Collier County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. The TidesPro iPhone/iPad/Mac app now also offers fishing coordinates, with Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: | |
Waypoint Name Description Depth Latitude Longitude
G-H Reef Concrete Culverts 4.5 Miles From Big Carlos Pass
Date of Deployment: May 24 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 450
County: LEE
Depth: 28 ft
[1]
Tides & Solunars
28 ft 26° 20' 45" N 26° 20.743' N 26.34572 81° 57' 11" W 81° 57.19' W -81.95317
G-H Reef 8 Concrete And Screen Juvenile Habitats Large Diameter Vertical
Date of Deployment: December 14 1995
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 27 ft

Relief: 8 ft [1]
Tides & Solunars
27 ft 26° 20' 40" N 26° 20.67' N 26.3445 81° 56' 42" W 81° 56.698' W -81.94497
G-H Reef Limestone Added To Previous Materials.
Date of Deployment: May 7 1994
Primary Material: ROCK LIMESTONE
Tonnage: 510
County: LEE
Depth: 28 ft

Relief: 6 ft [1]
Tides & Solunars
28 ft 26° 20' 39" N 26° 20.656' N 26.34427 81° 57' 31" W 81° 57.518' W -81.95863
G-H Reef 110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters.
Date of Deployment: August 1 1984
Primary Material: BARGE STEEL
County: LEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 26° 20' 35" N 26° 20.591' N 26.34318 81° 57' 14" W 81° 57.239' W -81.95398
Doc Kline Lincolin Logs 2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’
Date of Deployment: September 5 2000
Primary Material: CONCRETE PILINGS
County: LEE
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 26° 20' 21" N 26° 20.349' N 26.33915 82° 5' 24" W 82° 5.392' W -82.08987
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 26 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 26° 20.282' N 26.33803 82° 5' 7" W 82° 5.121' W -82.08535
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 25 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 26° 20.282' N 26.33803 82° 5' 7" W 82° 5.121' W -82.08535
Evan Thompson Reef Units Five 7’ X 7’ Slabs With Two Culverts Each
Date of Deployment: May 27 2000
Primary Material: CONCRETE CULVERTS (10)
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 26° 20.282' N 26.33803 82° 5' 7" W 82° 5.121' W -82.08535
E-F (Jaycees) Reef 300 Tons Of Precast Concrete.
Date of Deployment: June 30 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 26° 20.149' N 26.33582 82° 5' 33" W 82° 5.556' W -82.0926
E-F (Jaycees) Reef 225 Tons Of Concrete Culverts.
Date of Deployment: June 7 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 225
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 26° 20.148' N 26.3358 82° 5' 21" W 82° 5.352' W -82.0892
E-F (Jaycees) Reef 310 Tons Of Concrete Culverts.
Date of Deployment: June 30 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 310
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 5" N 26° 20.078' N 26.33463 82° 5' 21" W 82° 5.348' W -82.08913
Rock Reef - #3 About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 27" N 26° 18.452' N 26.30753 81° 52' 23" W 81° 52.377' W -81.87295
Rock Reef - #1 About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant
Date of Deployment: June 4 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 25" N 26° 18.412' N 26.30687 81° 52' 27" W 81° 52.456' W -81.87427
Eca Reef Concrete Rubble And Steel I Beams ,10000 Funded By Eca
Date of Deployment: May 24 2001
Primary Material: CONCRETE RUBBLE (200)
Tonnage: 319.1
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 22" N 26° 18.369' N 26.30615 81° 52' 21" W 81° 52.354' W -81.87257
Rock Reef - #4 About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 20" N 26° 18.326' N 26.30543 81° 52' 17" W 81° 52.286' W -81.87143
Wiggins Pass 3 Mile C And D Rubble And Culverts County Funded-,29379.00
Date of Deployment: October 1 2003
Primary Material: CONCRETE RUBBLE (600)
Tonnage: 652.8
County: COLLIER
Depth: 27 ft

