Ancient Mariner Site - Ancient Mariner
165' Uscg Cutter Ancient Mariner
Date of Deployment: December 31 1991
Primary Material: SHIP STEEL 165' USCG CUTTER
County: PALM BEACH
Ancient Mariner Site - Nemesis
165 Ft. Steel Us Coast Guard Cutter Nemesis
Date of Deployment: June 9 1991
Primary Material: SHIP STEEL 165'
County: BROWARD
Chuck-A-Luck Berry Patch
50 Ft. Steel House Boat The Chuck -A- Luck
Date of Deployment: September 12 1989
Primary Material: SHIP STEEL HOUSEBOAT 50'
County: BROWARD
Pennel's Reef
Dredge Pontoon
Date of Deployment: December 30 1993
Primary Material: STEEL DREDGE PONTOON
County: BROWARD
United Caribbean
140' X 25' Coastal Freighter
Date of Deployment: August 22 2000
Primary Material: SHIP STEEL 140'
County: PALM BEACH
Noula Express
114' Danish Freighter The Noula Express
Date of Deployment: October 18 1991
Primary Material: SHIP STEEL 114'
County: BROWARD
Noula Express
120 Foot Freighter Noula Express
Date of Deployment: December 31 1988
Primary Material: SHIP STEEL 120'
County: PALM BEACH
Tycom Mitigative Reef
375 Tons Of Limestone 3 To 5 Tons/Rock Mitigation Project
Date of Deployment: January 18 2001
Primary Material: ROCK LIMESTONE
Tonnage: 375
County: PALM BEACH
Tycom Mitigative Reef
425 Tons Of Limestone 3 To 5 Tons/Rock Mitigation Project
Date of Deployment: January 8 2001
Primary Material: ROCK LIMESTONE
Tonnage: 425
County: PALM BEACH
Sea Emperor
171' Hopper Barge Sea Emperor
Date of Deployment: December 31 1991
Primary Material: BARGE STEEL 171' HOPPER
County: PALM BEACH
Boca Raton Reef #1
19 Concrete Erojacks
Date of Deployment: December 31 1965
Primary Material: MODULES CONCRETE EROJACKS 19
County: PALM BEACH
Hydro Atlantic
325 Foot Dredge Hydro Atlantic
Date of Deployment: December 31 1987
Primary Material: SHIP STEEL 325' DREDGE
County: PALM BEACH
Hydroatlantic
300 Ft. Dredge Hydro Atlantic
Date of Deployment: December 7 1987
Primary Material: SHIP STEEL DREDGE 300'
County: BROWARD
Red Rock Reef
Non Grant -Beach Mitigation Project 6 Modules Stacked Rock
Date of Deployment: May 5 1988
Primary Material: ROCK LIMESTONE
Tonnage: 644
County: PALM BEACH
Spanish River High
Spanish River High School 50 Reefballs
Date of Deployment: May 19 1998
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: PALM BEACH
Csa Modules
12 Concrete Modules
Date of Deployment: December 31 1992
Primary Material: MODULES CONCRETE CSA 12
County: PALM BEACH
Boynton Fish Corridors
Rock Corridor Linking Bud Bar To Mv Becks
Date of Deployment: June 20 2003
Primary Material: ROCK LIMESTONE
Tonnage: 1300
County: PALM BEACH
Genesis Reef
2300 Tons Culverts And Catch Basins. 300' From Swordfish.
Date of Deployment: September 21 1989
Primary Material: CONCRETE 2300 TONS
Tonnage: 2300
County: PALM BEACH
Boynton Beach Corridors Site #1
1 To 4 Ton Boulders 420X30x7feet ,103200 Project Total
Date of Deployment: July 29 1998
Primary Material: ROCK LIMESTONE
Tonnage: 3000
County: PALM BEACH
Swordfish
70' Vessel Swordfish
Date of Deployment: December 31 1992
Primary Material: SHIP STEEL 70' VESSEL
County: PALM BEACH
M/V Castor
M/V Castor Coastal Freighter Customs Seizure 258' X37'beam X45'tall
Date of Deployment: December 15 2001
Primary Material: SHIP STEEL 258'
Tonnage: 1415
County: PALM BEACH
Bud Bar
150 Feet Freighter Bud Bar
Date of Deployment: December 31 1985
Primary Material: SHIP STEEL 150' FREIGHTER
County: PALM BEACH
Becks Reef
195 Foot Ship The Becks Aka The Captain Tony County Not Involved
Date of Deployment: October 22 1996
Primary Material: SHIP STEEL 195'
County: PALM BEACH
Raggs Reef
50 Feet Diameter Pile Of Limestone Rock
Date of Deployment: July 27 2006
Primary Material: ROCK LIMESTONE
Tonnage: 357
County: PALM BEACH
Boynton Inlet Reef
Rock
Date of Deployment: December 31 1994
Primary Material: ROCK
Tonnage: 900
County: PALM BEACH
Boyton Kiwanis-Miller Lite Reef
317' X 45' X 23' Steel Cargo Ship The M/V Skycliffe Upright On Bottom
Date of Deployment: November 2 1991
Primary Material: SHIP STEEL 315'
Tonnage: 2500
County: PALM BEACH
Kreusler Park
350' X 25' X 2-3' Reef Of Concrete And Rock.
