6 Mile Reef - Site 1 |
Barge And Concrete Rubble Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: Primary Material: BARGE STEEL County: COLLIER Depth: 17 ft Relief: 8 ft [1] Tides & Fishing Times |
17 ft | 25° 40' 58" N | 81° 27' 49" W |
| Pavilion Key 6 Mile Reef - Site 2 |
Concrete Culverts And Rubble From Docks Date of Deployment: December 31 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 16 ft [1] Tides & Fishing Times |
16 ft | 25° 41' 11" N | 81° 28' 0" W |
| Pavilion Key 6 Mile Reef - Site 3 |
Lowered By Crane To The Bottom (Not Located 12/01) Date of Deployment: April 28 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 18 ft [1] Tides & Fishing Times |
18 ft | 25° 41' 18" N | 81° 28' 0" W |
| Caxambas Pass 2.5 Mile |
170 Tons Of Pilings 2Nd Of Two Loads (Not Found 12/01) Date of Deployment: May 28 1997 Primary Material: CONCRETE PILINGS Tonnage: 170 County: COLLIER Depth: 24 ft [1] Tides & Fishing Times |
24 ft | 25° 55' 55" N | 81° 45' 12" W |
| Marco Island 2 Mile - #4 |
Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: December 31 1972 Primary Material: STEEL PIPE County: COLLIER Depth: 21 ft Relief: 3 ft [1] Tides & Fishing Times |
21 ft | 25° 55' 24" N | 81° 45' 46" W |
| Marco Island 2 Mile - #5 |
Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: December 31 1972 Primary Material: CONCRETE RUBBLE County: COLLIER Depth: 21 ft Relief: 5 ft [1] Tides & Fishing Times |
21 ft | 25° 55' 24" N | 81° 45' 47" W |
| Caxambas Pass 2.5 Mile |
180 Tons Pipe And 160 Tons Pilings 20K Sq. Ft 1 Of 2 Loads (Not Foun Date of Deployment: May 22 1997 Primary Material: CONCRETE CULVERTS Tonnage: 340 County: COLLIER Depth: 24 ft [1] Tides & Fishing Times |
24 ft | 25° 55' 48" N | 81° 46' 0" W |
| Marco Island 2 Mile - #2 |
Concrete Culverts Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: May 30 1997 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 23 ft Relief: 5 ft [1] Tides & Fishing Times |
23 ft | 25° 55' 27" N | 81° 46' 13" W |
| Marco Island 2 Mile - #1 |
Concrete Culverts Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: May 30 1997 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 22 ft Relief: 5 ft [1] Tides & Fishing Times |
22 ft | 25° 55' 26" N | 81° 46' 14" W |
| Marco Island 2 Mile - #6 |
Concrete Rubble And Tires No Buoy Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: December 31 1972 Primary Material: CONCRETE RUBBLE County: COLLIER Depth: 23 ft Relief: 4 ft [1] Tides & Fishing Times |
23 ft | 25° 55' 26" N | 81° 46' 14" W |
| Marco Pass Reef Site |
6 Loads10/3-5-20/83 And 12/1-2-3/83 (Not Located 12/01) Date of Deployment: December 30 1983 Primary Material: CONCRETE CULVERTS Tonnage: 1435 County: COLLIER Depth: 22 ft [1] Tides & Fishing Times |
22 ft | 25° 55' 24" N | 81° 46' 15" W |
| Marco Island 2 Mile - #3 |
Concrete Culverts Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: May 30 1997 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 22 ft Relief: 5 ft [1] Tides & Fishing Times |
22 ft | 25° 55' 49" N | 81° 46' 58" W |
| Collier 5 Mile Reef |