Relief: 10 ft [1]
Tides & Solunars
27 ft 26° 18' 19" N 26° 18.324' N 26.3054 81° 52' 26" W 81° 52.426' W -81.87377
Rock Reef - #2 About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant
Date of Deployment: June 9 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 5 ft [1]
Tides & Solunars
24 ft 26° 18' 17" N 26° 18.286' N 26.30477 81° 52' 23" W 81° 52.376' W -81.87293
Wiggins Pass 5 Mile School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 29" N 26° 17.476' N 26.29127 81° 55' 49" W 81° 55.811' W -81.93018
Wiggins Pass 5 Mile School Buses Coke And Other Soft Drink Trucks.
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 28" N 26° 17.474' N 26.29123 81° 55' 48" W 81° 55.808' W -81.93013
Wiggins Pass 4.5 Mile Reef Steel Barge And Crane
Date of Deployment: February 4 1987
Primary Material: BARGE STEEL
County: COLLIER
Depth: 31 ft

Relief: 5 ft [1]
Tides & Solunars
31 ft 26° 17' 28" N 26° 17.469' N 26.29115 81° 55' 10" W 81° 55.165' W -81.91942
Lee-Collier Lee-Collierbusses10/87Dgps
Date of Deployment: October 31 1987
Primary Material: STEEL BUSES
County: LEE
Depth: 35 ft
[1]
Tides & Solunars
35 ft 26° 17' 26" N 26° 17.43' N 26.2905 81° 55' 3" W 81° 55.05' W -81.9175
Wiggins Pass 14 Mile Reef Concrete Culverts And Rubble (Not Located 12/01)
Date of Deployment: December 31 1991
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 48 ft
[1]
Tides & Solunars
48 ft 26° 14' 52" N 26° 14.86' N 26.24767 82° 5' 50" W 82° 5.83' W -82.09717
Gordon Pass 14 Mile Reef 1993 800 Tons Concrete Culvert And Rubble (Not Located 12/01)
Date of Deployment: December 31 1993
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 42 ft
[1]
Tides & Solunars
42 ft 26° 14' 11" N 26° 14.19' N 26.2365 82° 7' 35" W 82° 7.579' W -82.12632
Wiggins Pass 9 Mile 800 Tons Of Concrete Culverts (Not Located 12/01)
Date of Deployment: May 4 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 800
County: COLLIER
Depth: 42 ft
[1]
Tides & Solunars
42 ft 26° 14' 1" N 26° 14.01' N 26.2335 82° 7' 44" W 82° 7.736' W -82.12893
Clam Pass 3 Mile - 03 Concrete Manhole Risers And Covers ,20000 Funded By City Of Naples And C
Date of Deployment: May 31 2001
Primary Material: CONCRETE MANHOLE RISERS (28)
Tonnage: 358.5
County: COLLIER
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 26° 13' 35" N 26° 13.588' N 26.22647 81° 52' 13" W 81° 52.212' W -81.8702
Clam Pass 3 Mile - Pile 1800 Concrete Railroad Ties 8’X12X10
Date of Deployment: June 1 2001
Primary Material: CONCRETE RAILROAD TIES (1800)
Tonnage: 591.7
County: COLLIER
Depth: 26 ft