Date of Deployment: July 1 1994
Primary Material: ROCK LIMESTONE
Tonnage: 575
County: PALM BEACH
Pep Reef Boulders
Rocks North Of Pep Modules On Fabric Cloth
Date of Deployment: November 22 1999
Primary Material: ROCK LIMESTONE (300)
Tonnage: 450
County: PALM BEACH
Pep Reef
240 Concrete Modules As A Breakwater 4000 Feet Long
Date of Deployment: December 31 1995
Primary Material: CONCRETE STRUCTURES 240
County: PALM BEACH
Rybovich Reef
Pyramid Modules And Rock
Date of Deployment: August 20 1991
Primary Material: PYRAMID MODULES AND ROCK
County: PALM BEACH
Jewfish Ledges (Bay)
Deployed In Lake Worth Lagoon Targeting Snook/Jewfish.
Date of Deployment: June 7 1995
Primary Material: CONCRETE BEAMS
Tonnage: 270
County: PALM BEACH
Rybovich Reef
14 Pieces Of Jersey Barriers And Concrete On Trammel Screen
Date of Deployment: October 7 1999
Primary Material: CONCRETE BARRIERS
County: PALM BEACH
Firehock Memorial Reef
7 Ft X 10 Ft X 7 Ft Concrete Diver Sculpture
Date of Deployment: September 2 2005
Primary Material: CONCRETE SCUPLTURE
Tonnage: 3
County: PALM BEACH
Shasha Boekanier
185 Ft.Steel Ship The Shasha Boekanier 1 Of 4 Ships This Riverwalk
Date of Deployment: February 17 2002
Primary Material: SHIP STEEL 185'
Tonnage: 678
County: PALM BEACH
Governor's River Walk Corridors
Rock Corridor Linking St.Jaques To Gilbert Sea Six Piles
Date of Deployment: June 16 2005
Primary Material: ROCK LIMESTONE
Tonnage: 1200
County: PALM BEACH
Thozina
175 Ft.Steel Ship The Thozina 4 Of 4 Ships This Riverwalk Project
Date of Deployment: December 15 2002
Primary Material: SHIP STEEL 175'
Tonnage: 600
County: PALM BEACH
St Jacques
174 Ft.Steel Ship The St Jacques 2 Of 4 Ships This Riverwalk Proje
Date of Deployment: March 15 2002
Primary Material: SHIP STEEL 174'
Tonnage: 600
County: PALM BEACH
Governor's River Walk Corridors-200
Rock Corridor Linking Shasha Boekanier To Gilbert Sea Three Piles
Date of Deployment: June 30 2006
Primary Material: ROCK LIMESTONE
Tonnage: 864
County: PALM BEACH
Gilbert Sea
175 Ft.Steel Ship The Gilbert Sea 3 Of 4 Ships This Riverwalk Proj
Date of Deployment: March 17 2002
Primary Material: SHIP STEEL 175'
Tonnage: 500
County: PALM BEACH
Cross Current Barge
Barge Surrounded By Rocks From Paradise Reef
Date of Deployment: May 31 1998
Primary Material: BARGE STEEL 195'
County: PALM BEACH
Cross Current Barge Reef
Rocks Near Barge
Date of Deployment: October 21 1999
Primary Material: ROCK LIMESTONE
Tonnage: 1045
County: PALM BEACH
Paradise Rock
Deployed Over 14 Day Period 1-3 Foot Rocks1nm @ 170* From Inlet
Date of Deployment: June 30 1997
Primary Material: ROCK LIMESTONE
Tonnage: 1200
County: PALM BEACH
Lake Worth Inlet
6200 Tons Concrete
Date of Deployment:
Primary Material: CONCRETE
Tonnage: 6200
County: PALM BEACH
Tri-County
1800 Tons Of Concrete Culverts And Catch Basins.
Date of Deployment: September 15 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 1800
County: PALM BEACH
Tso Paradise
82 Foot Yacht Called The Tso Paradise
Date of Deployment:
Primary Material: SHIP STEEL 82
County: PALM BEACH
Eidsvag
150' Freighter Eidsvag
Date of Deployment: December 31 1985
Primary Material: SHIP STEEL 150' FREIGHTER
County: PALM BEACH
The Playground - Site 2
700 Tons Of Concrete Light Poles And Concrete Culverts.
Date of Deployment: June 29 1988
Primary Material: CONCRETE CULVERTS
Tonnage: 700
County: PALM BEACH
Princess Anne
340' X 58' X 52' Steel Ferry. Hull Has Broken Into 2 N/S Sections.
