Franklin County
钓点 GPS 坐标

下方地点主要为人工鱼礁和沉船。 点击地图上的地点可查看说明和坐标,或向下滚动至列表查看完整详情。 点击各地点的以下按钮,即可查看潮汐预测与钓鱼时间(月相活动时段): 潮汐与钓鱼时间 按钮即可。 此 TidesPro iPhone/iPad/Mac 应用 现也通过 Premium 服务提供钓点坐标。您也可以在这个由广告支持的网站上免费查看。

航点地图

点击或轻触标记,查看该航点的更多信息。
坐标显示格式: | |
航点 名称 说明 深度 纬度 经度
L Buoy Reef Concrete Rubble
Date of Deployment: December 31 1965
Primary Material: CONCRETE RUBBLE
County: FRANKLIN
深度: 45 ft
[1]
潮汐与钓鱼时间
45 ft 29° 31' 7" N 85° 7' 21" W
C Tower Navigational Tower 100 Ft. Above Water Sitting In A Barge
Date of Deployment: December 31 1973
Primary Material: BARGE STEEL
County: FRANKLIN [1]
潮汐与钓鱼时间
29° 24' 14" N 84° 51' 28" W
Apalachicola City Two Barges 140X28x12 And 140X35x9 Filled With 50 Tires Each
Date of Deployment: July 11 1984
Primary Material: BARGE STEEL (2)
County: FRANKLIN
深度: 80 ft

高出海床的高度: 12 ft [1]
潮汐与钓鱼时间
80 ft 29° 27' 33" N 84° 50' 23" W
City Of Apalachicola Site Bridge Rubble From High Part Of Apalachicola Bridge
Date of Deployment: December 10 1988
Primary Material: BRIDGE RUBBLE
County: FRANKLIN
深度: 78 ft

高出海床的高度: 8 ft [1]
潮汐与钓鱼时间
78 ft 29° 27' 47" N 84° 50' 9" W
St George Island Bridge Reef-West E 40 Concrete Bridge Pilings 20’X20’X20’ 99 Of 108 Drops
Date of Deployment: June 3 2004
Primary Material: CONCRETE BRIDGE PILINGS (40)
Tonnage: 80
County: FRANKLIN
深度: 75 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
75 ft 29° 30' 3" N 84° 49' 56" W
St George Island Bridge Reef-West C Single Concrete Bridge Span 55’X28’x6’ 77 Of 108 Drops
Date of Deployment: May 13 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
深度: 75 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
75 ft 29° 29' 60" N 84° 49' 26" W
St George Island Bridge Reef-Center Single Concrete Bridge Span 55’X28’x6’ 53 Of 108 Drops
Date of Deployment: April 9 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
深度: 75 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
75 ft 29° 30' 0" N 84° 49' 4" W
St George Island Bridge Reef-East C Single Concrete Bridge Span 55’X28’x6’ 94 Of 108 Drops
Date of Deployment: April 23 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
深度: 75 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
75 ft 29° 29' 57" N 84° 48' 39" W
St George Island Bridge Reef-East E Single Concrete Bridge Span 55’X28’x6’ 35 Of 108 Drops
Date of Deployment: March 28 2004
Primary Material: CONCRETE BRIDGE SPAN
Tonnage: 130
County: FRANKLIN
深度: 75 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
75 ft 29° 30' 1" N 84° 48' 11" W
Franklin County Reef (Bridge) Part Of Bay Bridge County Reef Mainly Slabs
Date of Deployment: December 10 1988
Primary Material: BRIDGE MATERIALS SPANS
County: FRANKLIN
深度: 65 ft
[1]
潮汐与钓鱼时间
65 ft 29° 32' 27" N 84° 45' 44" W
Carrabelle/Rotary Second Of 4 Drops This Grant 250 Yards From O Tower
Date of Deployment: October 11 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
潮汐与钓鱼时间
29° 31' 7" N 84° 39' 27" W
Carrabelle/Rotary Third Of 4 Drops This Grant
Date of Deployment: October 27 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
潮汐与钓鱼时间
29° 31' 7" N 84° 39' 27" W
Carrabelle/Rotary First Of 4 Drops This Project Buoy At 31330.0/46400.0
Date of Deployment: September 27 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
潮汐与钓鱼时间
29° 31' 7" N 84° 39' 27" W
Carrabelle/Rotary Fourth Of 4 Drops This Grant
Date of Deployment: November 10 1982
Primary Material: CONCRETE CULVERTS
County: FRANKLIN [1]
潮汐与钓鱼时间
29° 31' 7" N 84° 39' 27" W
Carrabelle Reef Culverts Concrete Rubble Fuel Storage Tanks Old Site
Date of Deployment: December 31 1982
Primary Material: CONCRETE RUBBLE
County: FRANKLIN
深度: 70 ft
[1]
潮汐与钓鱼时间
70 ft 29° 32' 22" N 84° 37' 28" W
One More Time 75 Foot Long Steel Shrimp Boat Deployed By Oar Sunk On Way Out
Date of Deployment: March 8 1992
Primary Material: SHIP STEEL SHRIMPER
County: FRANKLIN
深度: 36 ft