Relief: 11 ft [1]
Tides & Solunars
26 ft 26° 13' 34" N 26° 13.572' N 26.2262 81° 52' 4" W 81° 52.074' W -81.8679
Clam Pass 3 Mile -01 Six Feet Across Concrete Slabs And Pilings (1 Of 2 Deployments)
Date of Deployment: May 14 2000
Primary Material: CONCRETE RUBBLE (100)
Tonnage: 345.8
County: COLLIER
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 26° 13' 34" N 26° 13.572' N 26.2262 81° 52' 4" W 81° 52.074' W -81.8679
Clam Pass 3 Mile -C And D Rubble And Pilings County Funded ,25695
Date of Deployment: September 26 2003
Primary Material: CONCRETE RUBBLE (500)
Tonnage: 571
County: COLLIER [1]
Tides & Solunars
26° 13' 27" N 26° 13.445' N 26.22408 81° 52' 14" W 81° 52.229' W -81.87048
Clam Pass 3 Mile -02 Six Feet Across Concrete Slabs Pilings And Cutoffs (2 Of 2 Deploymen
Date of Deployment: May 22 2000
Primary Material: CONCRETE RUBBLE (100)
Tonnage: 392.6
County: COLLIER
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 26° 13' 23" N 26° 13.39' N 26.22317 81° 52' 3" W 81° 52.051' W -81.86752
Doctor's Pass 5 Mile 800 Tons Of Concrete Culverts (Not Located 12/01)
Date of Deployment: May 27 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 800
County: COLLIER
Depth: 34 ft

Relief: 4 ft [1]
Tides & Solunars
34 ft 26° 10' 13" N 26° 10.215' N 26.17025 81° 54' 22" W 81° 54.375' W -81.90625
Naples Pier Reef Large Pile Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: June 17 1995
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 25 ft

Relief: 6 ft [1]
Tides & Solunars
25 ft 26° 8' 2" N 26° 8.026' N 26.13377 81° 50' 39" W 81° 50.646' W -81.8441
Naples Pier Reef Widely Scattered Piles Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: June 17 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 250
County: COLLIER
Depth: 22 ft

Relief: 3 ft [1]
Tides & Solunars
22 ft 26° 7' 49" N 26° 7.815' N 26.13025 81° 50' 42" W 81° 50.703' W -81.84505
Gordon Pass 5 Mile Reef - #10 Confirmed By Rbf Grant Fwcc-01002
Date of Deployment:
Primary Material: BRIDGE RUBBLE CONCRETE
County: COLLIER
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 26° 5' 48" N 26° 5.804' N 26.09673 81° 53' 18" W 81° 53.302' W -81.88837
Gordon Pass 5 Mile Reef - #9 Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE CONCRETE
County: COLLIER
Depth: 35 ft

Relief: 4 ft [1]
Tides & Solunars
35 ft 26° 5' 48" N 26° 5.794' N 26.09657 81° 53' 19" W 81° 53.32' W -81.88867
Gordon Pass 5 Mile Reef - #8 Confirmed By Rbf Grant Fwcc-01002
Date of Deployment:
Primary Material: BRIDGE RUBBLE CONCRETE
County: COLLIER
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 26° 5' 47" N 26° 5.782' N 26.09637 81° 53' 20" W 81° 53.338' W -81.88897
Gordon Pass 5 Mile Reef - #2 Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100
Date of Deployment: March 1 1993
Primary Material: STEEL RECTANGULAR TANKS
County: COLLIER
Depth: 35 ft

Relief: 4 ft [1]
Tides & Solunars
35 ft 26° 5' 47" N 26° 5.777' N 26.09628 81° 53' 21" W 81° 53.342' W -81.88903
Gordon Pass 5 Mile Reef - #11 Dc3 Fuselage And Concrete Culverts (Not Located 12/01)
Date of Deployment: December 7 1987
Primary Material: AIRPLANE DC3
County: COLLIER
Depth: 25 ft
[1]
Tides & Solunars
25 ft 26° 5' 26" N 26° 5.434' N 26.09057 81° 53' 42" W 81° 53.698' W -81.89497
Santa Lucia 81 Ton Cement Boat Called The Santa Lucia
Date of Deployment: April 30 1997
Primary Material: SHIP CEMENT
Tonnage: 81
County: COLLIER
Depth: 24 ft
[1]
Tides & Solunars
24 ft 26° 5' 23" N 26° 5.388' N 26.0898 81° 50' 38" W 81° 50.626' W -81.84377
Gordon Pass 5 Mile Reef - #1 1 Barge Of Square Shaped Power Poles Hollow Inside (Not Found 12/01)
Date of Deployment: June 5 1996
Primary Material: CONCRETE PILINGS
Tonnage: 680
County: COLLIER
Depth: 26 ft