1000 Yards Of Concrete Pilings (Curbs) 2Nd Of 3 Loads This Grant Date of Deployment: November 4 1980 Primary Material: CONCRETE PILINGS County: COLLIER Depth: 31 ft Relief: 6 ft [1] Tides & Fishing Times |
31 ft | 25° 51' 20" N | 81° 47' 37" W |
| Collier 5 Mile Reef |
800 Yards Of Concrete Pilings (Curbs) Confirmed By Rbf Grant Fwcc-01 Date of Deployment: November 8 1980 Primary Material: CONCRETE PILINGS County: COLLIER Depth: 31 ft Relief: 3 ft [1] Tides & Fishing Times |
31 ft | 25° 51' 50" N | 81° 47' 38" W |
| Marco Island 5 Mile Reef - #4 |
Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: December 31 1986 Primary Material: STEEL PIPE County: COLLIER Depth: 31 ft Relief: 4 ft [1] Tides & Fishing Times |
31 ft | 25° 51' 49" N | 81° 47' 39" W |
| Caxambas Pass 5.0 Mile |
Marco 5 Mile 1972 Concrete And Pipe (Not Located 12/01) Date of Deployment: December 31 1972 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 30 ft [1] Tides & Fishing Times |
30 ft | 25° 51' 47" N | 81° 47' 40" W |
| Collier 5 Mile Reef |
72X32x6 Ft Barge And 512Yds Of Pilings Confirmed By Rbf Grant Fwcc-0 Date of Deployment: October 29 1980 Primary Material: BARGE STEEL 72’ County: COLLIER Depth: 31 ft Relief: 6 ft [1] Tides & Fishing Times |
31 ft | 25° 51' 54" N | 81° 47' 47" W |
| Marco Island 5 Mile Reef - #6 |
Large Diameter Concrete Culverts Date of Deployment: June 1 1999 Primary Material: CONCRETE CULVERTS Tonnage: 200 County: COLLIER Depth: 32 ft Relief: 4 ft [1] Tides & Fishing Times |
32 ft | 25° 51' 54" N | 81° 47' 47" W |
| Marco Island 5 Mile Reef - #3 |
Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: December 31 1986 Primary Material: STEEL PIPE County: COLLIER Depth: 31 ft Relief: 4 ft [1] Tides & Fishing Times |
31 ft | 25° 51' 56" N | 81° 47' 49" W |
| Marco Island 5 Mile Reef - #2 |
Marco 5 Mile 1986 Dredge Pipe Date of Deployment: December 31 1986 Primary Material: STEEL PIPE County: COLLIER Depth: 30 ft Relief: 4 ft [1] Tides & Fishing Times |
30 ft | 25° 51' 47" N | 81° 47' 52" W |
| Marco Island 5 Mile Reef - #1 |
Marco 5 Mile Dredge Pipe Pontoons1986 Date of Deployment: December 31 1986 Primary Material: STEEL PIPE County: COLLIER Depth: 30 ft Relief: 4 ft [1] Tides & Fishing Times |
30 ft | 25° 51' 56" N | 81° 47' 52" W |
| Marco Island 5 Mile Reef - #5 |
Steel Barge Steel Pipe And Concrete Rubble Date of Deployment: December 31 1986 Primary Material: BARGE STEEL County: COLLIER Depth: 30 ft Relief: 7 ft [1] Tides & Fishing Times |
30 ft | 25° 51' 53" N | 81° 47' 58" W |
| Keewaydin 3 Mile - Site 1 |
Limestone Boulders -#1 Of 4 Patch Reefs This Day/Grant Date of Deployment: June 6 2002 Primary Material: ROCK LIMESTONE BOULDERS Tonnage: 147.9 County: COLLIER Depth: 27 ft Relief: 8 ft [1] Tides & Fishing Times |
27 ft | 26° 2' 2" N | 81° 49' 47" W |
| Keewaydin 3 Mile - C And D Reef 01 |
Rubble And Culverts County Funded Date of Deployment: June 19 2003 Primary Material: CONCREETE SLABS (100) Tonnage: 612 County: COLLIER Depth: 28 ft Relief: 10 ft [1] Tides & Fishing Times |
28 ft | 26° 2' 5" N | 81° 49' 51" W |
| Keewaydin 3 Mile - Site 2 |
Limestone Boulders -#2 Of 4 Patch Reefs This Day/Grant Date of Deployment: June 6 2002 Primary Material: ROCK LIMESTONE BOULDERS Tonnage: 147.9 County: COLLIER Depth: 27 ft Relief: 9 ft [1] Tides & Fishing Times |
