Wakulla County
钓点 GPS 坐标
下方地点主要为人工鱼礁和沉船。 点击地图上的地点可查看说明和坐标,或向下滚动至列表查看完整详情。 点击各地点的以下按钮,即可查看潮汐预测与钓鱼时间(月相活动时段): 潮汐与钓鱼时间 按钮即可。 此 TidesPro iPhone/iPad/Mac 应用 现也通过 Premium 服务提供钓点坐标。您也可以在这个由广告支持的网站上免费查看。
航点地图
点击或轻触标记,查看该航点的更多信息。| 坐标显示格式: | | | ||||
|---|---|---|---|---|
| 航点 名称 | 说明 | 深度 | 纬度 | 经度 |
| Oar/Wakulla Dz#2 (2) |
Fiberglass Boat Molds And Bridge Materials. Date of Deployment: January 26 1991 Primary Material: FIBERGLASS BOAT MOLDS County: WAKULLA 深度: 58 ft 高出海床的高度: 6 ft [1] 潮汐与钓鱼时间 |
58 ft | 29° 43' 43" N | 84° 18' 30" W |
| Oar/Wakulla Dz#2 (1) |
Second Set Of 3 Boat Molds 4 Bridge Slabs Date of Deployment: December 6 1990 Primary Material: FIBERGLASS BOAT MOLDS County: WAKULLA 深度: 58 ft 高出海床的高度: 8 ft [1] 潮汐与钓鱼时间 |
58 ft | 29° 43' 41" N | 84° 18' 19" W |
| Oar/Wakulla Dz#1 (2) |
1Rst Of Three Two Distinct Sets Date of Deployment: May 6 1997 Primary Material: CONCRETE CULVERTS Tonnage: 123 County: WAKULLA 深度: 52 ft 高出海床的高度: 13 ft [1] 潮汐与钓鱼时间 |
52 ft | 29° 43' 44" N | 84° 18' 6" W |
| Oar/Wakulla Dz#1 (1) |
297 Tons Of Concrete Culverts. Date of Deployment: June 4 1994 Primary Material: CONCRETE CULVERTS Tonnage: 297 County: WAKULLA 深度: 65 ft 高出海床的高度: 6 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 37" N | 84° 18' 2" W |
| Oar/Wakulla Dz#1 (3) |
2Nd Load Of Three Deployments This Grant Date of Deployment: May 14 1997 Primary Material: CONCRETE CULVERTS Tonnage: 112 County: WAKULLA 深度: 53 ft [1] 潮汐与钓鱼时间 |
53 ft | 29° 43' 46" N | 84° 17' 52" W |
| Oar/Wakulla Dz#1 (4) |
140 Tons Of Culverts 3Rd Of Three Deployments This Site Date of Deployment: May 20 1997 Primary Material: CONCRETE CULVERTS Tonnage: 140 County: WAKULLA 深度: 52 ft [1] 潮汐与钓鱼时间 |
52 ft | 29° 43' 50" N | 84° 17' 51" W |
| Oar/Wakulla Dz#3 (8) |
Concrete Culverts-Concrete Tanks And Miscellaneous Concrete. Date of Deployment: June 1 1993 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 56 ft [1] 潮汐与钓鱼时间 |
56 ft | 29° 44' 3" N | 84° 17' 20" W |
| Oar/Wakulla Dz#3 (7) |
200 Tons Of Concrete Culverts And Concrete Boxes. Date of Deployment: June 21 1992 Primary Material: CONCRETE CULVERTS Tonnage: 200 County: WAKULLA 深度: 55 ft 高出海床的高度: 6 ft [1] 潮汐与钓鱼时间 |
55 ft | 29° 44' 1" N | 84° 17' 17" W |
| Oar/Wakulla Dz#3 (1) |
35 Culverts And 5 Cement Mixers Load #1 Of 6. Date of Deployment: June 28 1990 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 65 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 56" N | 84° 17' 9" W |
| Oar/Wakulla Dz#3 (2) |
35 Culverts Load #2 Of 6 Loads Date of Deployment: June 29 1990 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 65 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 56" N | 84° 17' 9" W |
| Oar/Wakulla Dz#3 (3) |
70 Culverts Load #3 Of 6 Loads Date of Deployment: June 30 1990 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 65 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 56" N | 84° 17' 9" W |
| Oar/Wakulla Dz#3 (4) |