Relief: 3 ft [1]
Tides & Solunars
26 ft 26° 5' 9" N 26° 5.15' N 26.08583 81° 53' 20" W 81° 53.333' W -81.88888
Gordon Pass 5 Mile Reef - #6 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 54" N 26° 4.899' N 26.08165 81° 53' 7" W 81° 53.124' W -81.8854
Gordon Pass 5 Mile Reef - #5 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 54" N 26° 4.893' N 26.08155 81° 53' 8" W 81° 53.126' W -81.88543
Gordon Pass 5 Mile Reef - #7 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 54" N 26° 4.893' N 26.08155 81° 53' 8" W 81° 53.126' W -81.88543
Gordon Pass 5 Mile Reef - #3 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 53" N 26° 4.888' N 26.08147 81° 53' 8" W 81° 53.131' W -81.88552
Gordon Pass 5 Mile Reef - #4 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 52" N 26° 4.87' N 26.08117 81° 53' 9" W 81° 53.144' W -81.88573
Gordon Pass 9 Mile 92 Concrete Modules Set In Six Rows From North To South.
Date of Deployment: June 29 1992
Primary Material: MODULES CONCRETE
County: COLLIER
Depth: 23 ft
[1]
Tides & Solunars
23 ft 26° 3' 46" N 26° 3.77' N 26.06283 81° 59' 21" W 81° 59.35' W -81.98917
Keewaydin 3 Mile - Site 4 Limestone Boulders -#4 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 11 ft [1]
Tides & Solunars
27 ft 26° 2' 14" N 26° 2.226' N 26.0371 81° 49' 58" W 81° 49.969' W -81.83282
Keewaydin 3 Mile - C And D Reef 02 Rubble And Culverts County Funded
Date of Deployment: June 24 2003
Primary Material: CONCRETE RUBBLE (150)
Tonnage: 632
County: COLLIER
Depth: 28 ft

Relief: 10 ft [1]
Tides & Solunars
28 ft 26° 2' 11" N 26° 2.184' N 26.0364 81° 49' 52" W 81° 49.859' W -81.83098
Keewaydin 3 Mile - Site 3 Limestone Boulders -#3 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 12 ft [1]
Tides & Solunars
27 ft 26° 2' 10" N 26° 2.169' N 26.03615 81° 49' 54" W 81° 49.899' W -81.83165
Keewaydin 3 Mile - Site 2 Limestone Boulders -#2 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 9 ft [1]
Tides & Solunars
27 ft 26° 2' 7" N 26° 2.109' N 26.03515 81° 49' 51" W 81° 49.852' W -81.83087
Keewaydin 3 Mile - C And D Reef 01 Rubble And Culverts County Funded
Date of Deployment: June 19 2003
Primary Material: CONCREETE SLABS (100)
Tonnage: 612
County: COLLIER
Depth: 28 ft

Relief: 10 ft [1]
Tides & Solunars
28 ft 26° 2' 5" N 26° 2.09' N 26.03483 81° 49' 51" W 81° 49.85' W -81.83083
Keewaydin 3 Mile - Site 1 Limestone Boulders -#1 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 8 ft [1]
Tides & Solunars
27 ft 26° 2' 2" N 26° 2.034' N 26.0339 81° 49' 47" W 81° 49.787' W -81.82978
Caxambas Pass 2.5 Mile 170 Tons Of Pilings 2Nd Of Two Loads (Not Found 12/01)
Date of Deployment: May 28 1997
Primary Material: CONCRETE PILINGS
Tonnage: 170
County: COLLIER
Depth: 24 ft
[1]
Tides & Solunars
24 ft 25° 55' 55" N 25° 55.92' N 25.932 81° 45' 12" W 81° 45.2' W -81.75333
Marco Island 2 Mile - #3 Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 25° 55' 49" N 25° 55.821' N 25.93035 81° 46' 58" W 81° 46.965' W -81.78275
Caxambas Pass 2.5 Mile 180 Tons Pipe And 160 Tons Pilings 20K Sq. Ft 1 Of 2 Loads (Not Foun
Date of Deployment: May 22 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 340
County: COLLIER
Depth: 24 ft
[1]
Tides & Solunars
24 ft 25° 55' 48" N 25° 55.8' N 25.93 81° 46' 0" W 81° 46' W -81.76667
Marco Island 2 Mile - #2 Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 23 ft