27 ft | 26° 2' 7" N | 81° 49' 51" W |
| Keewaydin 3 Mile - C And D Reef 02 |
Rubble And Culverts County Funded Date of Deployment: June 24 2003 Primary Material: CONCRETE RUBBLE (150) Tonnage: 632 County: COLLIER Depth: 28 ft Relief: 10 ft [1] Tides & Fishing Times |
28 ft | 26° 2' 11" N | 81° 49' 52" W |
| Keewaydin 3 Mile - Site 3 |
Limestone Boulders -#3 Of 4 Patch Reefs This Day/Grant Date of Deployment: June 6 2002 Primary Material: ROCK LIMESTONE BOULDERS Tonnage: 147.9 County: COLLIER Depth: 27 ft Relief: 12 ft [1] Tides & Fishing Times |
27 ft | 26° 2' 10" N | 81° 49' 54" W |
| Keewaydin 3 Mile - Site 4 |
Limestone Boulders -#4 Of 4 Patch Reefs This Day/Grant Date of Deployment: June 6 2002 Primary Material: ROCK LIMESTONE BOULDERS Tonnage: 147.9 County: COLLIER Depth: 27 ft Relief: 11 ft [1] Tides & Fishing Times |
27 ft | 26° 2' 14" N | 81° 49' 58" W |
| Santa Lucia |
81 Ton Cement Boat Called The Santa Lucia Date of Deployment: April 30 1997 Primary Material: SHIP CEMENT Tonnage: 81 County: COLLIER Depth: 24 ft [1] Tides & Fishing Times |
24 ft | 26° 5' 23" N | 81° 50' 38" W |
| Naples Pier Reef |
Large Pile Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: June 17 1995 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 25 ft Relief: 6 ft [1] Tides & Fishing Times |
25 ft | 26° 8' 2" N | 81° 50' 39" W |
| Naples Pier Reef |
Widely Scattered Piles Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: June 17 1995 Primary Material: CONCRETE CULVERTS Tonnage: 250 County: COLLIER Depth: 22 ft Relief: 3 ft [1] Tides & Fishing Times |
22 ft | 26° 7' 49" N | 81° 50' 42" W |
| Clam Pass 3 Mile -02 |
Six Feet Across Concrete Slabs Pilings And Cutoffs (2 Of 2 Deploymen Date of Deployment: May 22 2000 Primary Material: CONCRETE RUBBLE (100) Tonnage: 392.6 County: COLLIER Depth: 25 ft Relief: 8 ft [1] Tides & Fishing Times |
25 ft | 26° 13' 23" N | 81° 52' 3" W |
| Clam Pass 3 Mile - Pile |
1800 Concrete Railroad Ties 8’X12X10 Date of Deployment: June 1 2001 Primary Material: CONCRETE RAILROAD TIES (1800) Tonnage: 591.7 County: COLLIER Depth: 26 ft Relief: 11 ft [1] Tides & Fishing Times |
26 ft | 26° 13' 34" N | 81° 52' 4" W |
| Clam Pass 3 Mile -01 |
Six Feet Across Concrete Slabs And Pilings (1 Of 2 Deployments) Date of Deployment: May 14 2000 Primary Material: CONCRETE RUBBLE (100) Tonnage: 345.8 County: COLLIER Depth: 25 ft Relief: 8 ft [1] Tides & Fishing Times |
25 ft | 26° 13' 34" N | 81° 52' 4" W |
| Clam Pass 3 Mile - 03 |
Concrete Manhole Risers And Covers ,20000 Funded By City Of Naples And C Date of Deployment: May 31 2001 Primary Material: CONCRETE MANHOLE RISERS (28) Tonnage: 358.5 County: COLLIER Depth: 25 ft Relief: 8 ft [1] Tides & Fishing Times |
25 ft | 26° 13' 35" N | 81° 52' 13" W |
| Clam Pass 3 Mile -C And D |
Rubble And Pilings County Funded ,25695 Date of Deployment: September 26 2003 Primary Material: CONCRETE RUBBLE (500) Tonnage: 571 County: COLLIER [1] Tides & Fishing Times |
26° 13' 27" N | 81° 52' 14" W | |
| Rock Reef - #4 |