Date of Deployment: May 23 1993
Primary Material: SHIP STEEL FERRY 340'
Tonnage: 2700
County: PALM BEACH
Peanut Island -Ne
Peanut Island Snorkel Reef,42409 Local Funds
Date of Deployment: February 16 2002
Primary Material: CONCRETE MODULES-FISH HAVENS (43)
Tonnage: 50
County: PALM BEACH
Mizpah
185 Feet Yacht Mizpah
Date of Deployment: December 31 1968
Primary Material: SHIP STEEL 185' YACHT
County: PALM BEACH
South Corridors Reef
South Corridor Of Rock Connects Mizpah With Amaryllis
Date of Deployment: July 26 1994
Primary Material: ROCK LIMESTONE
Tonnage: 1260
County: PALM BEACH
Ande Reef
293 Foot Ship Previous Name Jed Carrier ,145000 Total
Date of Deployment: November 24 1996
Primary Material: SHIP STEEL 295'
Tonnage: 1967
County: PALM BEACH
Amaryllis
440 Feet Freighter Amaryllis
Date of Deployment: December 31 1968
Primary Material: SHIP STEEL 440' FREIGHTER
County: PALM BEACH
Classic Barge P6
Steel Barge 195 Ft. Hopper.
Date of Deployment: June 20 1989
Primary Material: BARGE STEEL 195'
Tonnage: 300
County: PALM BEACH
North Corridors Reef
North Half Of Corridors Connects Amaryllis With Pbrrt Barge
Date of Deployment: July 26 1994
Primary Material: ROCK LIMESTONE
Tonnage: 1260
County: PALM BEACH
Research Team Reef
Barges And Concrete
Date of Deployment: December 31 1968
Primary Material: BARGES
County: PALM BEACH
Lake Worth Inlet
Barge
Date of Deployment:
Primary Material: BARGE
County: PALM BEACH
The Playground - Site 1
1500 Tons Of Concrete Culverts-And Miscellaneous Concrete And Steel.
Date of Deployment: August 21 1986
Primary Material: CONCRETE CULVERTS
Tonnage: 1500
County: PALM BEACH
Classic Barge P1
195 Foot Long Steel Hopper Barge The P1
Date of Deployment: June 20 1989
Primary Material: BARGE STEEL 195'
County: PALM BEACH
Spearman's Barge
100 Feet Deck Barge Spearman's
Date of Deployment: December 31 1978
Primary Material: BARGE STEEL DECK 100'
County: PALM BEACH
Sugar Sands Ledges (Bay)
8 Platform Modules 60 X 40 X 5 Also 2000 Tons Limestone Rock
Date of Deployment: June 20 1996
Primary Material: CONCRETE BEAMS
Tonnage: 2000
County: PALM BEACH
Royal Park Bridge
Bridge Demolition 500' Long X 150' Wide. Over 1000 Pieces
Date of Deployment: June 15 2001
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 13000
County: PALM BEACH
Murpghy Ii Barge
110' Deck Barge Murphy Ii
Date of Deployment: December 31 1994
Primary Material: BARGE STEEL DECK 110'
County: PALM BEACH
Ratican
Concrete Culverts-55' Steel Ship And 72' Sailboat.
Date of Deployment: June 3 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 400
County: PALM BEACH
Sea Mist II
265' X 43 'Coastal Freighter TheSea Mist Ii
Date of Deployment: May 25 2001
Primary Material: SHIP STEEL 265'
County: PALM BEACH
M/V Zion Train
164 Ft.Steel Ship The Zion Train (,25000-Local Funding)
Date of Deployment: June 2 2003
Primary Material: SHIP STEEL 164'
County: PALM BEACH
Jupiter Inlet
250 Tons Concrete
Date of Deployment: December 31 1990
Primary Material: CONCRETE RUBBLE
Tonnage: 250
County: PALM BEACH
Miss Jenny
55' X 50' X 25' Dredge Barge. 300' South Of Esso Bonaire.
Date of Deployment: December 11 1990
Primary Material: BARGE STEEL/DREDGE
Tonnage: 100
County: PALM BEACH
Esso Bonaire
147 Feet Long Esso Bonaire Iii Tanker
Date of Deployment: December 31 1989
Primary Material: SHIP STEEL 124'
County: PALM BEACH
Three Tugs
Three Tugboats
Date of Deployment: April 21 1998
Primary Material: SHIP STEEL TUGBOATS
County: PALM BEACH
Mg-111 Barge
195' Hopper Barge Mg11 With 1000 Tons Of Concrete
Date of Deployment: September 28 1995
Primary Material: BARGE STEEL 195' HOPPER MG
Tonnage: 1000
County: PALM BEACH