Citrus #2 Big Bend Reefs
96 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: June 20 1995
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: CITRUS
Citrus #1 Big Bend Reefs
24 Pre-Fabricated Cubes One Meter On A Side -50M Spaced Hexagon
Date of Deployment: June 15 1995
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: CITRUS
Cedar Key Reef Site 2
333 Yards. Concrete Rubble Second Of 10 Loads
Date of Deployment: August 19 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 2
27 Pieces Of Pipe Tenth And Last Of 10 Loads
Date of Deployment: April 18 1989
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 2
25 Pieces Of Pipe Seventh Of 10 Loads
Date of Deployment: December 7 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 2
13 Concrete Pyramids 6X5x5 Fourth Of 10 Loads
Date of Deployment: September 23 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Suwannee Regional Reefs
First 12 Concrete Module Sites-Phase I Res. Reefs-Ll=Site A 7/23/97
Date of Deployment: October 30 1990
Primary Material: MODULES CONCRETE CUBES
County: LEVY
Suwannee Regional Reef
Site A 16 Cubes X 740 Feet (225 M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: LEVY
Suwannee Regional Reef
Site B 4 Cubes X 80 Feet (25 M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: LEVY
Suwannee Regional Reef
Site C 16 Cubes X 80 Feet (25 M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: LEVY
Suwannee Regional Reef
Site D 4 Cubes X 740 Feet (225 M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: LEVY
Levy #2 Big Bend Reefs
96 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: June 22 1995
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: LEVY
Levy #1 Big Bend Reefs
24 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: June 22 1995
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: LEVY
Suwannee Regional Reef
Site E 4 Cubes X 740 Feet (225 M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: LEVY
Suwannee Regional Reef
Site F 16 Cubes X 80 Feet (25M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: LEVY
Cedar Key Reef Site 1
108 Concrete Modules 35X 20X12 6 Plots Of 36 Each/2 Days
Date of Deployment: August 25 1986
Primary Material: MODULES CONCRETE STONE CRAB (108)
County: LEVY
Cedar Key #1
108 Stone Crab Modules 36 Also At 396.9/532.8 And 397.5/534.9
Date of Deployment: August 26 1986
Primary Material: MODULES CONCRETE STONE CRAB (108)
County: LEVY
Cedar Key Reef Site 3
60 Pieces -18 To 40 Inches First Of 10 Under This Grant
Date of Deployment: July 21 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 3
36 Pipes And Six Slabs Third Of 10 Loads
Date of Deployment: August 30 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 3
20 Pieces Of Pipe Ninth Of 10 Loads
Date of Deployment: January 30 1989
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 3
43 Pieces Of Pipe Fifth Of 10 Loads
Date of Deployment: October 28 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 3
53 Pieces Of Pipe Sixth Of 10 Loads
Date of Deployment: November 10 1988
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key Reef Site 3
33 Pieces Of Pipe Eighth Of 10 Loads
Date of Deployment: January 10 1989
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key 31
All 40 At The Listed Coordinates 7 4Th And Final Drop Of 7 This Grant
Date of Deployment: September 24 1986
Primary Material: CONCRETE CULVERTS 40
County: LEVY
Coal Ash Reef
Experimental Coal Ash Concrete Blocks
Date of Deployment: December 31 1985
Primary Material: CONCRETE COAL ASH
County: LEVY
Cedar Key Reef
Concrete Culverts 1 1St Of Two Load This Grant
Date of Deployment: August 12 1985
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key #1
80 Total 3 Drops This Date 23# At 398.4/549.7 And 27# At 398.8/549.0
Date of Deployment: September 2 1986
Primary Material: CONCRETE CULVERTS 80
County: LEVY
Cedar Key Reef
Concrete Culverts 2Nd Of Two Loads This Grant
Date of Deployment: August 19 1985
Primary Material: CONCRETE CULVERTS
County: LEVY
Cedar Key #1
All 85 At The Listed Coordinates
Date of Deployment: September 18 1986
Primary Material: CONCRETE CULVERTS 85
County: LEVY
Cedar Key #1
87 Total3 Drops This Date 13# At 398.8/549.0 And 34# At 398.3/548.2
Date of Deployment: September 9 1986
Primary Material: CONCRETE CULVERTS 87
County: LEVY
Cedar Key #1
85 Total3 Drops This Date 40# At 398.8/548.1 And 4 At 398.8/549.0
Date of Deployment: September 5 1986
Primary Material: CONCRETE CULVERTS 85
County: LEVY
White City Bridge
Steel And Concrete Rubble From White City Bridge.
Date of Deployment: October 1 1991
Primary Material: BRIDGE RUBBLE
County: LEVY
Suwannee Regional Reef
Site G 4 Cubes X 80 Feet (25M) North Patch
Date of Deployment:
Primary Material: MODULES CONCRETE CUBES (24)
County: DIXIE
Betty Castor Reef
Concrete Modules Part Of High School Project Poly Drums With Concret
Date of Deployment: December 31 1989
Primary Material: MODULES CONCRETE
County: LEVY
Suwannee Regional Reef
Site H 16 Cubes X 740 Feet (225M) North Patch
Date of Deployment: October 14 1992
Primary Material: MODULES CONCRETE CUBES (96)
County: DIXIE
Dixie #2 Big Bend Reefs
96 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: July 12 1995
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: DIXIE
Nw Red Banks Reef
Car Bodies Refrigerators And Scrap Metal
Date of Deployment: December 31 1964
Primary Material: AUTOMOBILE BODIES
County: DIXIE
Dixie #1 Big Bend Reefs
24 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: July 12 1995
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: DIXIE
Reef Ball Reef
Last Load Of 7 (Also 11/2011/2111/22& 11/28/95)-24 Reefballs
Date of Deployment: November 30 1995
Primary Material: MODULES CONCRETE REEFBALLS(130)
County: DIXIE
Horseshoe Reef #1
200 Tons Of Concrete Blocks-Limestone Rock-And Railroad Arms.
Date of Deployment: September 11 1993
Primary Material: CONCRETE BLOCKS
Tonnage: 200
County: DIXIE
Horseshoe Reef
Concrete Culverts And Reef Balls And Rubble
Date of Deployment: December 31 1993
Primary Material: CONCRETE CULVERTS
County: DIXIE
Suwannee Regional Reef
Site I 16 Cubes X 80 Feet (25M) North Patch
Date of Deployment: March 26 1991
Primary Material: MODULES CONCRETE CUBES (96)
County: DIXIE