Relief: 5 ft [1]
Tides & Solunars
23 ft 25° 55' 27" N 25° 55.449' N 25.92415 81° 46' 13" W 81° 46.213' W -81.77022
Marco Island 2 Mile - #1 Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 25° 55' 26" N 25° 55.434' N 25.9239 81° 46' 14" W 81° 46.236' W -81.7706
Marco Island 2 Mile - #6 Concrete Rubble And Tires No Buoy Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1972
Primary Material: CONCRETE RUBBLE
County: COLLIER
Depth: 23 ft

Relief: 4 ft [1]
Tides & Solunars
23 ft 25° 55' 26" N 25° 55.434' N 25.9239 81° 46' 14" W 81° 46.236' W -81.7706
Marco Pass Reef Site 6 Loads10/3-5-20/83 And 12/1-2-3/83 (Not Located 12/01)
Date of Deployment: December 30 1983
Primary Material: CONCRETE CULVERTS
Tonnage: 1435
County: COLLIER
Depth: 22 ft
[1]
Tides & Solunars
22 ft 25° 55' 24" N 25° 55.4' N 25.92333 81° 46' 15" W 81° 46.25' W -81.77083
Marco Island 2 Mile - #5 Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1972
Primary Material: CONCRETE RUBBLE
County: COLLIER
Depth: 21 ft

Relief: 5 ft [1]
Tides & Solunars
21 ft 25° 55' 24" N 25° 55.396' N 25.92327 81° 45' 47" W 81° 45.783' W -81.76305
Marco Island 2 Mile - #4 Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1972
Primary Material: STEEL PIPE
County: COLLIER
Depth: 21 ft

Relief: 3 ft [1]
Tides & Solunars
21 ft 25° 55' 24" N 25° 55.395' N 25.92325 81° 45' 46" W 81° 45.764' W -81.76273
Marco 12 Mile Site M12c 2 Of 6 Drops This Grant 2 Of 2 This Date
Date of Deployment: June 9 2003
Primary Material: CONCRETE RAILROAD TIES (180)
Tonnage: 81.6
County: COLLIER
Depth: 45 ft

Relief: 6 ft [1]
Tides & Solunars
45 ft 25° 54' 42" N 25° 54.698' N 25.91163 81° 59' 2" W 81° 59.034' W -81.9839
Marco 12 Mile Site M12c 3 Of 6 Drops This Grant 1 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: CONCRETE CULVERTS AND BOXES (720)
Tonnage: 44.9
County: COLLIER
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 25° 54' 42" N 25° 54.695' N 25.91158 81° 59' 2" W 81° 59.038' W -81.98397
Marco 12 Mile Site M12b 4 Of 6 Drops This Grant 2 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: LIMESTONE BOULDERS (50)
Tonnage: 142.8
County: COLLIER
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 25° 54' 40" N 25° 54.674' N 25.91123 81° 59' 12" W 81° 59.198' W -81.98663
Amt Reef About 400 Large (3 Ft) Pieces Of Concrete Rubble Three Drops Also 11
Date of Deployment: November 23 2004
Primary Material: CONCRETE RUBBLE (400)
Tonnage: 1800
County: COLLIER
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 25° 54' 36" N 25° 54.607' N 25.91012 81° 59' 5" W 81° 59.088' W -81.9848
Marco 12 Mile Site M12a 1 Of 6 Drops This Grant 1 Of 2 This Date
Date of Deployment: June 9 2003
Primary Material: CONCRETE RAILROAD TIES
Tonnage: 417.8
County: COLLIER
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 25° 54' 35" N 25° 54.588' N 25.9098 81° 59' 9" W 81° 59.153' W -81.98588
Marco Island 12 Mile M12cd05 900 Tons Of Concrete Rubble
Date of Deployment: May 22 2005
Primary Material: CONCRETE RUBBLE
Tonnage: 900
County: COLLIER
Depth: 46 ft