高出海床的高度: 12 ft [1]
潮汐与钓鱼时间
36 ft 29° 42' 21" N 84° 37' 25" W
One More Time Addition 75 Pieces Of 20 To 25 Feet Long (3.5 Ft X 2 Ft) Concrete Beams
Date of Deployment: June 22 2000
Primary Material: CONCRETE L BEAMS
Tonnage: 250
County: FRANKLIN
深度: 40 ft

高出海床的高度: 3 ft [1]
潮汐与钓鱼时间
40 ft 29° 42' 22" N 84° 37' 23" W
O-Tower Barge Aka Carrabelle Reef B Metal Barge
Date of Deployment: December 31 1982
Primary Material: BARGE STEEL
County: FRANKLIN
深度: 74 ft

高出海床的高度: 6 ft [1]
潮汐与钓鱼时间
74 ft 29° 31' 59" N 84° 37' 12" W
O Tower Navigational Tower 100 Ft. Above Water Sitting In A Barge
Date of Deployment: December 31 1977
Primary Material: BARGE STEEL
County: FRANKLIN
深度: 70 ft
[1]
潮汐与钓鱼时间
70 ft 29° 32' 12" N 84° 37' 4" W
Exxon Template Oil Rig Structure
Date of Deployment: December 31 1980
Primary Material: OIL RIG STRUCTURE
County: FRANKLIN
深度: 106 ft

高出海床的高度: 40 ft [1]
潮汐与钓鱼时间
106 ft 29° 17' 43" N 84° 36' 49" W
S Tower Navigational Tower 100 Ft. Above Water Sitting Inside A Barge
Date of Deployment: December 31 1980
Primary Material: BARGE STEEL
County: FRANKLIN
深度: 105 ft
[1]
潮汐与钓鱼时间
105 ft 29° 17' 58" N 84° 36' 39" W
Carrabelle 3 Mile Reef(6) 6 4Th Load Of 6 Deployment Dates 19 Pieces Off Site Pile
Date of Deployment: June 20 1993
Primary Material: CONCRETE CULVERTS (19)
Tonnage: 48
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 2" N 84° 34' 40" W
Carrabelle 3 Mile Reef (1) 1 1St Load Of 6 Deployment Dates 30 Pieces
Date of Deployment: June 5 1993
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 60
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 5" N 84° 34' 33" W
Carrabelle 3 Mile Reef (2) 2 Nd Load Of 6 Deployment Dates 30 Pieces
Date of Deployment: June 7 1993
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 60
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 4" N 84° 34' 31" W
Carrabelle 3 Mile Reef (1) 1 1St Of 4 Loads This Date 200 Tons Of Concrete Culverts
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
深度: 39 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 5" N 84° 34' 31" W
Carrabelle 3 Mile 2 Nd Load This Date 200 Total
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 4" N 84° 34' 30" W
Carrabelle 3 Mile Reef (3) 3 Rd Load Of 6 Deployment Dates 30 Pieces
Date of Deployment: June 9 1993
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 84
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 3" N 84° 34' 30" W
Carrabelle 3 Mile Reef (4) 4 4Th Load Of 6 Deployment Dates 37 Pieces
Date of Deployment: June 11 1993
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 109
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 3" N 84° 34' 30" W
Carrabelle 3 Mile 3 Rd Load This Date 200 Total
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
深度: 39 ft

高出海床的高度: 8 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 4" N 84° 34' 29" W
Carrabelle 3 Mile Reef (5) 5 4Th Load Of 6 Deployment Dates 23 Pieces
Date of Deployment: June 13 1993
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 58
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 1" N 84° 34' 28" W
Carrabelle 3 Mile 4 4Th Load This Date 200 Total
Date of Deployment: June 17 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 50
County: FRANKLIN
深度: 39 ft

高出海床的高度: 7 ft [1]
潮汐与钓鱼时间
39 ft 29° 45' 3" N 84° 34' 28" W
Yamaha Reef - Addition #3 Addition To Existing Barge Reef 95 Pieces Total.
Date of Deployment: May 4 1995
Primary Material: CONCRETE PILINGS
County: FRANKLIN
深度: 85 ft

高出海床的高度: 12 ft [1]
潮汐与钓鱼时间
85 ft 29° 34' 27" N 84° 32' 16" W
Yamaha Reef - Addition #4 First Load Of Two
Date of Deployment: May 2 1995
Primary Material: CONCRETE PILINGS
Tonnage: 306
County: FRANKLIN
深度: 85 ft