About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant Date of Deployment: June 14 2004 Primary Material: ROCK LIMESTONE (65) Tonnage: 135 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Fishing Times |
24 ft | 26° 18' 20" N | 81° 52' 17" W |
| Eca Reef |
Concrete Rubble And Steel I Beams ,10000 Funded By Eca Date of Deployment: May 24 2001 Primary Material: CONCRETE RUBBLE (200) Tonnage: 319.1 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Fishing Times |
24 ft | 26° 18' 22" N | 81° 52' 21" W |
| Rock Reef - #2 |
About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant Date of Deployment: June 9 2004 Primary Material: ROCK LIMESTONE (130) Tonnage: 270 County: COLLIER Depth: 24 ft Relief: 5 ft [1] Tides & Fishing Times |
24 ft | 26° 18' 17" N | 81° 52' 23" W |
| Rock Reef - #3 |
About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant Date of Deployment: June 14 2004 Primary Material: ROCK LIMESTONE (65) Tonnage: 135 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Fishing Times |
24 ft | 26° 18' 27" N | 81° 52' 23" W |
| Wiggins Pass 3 Mile C And D |
Rubble And Culverts County Funded-,29379.00 Date of Deployment: October 1 2003 Primary Material: CONCRETE RUBBLE (600) Tonnage: 652.8 County: COLLIER Depth: 27 ft Relief: 10 ft [1] Tides & Fishing Times |
27 ft | 26° 18' 19" N | 81° 52' 26" W |
| Rock Reef - #1 |
About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant Date of Deployment: June 4 2004 Primary Material: ROCK LIMESTONE (130) Tonnage: 270 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Fishing Times |
24 ft | 26° 18' 25" N | 81° 52' 27" W |
| Gordon Pass 5 Mile Reef - #6 |
Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw Date of Deployment: July 22 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 28 ft Relief: 3 ft [1] Tides & Fishing Times |
28 ft | 26° 4' 54" N | 81° 53' 7" W |
| Gordon Pass 5 Mile Reef - #5 |
Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw Date of Deployment: July 22 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 28 ft Relief: 3 ft [1] Tides & Fishing Times |
28 ft | 26° 4' 54" N | 81° 53' 8" W |
| Gordon Pass 5 Mile Reef - #7 |
Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw Date of Deployment: July 22 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 28 ft Relief: 3 ft [1] Tides & Fishing Times |
28 ft | 26° 4' 54" N | 81° 53' 8" W |
| Gordon Pass 5 Mile Reef - #3 |
Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw Date of Deployment: July 22 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 28 ft Relief: 3 ft [1] Tides & Fishing Times |
28 ft | 26° 4' 53" N | 81° 53' 8" W |
| Gordon Pass 5 Mile Reef - #4 |
Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw Date of Deployment: July 22 1989 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 28 ft Relief: 3 ft [1] Tides & Fishing Times |
28 ft | 26° 4' 52" N | 81° 53' 9" W |
| Gordon Pass 5 Mile Reef - #10 |
Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: Primary Material: BRIDGE RUBBLE CONCRETE County: COLLIER Depth: 35 ft Relief: 5 ft [1] Tides & Fishing Times |
35 ft | 26° 5' 48" N | 81° 53' 18" W |
| Gordon Pass 5 Mile Reef - #9 |
Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100 Date of Deployment: March 1 1993 Primary Material: BRIDGE RUBBLE CONCRETE County: COLLIER Depth: 35 ft Relief: 4 ft [1] Tides & Fishing Times |
35 ft | 26° 5' 48" N | 81° 53' 19" W |
| Gordon Pass 5 Mile Reef - #1 |
1 Barge Of Square Shaped Power Poles Hollow Inside (Not Found 12/01) Date of Deployment: June 5 1996 Primary Material: CONCRETE PILINGS Tonnage: 680 County: COLLIER Depth: 26 ft Relief: 3 ft [1] Tides & Fishing Times |
26 ft | 26° 5' 9" N | 81° 53' 20" W |
| Gordon Pass 5 Mile Reef - #8 |
Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: Primary Material: BRIDGE RUBBLE CONCRETE County: COLLIER Depth: 35 ft Relief: 5 ft [1] Tides & Fishing Times |
35 ft | 26° 5' 47" N | 81° 53' 20" W |
| Gordon Pass 5 Mile Reef - #2 |
Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100 Date of Deployment: March 1 1993 Primary Material: STEEL RECTANGULAR TANKS County: COLLIER Depth: 35 ft Relief: 4 ft [1] Tides & Fishing Times |
35 ft | 26° 5' 47" N | 81° 53' 21" W |
| Gordon Pass 5 Mile Reef - #11 |
Dc3 Fuselage And Concrete Culverts (Not Located 12/01) Date of Deployment: December 7 1987 Primary Material: AIRPLANE DC3 County: COLLIER Depth: 25 ft [1] Tides & Fishing Times |
25 ft | 26° 5' 26" N | 81° 53' 42" W |
| Marco 9 Mile M9c |
6 Of 6 Drops This Grant 4 Of 4 This Date Date of Deployment: June 14 2003 Primary Material: CONCRETE CULVERTS AND BOXES (40) Tonnage: 142.8 County: COLLIER Depth: 39 ft Relief: 8 ft [1] Tides & Fishing Times |
39 ft | 25° 52' 58" N | 81° 54' 3" W |
| Memorial Reef Balls |
1 Ultra 6 Reefballs And 8 Pallet Balls As Memorial Reef Date of Deployment: August 6 2002 Primary Material: MODULES CONCRETE REEFBALLS (15) Tonnage: 3.7 County: COLLIER Depth: 39 ft Relief: 5 ft [1] Tides & Fishing Times |
39 ft | 25° 52' 47" N | 81° 54' 5" W |
| Marco Island 9 Mile Reef - #1 |
Concrete Bridge And Pilings ,15000 Funded By City Of Marco Is. (1 Of 2 Date of Deployment: June 5 2001 Primary Material: BRIDGE CONCRETE DECKING (11) Tonnage: 212.7 County: COLLIER Depth: 39 ft Relief: 5 ft [1] Tides & Fishing Times |
39 ft | 25° 52' 51" N | 81° 54' 9" W |
| Marco Island 9 Mile Reef - #2 |
Concrete Bridge Pilings And Rubble ,15000 Funded By City Of Marco Is. Date of Deployment: June 7 2001 Primary Material: BRIDGE CONCRETE DECKING (7) Tonnage: 239.4 County: COLLIER Depth: 39 ft Relief: 5 ft [1] Tides & Fishing Times |
39 ft | 25° 52' 51" N | 81° 54' 9" W |
| Marco 9 Mile M9b Richie Reef |
5 Of 6 Drops This Grant 3 Of 4 This Date Date of Deployment: June 14 2003 Primary Material: LIMESTONE BOULDERS (50) Tonnage: 122.4 County: COLLIER Depth: 39 ft Relief: 10 ft [1] Tides & Fishing Times |
39 ft | 25° 52' 58" N | 81° 54' 12" W |
| Doctor's Pass 5 Mile |
800 Tons Of Concrete Culverts (Not Located 12/01) Date of Deployment: May 27 1994 Primary Material: CONCRETE CULVERTS Tonnage: 800 County: COLLIER Depth: 34 ft Relief: 4 ft [1] Tides & Fishing Times |
34 ft | 26° 10' 13" N | 81° 54' 22" W |
| Lee-Collier |
Lee-Collierbusses10/87Dgps Date of Deployment: October 31 1987 Primary Material: STEEL BUSES County: LEE Depth: 35 ft [1] Tides & Fishing Times |
35 ft | 26° 17' 26" N | 81° 55' 3" W |