Relief: 8 ft [1]
Tides & Solunars
46 ft 25° 54' 32" N 25° 54.526' N 25.90877 81° 59' 2" W 81° 59.037' W -81.98395
Marco 9 Mile M9c 6 Of 6 Drops This Grant 4 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: CONCRETE CULVERTS AND BOXES (40)
Tonnage: 142.8
County: COLLIER
Depth: 39 ft

Relief: 8 ft [1]
Tides & Solunars
39 ft 25° 52' 58" N 25° 52.973' N 25.88288 81° 54' 3" W 81° 54.052' W -81.90087
Marco 9 Mile M9b Richie Reef 5 Of 6 Drops This Grant 3 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: LIMESTONE BOULDERS (50)
Tonnage: 122.4
County: COLLIER
Depth: 39 ft

Relief: 10 ft [1]
Tides & Solunars
39 ft 25° 52' 58" N 25° 52.969' N 25.88282 81° 54' 12" W 81° 54.198' W -81.9033
Marco Island 9 Mile Reef - #1 Concrete Bridge And Pilings ,15000 Funded By City Of Marco Is. (1 Of 2
Date of Deployment: June 5 2001
Primary Material: BRIDGE CONCRETE DECKING (11)
Tonnage: 212.7
County: COLLIER
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 25° 52' 51" N 25° 52.844' N 25.88073 81° 54' 9" W 81° 54.144' W -81.9024
Marco Island 9 Mile Reef - #2 Concrete Bridge Pilings And Rubble ,15000 Funded By City Of Marco Is.
Date of Deployment: June 7 2001
Primary Material: BRIDGE CONCRETE DECKING (7)
Tonnage: 239.4
County: COLLIER
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 25° 52' 51" N 25° 52.844' N 25.88073 81° 54' 9" W 81° 54.144' W -81.9024
Memorial Reef Balls 1 Ultra 6 Reefballs And 8 Pallet Balls As Memorial Reef
Date of Deployment: August 6 2002
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 3.7
County: COLLIER
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 25° 52' 47" N 25° 52.784' N 25.87973 81° 54' 5" W 81° 54.08' W -81.90133
Marco Island 5 Mile Reef - #1 Marco 5 Mile Dredge Pipe Pontoons1986
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 30 ft

Relief: 4 ft [1]
Tides & Solunars
30 ft 25° 51' 56" N 25° 51.931' N 25.86552 81° 47' 52" W 81° 47.872' W -81.79787
Marco Island 5 Mile Reef - #3 Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 31 ft

Relief: 4 ft [1]
Tides & Solunars
31 ft 25° 51' 56" N 25° 51.931' N 25.86552 81° 47' 49" W 81° 47.819' W -81.79698
Collier 5 Mile Reef 72X32x6 Ft Barge And 512Yds Of Pilings Confirmed By Rbf Grant Fwcc-0
Date of Deployment: October 29 1980
Primary Material: BARGE STEEL 72’
County: COLLIER
Depth: 31 ft

Relief: 6 ft [1]
Tides & Solunars
31 ft 25° 51' 54" N 25° 51.896' N 25.86493 81° 47' 47" W 81° 47.788' W -81.79647
Marco Island 5 Mile Reef - #6 Large Diameter Concrete Culverts
Date of Deployment: June 1 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: COLLIER
Depth: 32 ft