高出海床的高度: 10 ft [1]
潮汐与钓鱼时间
85 ft 29° 34' 25" N 84° 32' 16" W
Yamaha Reef - Yamaha #1 195’ X 35’ X 15’ Steel Barge.
Date of Deployment: December 27 1993
Primary Material: BARGE STEEL
County: FRANKLIN
深度: 85 ft

高出海床的高度: 15 ft [1]
潮汐与钓鱼时间
85 ft 29° 34' 25" N 84° 32' 16" W
Yamaha Reef - Southern Addition #1 2 Of 2 Loads This Grant Large Concrete I-Beams Oar
Date of Deployment: June 21 2001
Primary Material: CONCRETE L BEAMS (52)
Tonnage: 215.4
County: FRANKLIN
深度: 76 ft

高出海床的高度: 20 ft [1]
潮汐与钓鱼时间
76 ft 29° 34' 21" N 84° 32' 12" W
Yamaha Reef - Southern Addition #2 1 Of 2 Loads This Grant Large Concrete I-Beams Oar
Date of Deployment: June 18 2001
Primary Material: CONCRETE L BEAMS (42)
Tonnage: 161.1
County: FRANKLIN
深度: 76 ft

高出海床的高度: 20 ft [1]
潮汐与钓鱼时间
76 ft 29° 34' 21" N 84° 32' 12" W
Two Dogs Culverts 130 Culverts 8’X18 In 25 Patches 50 Feet Apart
Date of Deployment: June 24 1999
Primary Material: CONCRETE CULVERTS (130)
County: FRANKLIN
深度: 37 ft

高出海床的高度: 2 ft [1]
潮汐与钓鱼时间
37 ft 29° 45' 55" N 84° 31' 41" W
Two Dogs Reefballs 130 Pallet Balls In 25 Patches 50 Feet Apart
Date of Deployment: June 14 1999
Primary Material: MODULES CONCRETE REEFBALLS (130)
Tonnage: 117
County: FRANKLIN
深度: 37 ft

高出海床的高度: 4 ft [1]
潮汐与钓鱼时间
37 ft 29° 46' 4" N 84° 31' 29" W
Florida Gas Transmission Reef (B) Concrete Debris Donated By Florida Gas Transmission Company
Date of Deployment: January 6 2000
Primary Material: CONCRETE RUBBLE
Tonnage: 600
County: FRANKLIN
深度: 21 ft

高出海床的高度: 6 ft [1]
潮汐与钓鱼时间
21 ft 29° 49' 52" N 84° 30' 15" W
Rose City Reef 20 Fish Haven Towers And 30 Fish Havens
Date of Deployment: May 25 2003
Primary Material: MODULES CONCRETE FISH HAVEN (50)
Tonnage: 50
County: FRANKLIN
深度: 50 ft

高出海床的高度: 6 ft [1]
潮汐与钓鱼时间
50 ft 29° 40' 0" N 84° 30' 0" W
Bryson Additions 250 Tons Of Micellaneous Concrete Toward Stern Of Atlas
Date of Deployment: June 26 1998
Primary Material: CONCRETE RUBBLE
Tonnage: 250
County: FRANKLIN
深度: 79 ft

高出海床的高度: 6 ft [1]
潮汐与钓鱼时间
79 ft 29° 31' 20" N 84° 24' 34" W
Bryson Additions 150 Tons Of Miscellaneous Concrete Between Two Tugs
Date of Deployment: June 18 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: FRANKLIN
深度: 79 ft

高出海床的高度: 6 ft [1]
潮汐与钓鱼时间
79 ft 29° 31' 19" N 84° 24' 33" W
Bryson Memorial Reef 108 Foot Tugboat The Moonlighter 35 Feet Wide
Date of Deployment: February 11 1997
Primary Material: SHIP STEEL TUG 108’
County: FRANKLIN
深度: 75 ft

高出海床的高度: 29 ft [1]
潮汐与钓鱼时间
75 ft 29° 31' 15" N 84° 24' 32" W
Bryson Memorial Reef 85 Foot Tugboat The Atlas 35 Feet Wide
Date of Deployment: February 11 1997
Primary Material: SHIP STEEL TUG 85’
Tonnage: 200
County: FRANKLIN
深度: 79 ft

高出海床的高度: 22 ft [1]
潮汐与钓鱼时间
79 ft 29° 31' 20" N 84° 24' 31" W
K Tower Navigational Tower 100 Ft. Above Water Sitting Inside Hopper Barge
Date of Deployment: December 31 1981
Primary Material: BARGE STEEL
County: FRANKLIN
深度: 60 ft
[1]
潮汐与钓鱼时间
60 ft 29° 39' 58" N 84° 22' 9" W
V Tower Navigational Tower 100Ft. Above Water Sitting Inside Hopper Barge
Date of Deployment: December 31 1981
Primary Material: BARGE STEEL
County: FRANKLIN
深度: 70 ft
[1]
潮汐与钓鱼时间
70 ft 29° 24' 56" N 84° 20' 4" W