70 Culverts Load #4 Of 6 Loads Date of Deployment: July 1 1990 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 65 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 56" N | 84° 17' 9" W |
| Oar/Wakulla Dz#3 (5) |
70 Culverts Load #5 Of 6 Loads Date of Deployment: July 2 1990 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 65 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 56" N | 84° 17' 9" W |
| Oar/Wakulla Dz#3 (6) |
67 Concrete Slabs 6 4Th Load Of 6 Loads. Date of Deployment: July 3 1990 Primary Material: CONCRETE RUBBLE County: WAKULLA 深度: 65 ft [1] 潮汐与钓鱼时间 |
65 ft | 29° 43' 56" N | 84° 17' 9" W |
| Rotary Reef - #4 |
Concrete Culverts 2Nd Of 5 Loads This Reef (8 Loads This Grant) Date of Deployment: June 1 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 25 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
25 ft | 29° 54' 53" N | 84° 14' 10" W |
| Rotary Reef - #2 |
9 Separate Loads Of Pipes From 7/12/82 To 8/24/82 Date of Deployment: August 24 1982 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 25 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
25 ft | 29° 54' 53" N | 84° 14' 9" W |
| Rotary Reef - #6 |
Concrete Culverts 4Th Of 5 Loads This Reef (8 Loads This Grant) Date of Deployment: June 17 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 25 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
25 ft | 29° 54' 53" N | 84° 14' 9" W |
| Rotary Reef - #3 |
Fuselage Of Dc-3 Concrete Slabs 1Rst Of 5 For Reef (8 This Grant) Date of Deployment: May 30 1988 Primary Material: AIRPLANE DC3 County: WAKULLA 深度: 20 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
20 ft | 29° 54' 54" N | 84° 14' 8" W |
| Rotary Reef - #5 |
Concrete Culverts 3Rd Of 5 Loads This Reef (8 Loads This Grant) Date of Deployment: June 4 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 20 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
20 ft | 29° 55' 6" N | 84° 14' 5" W |
| Rotary Reef - #7 |
Concrete Culverts 5Th Of 5 Loads This Reef (8 Loads This Grant) Date of Deployment: June 21 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 25 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
25 ft | 29° 55' 11" N | 84° 14' 1" W |
| Rotary Reef - #1 |
Rotary Reefs 2500 Tires 200 X 300 Feet About Center Coordinates Date of Deployment: December 31 1964 Primary Material: TIRES (2500) County: WAKULLA 深度: 25 ft 高出海床的高度: 3 ft [1] 潮汐与钓鱼时间 |
25 ft | 29° 54' 49" N | 84° 13' 13" W |
| Marker 24 Barge (W) |
Steel Barge Upside Down Near Marker 24 Non Permitted Site Date of Deployment: December 31 1986 Primary Material: BARGE STEEL County: WAKULLA 深度: 29 ft 高出海床的高度: 8 ft [1] 潮汐与钓鱼时间 |
29 ft | 29° 50' 23" N | 84° 9' 24" W |
| Marker 24 Barge North |
First Of Three Drops This Grant 93 Pieces 8’X15 8X30 8’X36 Date of Deployment: June 16 1999 Primary Material: CONCRETE CULVERTS (93) Tonnage: 114 County: WAKULLA 深度: 29 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
29 ft | 29° 50' 25" N | 84° 9' 24" W |
| Marker 24 Barge North And South |