Relief: 4 ft [1]
Tides & Solunars
32 ft 25° 51' 54" N 25° 51.896' N 25.86493 81° 47' 47" W 81° 47.788' W -81.79647
Marco Island 5 Mile Reef - #5 Steel Barge Steel Pipe And Concrete Rubble
Date of Deployment: December 31 1986
Primary Material: BARGE STEEL
County: COLLIER
Depth: 30 ft

Relief: 7 ft [1]
Tides & Solunars
30 ft 25° 51' 53" N 25° 51.884' N 25.86473 81° 47' 58" W 81° 47.971' W -81.79952
Collier 5 Mile Reef 800 Yards Of Concrete Pilings (Curbs) Confirmed By Rbf Grant Fwcc-01
Date of Deployment: November 8 1980
Primary Material: CONCRETE PILINGS
County: COLLIER
Depth: 31 ft

Relief: 3 ft [1]
Tides & Solunars
31 ft 25° 51' 50" N 25° 51.826' N 25.86377 81° 47' 38" W 81° 47.633' W -81.79388
Marco Island 5 Mile Reef - #4 Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 31 ft

Relief: 4 ft [1]
Tides & Solunars
31 ft 25° 51' 49" N 25° 51.816' N 25.8636 81° 47' 39" W 81° 47.648' W -81.79413
Caxambas Pass 5.0 Mile Marco 5 Mile 1972 Concrete And Pipe (Not Located 12/01)
Date of Deployment: December 31 1972
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 30 ft
[1]
Tides & Solunars
30 ft 25° 51' 47" N 25° 51.788' N 25.86313 81° 47' 40" W 81° 47.664' W -81.7944
Marco Island 5 Mile Reef - #2 Marco 5 Mile 1986 Dredge Pipe
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 30 ft

Relief: 4 ft [1]
Tides & Solunars
30 ft 25° 51' 47" N 25° 51.776' N 25.86293 81° 47' 52" W 81° 47.868' W -81.7978
Collier 5 Mile Reef 1000 Yards Of Concrete Pilings (Curbs) 2Nd Of 3 Loads This Grant
Date of Deployment: November 4 1980
Primary Material: CONCRETE PILINGS
County: COLLIER
Depth: 31 ft

Relief: 6 ft [1]
Tides & Solunars
31 ft 25° 51' 20" N 25° 51.331' N 25.85552 81° 47' 37" W 81° 47.61' W -81.7935
Caxambas Pass 14 Miles Reef 360 Tons Of Concrete Culverts (Not Located 12/01).
Date of Deployment: May 18 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 360
County: COLLIER
Depth: 46 ft
[1]
Tides & Solunars
46 ft 25° 47' 31" N 25° 47.52' N 25.792 81° 57' 15" W 81° 57.245' W -81.95408
Pavilion Key 6 Mile Reef - Site 3 Lowered By Crane To The Bottom (Not Located 12/01)
Date of Deployment: April 28 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 18 ft
[1]
Tides & Solunars
18 ft 25° 41' 18" N 25° 41.3' N 25.68833 81° 28' 0" W 81° 28' W -81.46667
Pavilion Key 6 Mile Reef - Site 2 Concrete Culverts And Rubble From Docks
Date of Deployment: December 31 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 16 ft
[1]
Tides & Solunars
16 ft 25° 41' 11" N 25° 41.18' N 25.68633 81° 28' 0" W 81° 28' W -81.46667
Pavilion Key 6 Mile Reef - Site 1 Barge And Concrete Rubble Confirmed By Rbf Grant Fwcc-01002
Date of Deployment:
Primary Material: BARGE STEEL
County: COLLIER
Depth: 17 ft

Relief: 8 ft [1]
Tides & Solunars
17 ft 25° 40' 58" N 25° 40.962' N 25.6827 81° 27' 49" W 81° 27.81' W -81.4635