| Wiggins Pass 4.5 Mile Reef |
Steel Barge And Crane Date of Deployment: February 4 1987 Primary Material: BARGE STEEL County: COLLIER Depth: 31 ft Relief: 5 ft [1] Tides & Fishing Times |
31 ft | 26° 17' 28" N | 81° 55' 10" W |
| Wiggins Pass 5 Mile |
School Buses Coke And Other Soft Drink Trucks. Date of Deployment: September 1 1986 Primary Material: STEEL SCHOOL BUSES County: COLLIER Depth: 30 ft Relief: 5 ft [1] Tides & Fishing Times |
30 ft | 26° 17' 28" N | 81° 55' 48" W |
| Wiggins Pass 5 Mile |
School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: September 1 1986 Primary Material: STEEL SCHOOL BUSES County: COLLIER Depth: 30 ft Relief: 5 ft [1] Tides & Fishing Times |
30 ft | 26° 17' 29" N | 81° 55' 49" W |
| G-H Reef |
8 Concrete And Screen Juvenile Habitats Large Diameter Vertical Date of Deployment: December 14 1995 Primary Material: CONCRETE CULVERTS County: LEE Depth: 27 ft Relief: 8 ft [1] Tides & Fishing Times |
27 ft | 26° 20' 40" N | 81° 56' 42" W |
| G-H Reef |
Concrete Culverts 4.5 Miles From Big Carlos Pass Date of Deployment: May 24 1995 Primary Material: CONCRETE CULVERTS Tonnage: 450 County: LEE Depth: 28 ft [1] Tides & Fishing Times |
28 ft | 26° 20' 45" N | 81° 57' 11" W |
| G-H Reef |
110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters. Date of Deployment: August 1 1984 Primary Material: BARGE STEEL County: LEE Depth: 30 ft [1] Tides & Fishing Times |
30 ft | 26° 20' 35" N | 81° 57' 14" W |
| Caxambas Pass 14 Miles Reef |
360 Tons Of Concrete Culverts (Not Located 12/01). Date of Deployment: May 18 1991 Primary Material: CONCRETE CULVERTS Tonnage: 360 County: COLLIER Depth: 46 ft [1] Tides & Fishing Times |
46 ft | 25° 47' 31" N | 81° 57' 15" W |
| G-H Reef |
Limestone Added To Previous Materials. Date of Deployment: May 7 1994 Primary Material: ROCK LIMESTONE Tonnage: 510 County: LEE Depth: 28 ft Relief: 6 ft [1] Tides & Fishing Times |
28 ft | 26° 20' 39" N | 81° 57' 31" W |
| Marco 12 Mile Site M12c |
2 Of 6 Drops This Grant 2 Of 2 This Date Date of Deployment: June 9 2003 Primary Material: CONCRETE RAILROAD TIES (180) Tonnage: 81.6 County: COLLIER Depth: 45 ft Relief: 6 ft [1] Tides & Fishing Times |
45 ft | 25° 54' 42" N | 81° 59' 2" W |
| Marco Island 12 Mile M12cd05 |
900 Tons Of Concrete Rubble Date of Deployment: May 22 2005 Primary Material: CONCRETE RUBBLE Tonnage: 900 County: COLLIER Depth: 46 ft Relief: 8 ft [1] Tides & Fishing Times |
46 ft | 25° 54' 32" N | 81° 59' 2" W |
| Marco 12 Mile Site M12c |
3 Of 6 Drops This Grant 1 Of 4 This Date Date of Deployment: June 14 2003 Primary Material: CONCRETE CULVERTS AND BOXES (720) Tonnage: 44.9 County: COLLIER Depth: 45 ft Relief: 8 ft [1] Tides & Fishing Times |
45 ft | 25° 54' 42" N | 81° 59' 2" W |
| Amt Reef |
About 400 Large (3 Ft) Pieces Of Concrete Rubble Three Drops Also 11 Date of Deployment: November 23 2004 Primary Material: CONCRETE RUBBLE (400) Tonnage: 1800 County: COLLIER Depth: 45 ft Relief: 10 ft [1] Tides & Fishing Times |
45 ft | 25° 54' 36" N | 81° 59' 5" W |
| Marco 12 Mile Site M12a |
1 Of 6 Drops This Grant 1 Of 2 This Date Date of Deployment: June 9 2003 Primary Material: CONCRETE RAILROAD TIES Tonnage: 417.8 County: COLLIER Depth: 45 ft Relief: 8 ft [1] Tides & Fishing Times |