3Rd Of 3 Drops This Grant 65 Pieces 8’X18 8X30 8’X36 Date of Deployment: June 30 1999 Primary Material: CONCRETE CULVERTS (65) Tonnage: 146 County: WAKULLA 深度: 29 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
29 ft | 29° 50' 25" N | 84° 9' 24" W |
| Marker 24 Barge South |
2Nd Of 3 Drops This Grant 80 Pieces 8’X15 8X30 8’X36 8’X48 Date of Deployment: June 28 1999 Primary Material: CONCRETE CULVERTS (80) Tonnage: 127 County: WAKULLA 深度: 31 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
31 ft | 29° 50' 21" N | 84° 9' 24" W |
| St. Marks Reef (1) |
Concrete Culverts 1Rst Of 3 Loads This Reef (8 Loads For Grant) Date of Deployment: June 8 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 20 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
20 ft | 29° 59' 55" N | 84° 9' 11" W |
| St. Marks Reef Tires |
St. Marks Reef Tires From A 1964 Deployment Date of Deployment: December 31 1964 Primary Material: TIRES County: WAKULLA 深度: 20 ft 高出海床的高度: 3 ft [1] 潮汐与钓鱼时间 |
20 ft | 29° 59' 57" N | 84° 9' 10" W |
| St. Marks Reef (2) |
Concrete Culverts 2Nd Of 3 Loads This Reef (8 Loads For The Grant) Date of Deployment: June 15 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 20 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
20 ft | 29° 59' 56" N | 84° 9' 10" W |
| St. Marks Reef (3) |
Concrete Culverts 3Rd Of 3 Loads This Reefs (8 Loads For The Grant) Date of Deployment: June 23 1988 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 20 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
20 ft | 29° 59' 59" N | 84° 9' 7" W |
| Wakulla #2 Big Bend Reef |
96 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon Date of Deployment: August 17 1995 Primary Material: MODULES CONCRETE CUBES (96) Tonnage: 120 County: WAKULLA 深度: 27 ft 高出海床的高度: 3 ft [1] 潮汐与钓鱼时间 |
27 ft | 29° 58' 8" N | 84° 8' 23" W |
| Wakulla #1 Big Bend Reef |
24 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon Date of Deployment: August 17 1995 Primary Material: MODULES CONCRETE CUBES (24) Tonnage: 30 County: WAKULLA 深度: 27 ft 高出海床的高度: 3 ft [1] 潮汐与钓鱼时间 |
27 ft | 29° 58' 10" N | 84° 7' 55" W |
| Oar-2K Reef |
30 Towers And 12 Fish Havens In A 50 Meter Pentagon Shape Date of Deployment: June 22 2000 Primary Material: MODULES CONCRETE FISH HAVENS (42) Tonnage: 73 County: WAKULLA 深度: 27 ft 高出海床的高度: 6 ft [1] 潮汐与钓鱼时间 |
27 ft | 29° 53' 36" N | 84° 7' 40" W |
| Dog Ballard Phase 1 |
253 Tons Of Concrete Culverts. Date of Deployment: August 8 1994 Primary Material: CONCRETE CULVERTS County: WAKULLA 深度: 26 ft 高出海床的高度: 5 ft [1] 潮汐与钓鱼时间 |
26 ft | 29° 57' 3" N | 84° 4' 51" W |
| Dog Ballard Phase 2 |
Non-Grant Project Large Concrete Poles Date of Deployment: August 8 1994 Primary Material: CONCRETE POLES County: WAKULLA 深度: 25 ft 高出海床的高度: 10 ft [1] 潮汐与钓鱼时间 |
25 ft | 29° 57' 7" N | 84° 4' 49" W |
| Dog Ballard Phase 3 |
108 - 1 Meter Square Cubes Placed In A Tight Square Date of Deployment: June 18 1996 Primary Material: MODULES CONCRETE CUBES (108) Tonnage: 135 County: WAKULLA 深度: 26 ft 高出海床的高度: 3 ft [1] 潮汐与钓鱼时间 |
26 ft | 29° 57' 3" N | 84° 4' 49" W |