45 ft | 25° 54' 35" N | 81° 59' 9" W |
| Marco 12 Mile Site M12b |
4 Of 6 Drops This Grant 2 Of 4 This Date Date of Deployment: June 14 2003 Primary Material: LIMESTONE BOULDERS (50) Tonnage: 142.8 County: COLLIER Depth: 45 ft Relief: 10 ft [1] Tides & Fishing Times |
45 ft | 25° 54' 40" N | 81° 59' 12" W |
| Gordon Pass 9 Mile |
92 Concrete Modules Set In Six Rows From North To South. Date of Deployment: June 29 1992 Primary Material: MODULES CONCRETE County: COLLIER Depth: 23 ft [1] Tides & Fishing Times |
23 ft | 26° 3' 46" N | 81° 59' 21" W |
| Evan Thompson Reef Units |
20’X20’x12’h Lincoln Log Structure 50 Pilings Date of Deployment: May 26 2000 Primary Material: CONCRETE MODULE LINCOLN LOGS Tonnage: 144 County: LEE Depth: 32 ft Relief: 12 ft [1] Tides & Fishing Times |
32 ft | 26° 20' 17" N | 82° 5' 7" W |
| Evan Thompson Reef Units |
20’X20’x12’h Lincoln Log Structure 50 Pilings Date of Deployment: May 25 2000 Primary Material: CONCRETE MODULE LINCOLN LOGS Tonnage: 144 County: LEE Depth: 32 ft Relief: 12 ft [1] Tides & Fishing Times |
32 ft | 26° 20' 17" N | 82° 5' 7" W |
| Evan Thompson Reef Units |
Five 7’ X 7’ Slabs With Two Culverts Each Date of Deployment: May 27 2000 Primary Material: CONCRETE CULVERTS (10) County: LEE Depth: 32 ft Relief: 12 ft [1] Tides & Fishing Times |
32 ft | 26° 20' 17" N | 82° 5' 7" W |
| E-F (Jaycees) Reef |
310 Tons Of Concrete Culverts. Date of Deployment: June 30 1992 Primary Material: CONCRETE CULVERTS Tonnage: 310 County: LEE Depth: 31 ft Relief: 8 ft [1] Tides & Fishing Times |
31 ft | 26° 20' 5" N | 82° 5' 21" W |
| E-F (Jaycees) Reef |
225 Tons Of Concrete Culverts. Date of Deployment: June 7 1991 Primary Material: CONCRETE CULVERTS Tonnage: 225 County: LEE Depth: 31 ft Relief: 8 ft [1] Tides & Fishing Times |
31 ft | 26° 20' 9" N | 82° 5' 21" W |
| Doc Kline Lincolin Logs |
2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’ Date of Deployment: September 5 2000 Primary Material: CONCRETE PILINGS County: LEE Depth: 30 ft Relief: 8 ft [1] Tides & Fishing Times |
30 ft | 26° 20' 21" N | 82° 5' 24" W |
| E-F (Jaycees) Reef |
300 Tons Of Precast Concrete. Date of Deployment: June 30 1993 Primary Material: CONCRETE CULVERTS Tonnage: 300 County: LEE Depth: 31 ft Relief: 8 ft [1] Tides & Fishing Times |
31 ft | 26° 20' 9" N | 82° 5' 33" W |
| Wiggins Pass 14 Mile Reef |
Concrete Culverts And Rubble (Not Located 12/01) Date of Deployment: December 31 1991 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 48 ft [1] Tides & Fishing Times |
48 ft | 26° 14' 52" N | 82° 5' 50" W |
| Gordon Pass 14 Mile Reef |
1993 800 Tons Concrete Culvert And Rubble (Not Located 12/01) Date of Deployment: December 31 1993 Primary Material: CONCRETE CULVERTS County: COLLIER Depth: 42 ft [1] Tides & Fishing Times |
42 ft | 26° 14' 11" N | 82° 7' 35" W |
| Wiggins Pass 9 Mile |
800 Tons Of Concrete Culverts (Not Located 12/01) Date of Deployment: May 4 1993 Primary Material: CONCRETE CULVERTS Tonnage: 800 County: COLLIER Depth: 42 ft [1] Tides & Fishing Times |
42 ft | 26° 14' 1" N | 82° 7' 44" W |